Overview
VRR Golden Enclave Phase II
Part ofVRR Golden Enclave2 phases, 97 flats
Overview
Part ofVRR Golden Enclave2 phases, 97 flats
Overview
Part ofVRR Golden Enclave2 phases, 97 flats
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 14 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open VRR Golden Enclave Phase II in the interactive atlas
Approval or registration
Land use converted
Special Deputy Commissioner · Survey 355
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Hulimangala Gram Panchyat · Survey 355
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan NM/AS/AA03/TS02/S/05/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/211222/005548
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 355 | |
|---|---|---|
| Land extent, Sy 355 | 28,328 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 28,327 sq m | |
| Khata | E Khatha · Hulimangala Gram Panchyat · 26 May 2020 | |
| Building plan (BDA) | Sanctioned 13 Sep 2021 · No. NM/AS/AA03/TS02/S/05/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 23 Dec 2009 · Special Deputy Commissioner | |
|---|---|---|
| Survey numbers | 355 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Villa · avg 441 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Villa | 46 | 4,743 |
| Ramky One Karnival | about 1 km | Locked | |
|---|---|---|---|
| Vasuki Vallabha | about 3.5 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | about 4.5 km | Locked | |
| Sowmya Skyla | about 4.5 km | Locked | |
| Abhee Serenity Springs |
| VRR Golden Enclave Phase II This project | This project is the point the others are measured from | 31 Dec 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Ramky One Karnival | about 1 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
| Vasuki Vallabha | about 3.5 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 5.5 km, SUBASH NAGARA | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.31 (26 covered spaces for 84 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Hulimangala Gram Panchayat) | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 28 Jan 2025 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Dec 2027 | |
|---|---|---|
| Schedule end | 14 Feb 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Aug 2021 |
| Structure | RCC structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Living and dining: marble; Bedrooms: vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 14869 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 8 Mar 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹37.93 Cr 46.1%Development · ₹44.36 Cr 53.9%
| Estimated cost | ₹82.29 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹82.29 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (34) 73.9%Unsold (12) 26.1%
| Flats sold, at completion | 34 | |
|---|---|---|
| Flats unsold, at completion | 12 | |
| Flats in the phase | 46 |
| Escrow bank | Karnataka Bank Ltd. · Koramangala | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 13 Sep 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karnataka Bank Ltd. · Koramangala | |
| about 4.5 km |
| Locked |
| K&T's Sai Sannidhi | about 5 km | Locked |
|---|
| Mahindra Zen | about 5.5 km | Locked |
|---|
| Mahindra NewHaven | about 5.5 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | about 5.5 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 5.5 km | Locked |
|---|
| Azur Phase 2 | about 6 km | Locked |
|---|
| Assetz Ren & Rei | about 6.5 km | Locked |
|---|
| Shriram Sapphire (Codename Ultimate) |
|---|
| about 4.5 km |
| 5 Nov 2028 |
| 100% (414 of 414) |
| Locked |
| Sowmya Skyla | about 4.5 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Abhee Serenity Springs | about 4.5 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
|---|
| K&T's Sai Sannidhi | about 5 km | 31 Dec 2025 | 68% (27 of 40) | Locked |
|---|
| Projects within 4 km, counted | 25 (25 with an approximate location) | |
|---|---|---|
| Flats in them | 6,169 | |
| Booked | 2,553 of 6,169 (41%) | |
| Unsold | 3,616 | |
| Booked a month, pooled | 90 flats | |
| Months to sell, pooled | 40 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 3 km, Hebbagodi | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 55 | 42 |
| MG Road (CBD) | 20.5 | 18 |
| Manyata Tech Park | 31 | 25 |
| ITPL, Whitefield | 28.5 | 20 |
| Ecospace, Bellandur ORR | 18.5 | 11.5 |
| Electronic City Ph 1 | 4.5 | 3 |
| Landfill or waste transfer station | about 3 km to the north-west, named Bingipura Quarry Pit Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |