| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 79 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Soul@godrej Ananda in the interactive atlas
Approval or registration
Khata issued
E Khatha · Panchayat · Survey 176
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan KIADB/DO & EE-3/Plot No.R10/Hardware Sector / 2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/161023/006323
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 23 Aug 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | Plot No. R-10 ,Sy No. 176 (Blo | |
|---|---|---|
| Land extent, Sy Plot No. R-10 ,Sy No. 176 (Blo | 82,266 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 34,407 sq m | |
| Khata | E Khatha · Panchayat · 18 Mar 2022 | |
| Building plan (KIADB) | Sanctioned 24 May 2023 · No. KIADB/DO & EE-3/Plot No.R10/Hardware Sector / 2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/431/2022 · issued 19 Dec 2022 | Clear |
| Environmental clearance | SEIAA 95 CON 2020 · issued 13 Aug 2020 | Clear |
| Airport height NOC | permissible top elevation 1001.62 m above mean sea level | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 30 Aug 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | Plot No. R-10 ,Sy No. 176 (Blo |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
1BHK type-04 · avg 18 m² 28.1%1BHK type-03 · avg 41 m² 28.1%1BHK type-05 · avg 18 m² 11.1%2BHK-type-04 · avg 68 m² 11.1%14 other types 21.6%
| 1BHK type-01 | 46 | 19,095 |
| 1BHK type-02 | 46 | 19,095 |
| 1BHK type-03 | 621 | 2,71,918 |
| 1BHK type-04 | 621 | 1,18,511 |
| 1BHK type-05 | 245 | 46,963 |
| 1BHK type-6a | 5 | 2,196 |
| 1BHK type-6b | 1 | 431 |
| 1BHK type-6c | 2 | 872 |
| 1BHK type0-6 | 3 | 1,313 |
| 2BHK type-01 | 89 | 51,925 |
| 2BHK type-02 | 95 | 55,423 |
| 2BHK type-03 | 48 | 28,976 |
| 2BHK-type-04 | 245 | 1,78,821 |
| 2BHK-type-05 | 5 | 3,660 |
| 2BHK-type-5a | 3 | 2,185 |
| 2BHK-type-5b | 2 | 1,464 |
| Sold, Q2 2026-27 | 2,148 / 2,210 | |
|---|---|---|
| Unsold, Q2 2026-27 | 62 |
| Assetz Sora & Saki Phase 2 | about 0.5 km | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 3 | about 1 km | Locked | |
| Kumar Plumeria | about 2.5 km | Locked | |
| Birla Trimaya | about 4.5 km | Locked | |
| Birla Trimaya Phase-2 |
| Soul@godrej Ananda This project | This project is the point the others are measured from | 30 Aug 2028 | 97% (2,148 of 2,210) | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 0.5 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | about 1 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 9 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 60% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.66 (1,467 covered spaces for 2,210 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 81% · planned by 28 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 27 Feb 2028 | |
| Internal roads | Not verified yet | |
| Club house | 60% | |
| Completion | 63% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 27 Mar 2028 | |
| RERA completion date | 30 Aug 2028 | |
| Work began, as filed | 1 Sep 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Tower 8 69.7 m, Tower 9 69.7 m, Tower 10 69.7 m, Tower 11 75.6 m, Tower 12 75.6 m, Tower 13 75.6 m, Tower 14 75.6 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 199.76 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/431/2022 · issued 19 Dec 2022 | |
| Environmental clearance | SEIAA 95 CON 2020 · issued 13 Aug 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹39.54 Cr 6.1%Development · ₹610.63 Cr 93.9%
| Estimated cost | ₹650.17 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹730.84 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (2,148) 97.2%Unsold (62) 2.8%
| Sold, Q3 2025-26 | 2,148 / 2,210 · 62 available | |
|---|---|---|
| Sold, Q4 2025-26 | 2,179 / 2,210 · 31 available | |
| Sold, Q1 2026-27 | 2,148 / 2,210 · 62 available | |
| Sold, Q2 2026-27 | 2,148 / 2,210 · 62 available | |
| Unsold, Q2 2026-27 | 62 | |
| Sold in Q4 2025-26 | 31 | |
| Sold in Q1 2026-27 | 31 bookings cancelled or corrected (2,179 → 2,148 sold) | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · M G Road | |
|---|---|---|
| Designated account, collected | ₹15.53 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹49.66 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 23 Aug 2023 | Review |
| Building plan (KIADB) | Sanctioned 24 May 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · M G Road | |

| 3BHK type-01 | 46 | 41,226 |
| 3BHK type-02 | 87 | 77,974 |
| about 4.5 km |
| Locked |
| Ekta Elements | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5 km | Locked |
|---|
| Varnam Phase 1c | about 5 km | Locked |
|---|
| Assetz Zen & Sato | about 5.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 5.5 km | Locked |
|---|
| Sattva City | about 5.5 km | Locked |
|---|
| Godrej MSR City | about 6 km | Locked |
|---|
| Kumar Plumeria | about 2.5 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
|---|
| Birla Trimaya | about 4.5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Birla Trimaya Phase-2 | about 4.5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Ekta Elements | about 5 km | 31 Dec 2027 | Not filed | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 12,571 | |
| Booked | 9,012 of 12,571 (72%) | |
| Unsold | 3,559 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5.5 km, Airport City | |
| Kempegowda Airport | 12.5 | 6.5 |
| MG Road (CBD) | 24 | 21 |
| Manyata Tech Park | 17.5 | 13 |
| ITPL, Whitefield | 28.5 | 19 |
| Ecospace, Bellandur ORR | 35 | 24.5 |
| Electronic City Ph 1 | 44 | 34.5 |
| Landfill or waste transfer station | about 1 km, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Bagalur Substation on OpenStreetMap |