The engineers on site really needs to understand customer first experience their way of addressing issues after highlighting multiple times is pathetic, I own flats there but one of the worst project I have invested. God knows when this…
Overview
Overview
Overview
Photo: Sattva AeropolisThe engineers on site really needs to understand customer first experience their way of addressing issues after highlighting multiple times is pathetic, I own flats there but one of the worst project I have invested. God knows when this…
We bought the unit on September 2023 and during the purchase sales representative promised they will handover it on May/June 2026 where official RERA is July 2026 . Now all the dates missed and they are giving excuses the delay due the WAR…
I had a wonderful experience purchasing my studio apartment at Sattva Aeropolis. A special thanks to Ms. Ashwini for her exceptional professionalism and support throughout the entire process. She patiently answered all my questions,…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
177 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED | Apartment | 280–635 sqft carpet (as filed) | Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
8 of 263 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva Aeropolis in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BIAPPA) | Sanctioned 2 Sep 2025 · No. BIAAPA/TP/CC/289/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/265/2024 · issued 21 Dec 2024 | Clear |
| Environmental clearance | SEIAA 115 CON 2024 · EC identification no. EC24C3801KA5562922N · issued 10 Feb 2025 | Clear |
| Airport height NOC | issued 8 Feb 2016 · permissible top elevation 937.14 m above mean sea level · validity ended 7 Feb 2021 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 16 Oct 2028 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 39/2, 41/1 | Converted 5 Feb 2013 · Deputy commissioner Bangalore Rural District | |
| Sy 43 | Converted 8 Apr 2010 · Deputy commissioner Bangalore Rural District | |
| Sy 44 | Converted 26 Nov 2008 · Deputy Commissioner, Bangalore rural | |
| Sy 75/1 | Converted 8 Apr 2010 · Deputy Commissioner, Bangalore rural | |
| Survey numbers | 39/2 · 41/1 · 43 · 44 · 75/1 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
1BHK · avg 26 m² 86.1%3BHK · avg 60 m² 13.9%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 477 | 282 |
| 3BHK | 77 | 644 |
| Sold, Q2 2026-27 | 325 / 554 | |
|---|---|---|
| Unsold, Q2 2026-27 | 229 | |
| Months to sell, derived from filed bookings | 36 months |
| Aeropolis, A Project Of Sattva Group | about 0.5 km | Locked | |
|---|---|---|---|
| Sattva Vasanta Cove | 1.6 km | Locked | |
| Sattva Vasanta Skye | 1.8 km | Locked | |
| Varnam Phase 1c | about 2.5 km | Locked |
| Sattva Aeropolis This project | This project is the point the others are measured from | 16 Oct 2028 | 59% (325 of 554) | Not verified yet |
|---|---|---|---|---|
| Aeropolis, A Project Of Sattva Group | about 0.5 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
| Sattva Vasanta Cove | 1.6 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 14.1 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 250 m to the north, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 40% | |
| Outdoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 19% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.41 (226 covered spaces for 554 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 67% · planned by 27 Jul 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 18 Aug 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 39% | |
| Completion, accountant | 43.6% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 16 Oct 2028 | |
| RERA completion date | 16 Oct 2028 | |
| Work began, as filed | 1 Oct 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 34.94 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/265/2024 · issued 21 Dec 2024 | |
| Environmental clearance | SEIAA 115 CON 2024 · EC identification no. EC24C3801KA5562922N · issued 10 Feb 2025 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 5 Sep 2025 | |
| Engineer's certificate, registration | Dated 5 Sep 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹17.85 Cr 14.6%Development · ₹104.61 Cr 85.4%
| Estimated cost | ₹122.46 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹96.47 Cr | |
| Cost incurred | ₹53.41 Cr (43.6% of the estimate) | |
| Cost left | ₹69.05 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹90.63 Cr | |
| Land cost revision | Not verified yet | |
Sold (325) 58.7%Unsold (229) 41.3%
| Sold, Q3 2025-26 | 267 / 554 · 287 available | |
|---|---|---|
| Sold, Q4 2025-26 | 288 / 554 · 266 available | |
| Sold, Q1 2026-27 | 329 / 554 · 225 available | |
| Sold, Q2 2026-27 | 325 / 554 · 229 available | |
| Unsold, Q2 2026-27 | 229 | |
| Sold in Q4 2025-26 | 21 | |
| Sold in Q1 2026-27 | 41 | |
| Sold in Q2 2026-27 | 4 bookings cancelled or corrected (329 → 325 sold) |
| Escrow bank | ICICI Bank · Commissariat Road | |
|---|---|---|
| Designated account, collected | ₹36.93 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹11.53 Cr in Q2 2026-27 (31% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 26 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 10 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 2 Sep 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Commissariat Road | |

Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Vasanta Cove, price locked; Sattva Vasanta Skye, price locked; Birla Trimaya Phase-3, price locked; Godrej MSR City, price locked.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 2.5 km | Locked |
|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 2.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 2.5 km | Locked |
|---|
| Birla Trimaya Phase-3 | 2.4 km | Locked |
|---|
| Godrej MSR City | 2.6 km | Locked |
|---|
| Birla Trimaya | about 2.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 2.5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 2.5 km | Locked |
|---|
| Sattva Vasanta Skye | 1.8 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Varnam Phase 1c | about 2.5 km | 31 Mar 2031 | 92% (275 of 298) | Locked |
|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 2.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 2.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
|---|
| Projects within 4 km, counted | 26 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 10,859 | |
| Booked | 8,063 of 10,859 (74%) | |
| Unsold | 2,796 | |
| Booked a month, pooled | 125 flats | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | 9.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 2.1 km, Airport City | |
| Kempegowda Airport | 8.0 | 10 | 3.9 |
| MG Road (CBD) | 30.4 | 31 | 27.4 |
| Manyata Tech Park | 25.6 | 27 | 19.5 |
| ITPL, Whitefield | 38.3 | 40 | 26.1 |
| Ecospace, Bellandur ORR | 46.0 | 51 | 31.9 |
| Electronic City Ph 1 | 50.3 | 55 | 41.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 2.5 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the east |