Taken 1 Jul 2026| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 142 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 3 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Axis OaklynCompleted · OC 27-04-2026 | AXIS CONCEPT CONSTRUCTION PVT LTD | Apartment | 707–958 sqft carpet (as filed) | Completed |
| Century OneWorld SerayaActive · 92% built | Century Real Estate | Plot | 1,194–3,616 sqft | May 2029 |
| Hanging GardensRegistered · no quarterly update yet | Graviti Living Spaces (India) Pvt Ltd | Apartment | 846–1,496 sqft carpet (as filed) | Sep 2030 |
| Millionaire TowerActive · 21% built | ARTISMO | Mixed development | 301–1,123 sqft carpet (as filed) | Sep 2029 |
| Purva Aerocity | Puravankara | Apartment | 1,187–2,046 sqft | Dec 2029 |
| Ramya Water FrontActive · 45% built | RAMYA ESTATES | Villa | 3,220 sqft carpet (as filed) | Jun 2027 |
| Smr Vinay GatewayLapsed · completion date passed | SMR BLUE VALLEY PROJECTS PRIVATE LIMITED | Apartment | 323–1,012 sqft carpet (as filed) | Sep 2024 |
| Vss EnclaveCompleted (regulator flag) | STATURE HOMES BUILDERS AND DEVELOPERS | Apartment | 676–789 sqft carpet (as filed) | Completed |
All 8 other projects in Chikkajala, A to Z. Status is taken from each project's own filing.
All 10 projects in Chikkajala → · Sattva Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva City in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BIAPPA) | Sanctioned 24 Feb 2026 · No. BIAAPA/TP/CC/496/2025-26/3248 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/529/2024 · issued 8 May 2025 | Clear |
| Environmental clearance | SEIAA 138 CON 2024 · EC identification no. EC24B3813KA5892498N · issued 3 Mar 2025 | Clear |
| Airport height NOC (1 of 2) | NOC ID BIAL/SOUTH/B/090523/785049 · issued 25 Sep 2023 · valid until 24 Sep 2031 | Clear |
| Airport height NOC (2 of 2) | NOC ID BIAL/SOUTH/B/090523/784931 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 28 Feb 2032 |
| Land conversion | 21 of 21 parcels converted | |
|---|---|---|
| Sy 5/2 | Converted 27 Sep 1994 · office of the Deputy Commissioner, Bangalore District | |
| Sy 4/2, 67 | Converted 20 Aug 1996 · office of the Deputy Commissioner, Bangalore District | |
| Sy 45 | Converted 5 Sep 1996 · office of the Deputy Commissioner, Bangalore District | |
| Sy 4/3 | Converted 7 Oct 2023 · office of the Deputy Commissioner, Bangalore District | |
| Sy 167 | Converted 23 Feb 1996 · office of the Deputy Commissioner, Bangalore District | |
| Sy 169/1 | Converted 17 Jan 1994 · office of the Deputy Commissioner, Bangalore District | |
| Other parcels | 8 more groups on the filing | |
| Survey numbers | 5/2 · 4/2 · 45 · 4/3 · 67 · 167 · 169/1 · 169/2 · 172/1 · 172/2 · 172/3 · 176/1 · 176/2 · 177 · 178/1 · 178/2 · 179 · 180 · 181/2 · 185 · 43/16 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
| Forfeiture, agreement | The booking amount | |
|---|---|---|
| Forfeiture, allotment letter | Not verified yet | |
| Transfer fee | Not verified yet | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Defect liability | 5 years | |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | A 400 kV line crosses the site, its corridor taking about 9% (about 19,120 m²), with 2 transmission towers standing inside the outline | Review |
| Nearest government-flagged flood location | 9.8 km, Kondappa layout | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 840 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 600 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.70 (4,218 covered spaces for 2,477 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it
Taken 1 Jul 2026| Main structure | Not started · planned by 18 May 2031 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 10 Oct 2031 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 7% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 28 Feb 2032 | |
| RERA completion date | 28 Feb 2032 | |
| Completion date, agreement | 28 Feb 2032 | |
| Work began, as filed | 1 Mar 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Block 1-Wing A 71.95 m, Block 1-Wing B 71.95 m, Block 2 Wing A 71.95 m, Block 2-Wing B 71.95 m, Block 3-Wing A 71.95 m, Block 3-Wing B 71.95 m, Block 4-Wing A 71.95 m, Block 4-Wing B 71.95 m, Block 5-Wing A 54.85 m, Block 5-Wing B 54.85 m, Block 6-Wing A 54.85 m, Block 6-Wing B 54.85 m, Block 7-Wing A 54.85 m, Block 7-Wing B 54.85 m, Block 8-Wing A 54.85 m, Block 8-Wing C 54.85 m, BLOCK 9 Wing A 54.85 m, Block 9-Wing B 54.85 m, Block 10-Wing A 54.85 m, Block 10-Wing B 54.85 m, Block 11-Wing A 64.3 m, Block 11-Wing B 64.3 m, Block 11-Wing C 64.3 m, Block 11-Wing E 64.3 m, Block 11-Wing F 64.3 m, Block 11-Wing G 64.3 m, Block 11-Wing H 64.3 m, Block 12-Wing A 64.3 m, Block 12-Wing B 64.3 m, Block 12-Wing C 64.3 m, Block 4-Wing C 19.95 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 98 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/529/2024 · issued 8 May 2025 | |
| Environmental clearance | SEIAA 138 CON 2024 · EC identification no. EC24B3813KA5892498N · issued 3 Mar 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 24 Feb 2026 | |
| Engineer's certificate, registration | Dated 24 Feb 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹922.76 Cr 30.5%Development · ₹2106.03 Cr 69.5%
| Estimated cost | ₹3028.79 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹1996.56 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹854.58 Cr | |
| Land cost revision | Not verified yet | |
Sold (425) 17.1%Unsold (2,066) 82.9%
| Sold, Q4 2025-26 | 355 / 2,463 · 2,108 available | |
|---|---|---|
| Sold, Q1 2026-27 | 344 / 2,411 · 2,067 available | |
| Sold, Q2 2026-27 | 425 / 2,491 · 2,066 available | |
| Unsold, Q2 2026-27 | 2,066 | |
| Sold in Q1 2026-27 | 11 bookings cancelled or corrected (355 → 344 sold) | |
| Sold in Q2 2026-27 | 81 |
| Escrow bank | ICICI Bank · M G Road | |
|---|---|---|
| Designated account, collected | ₹107.37 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹78.30 Cr in Q2 2026-27 (73% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 26 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 10 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 24 Feb 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · M G Road | |
Taken 1 Jul 2026Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Doddajala Gramapanchayathi) | |
| Nearest city water main | 5.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 840 m to the south-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 510 m, Doddajala | |
| Kempegowda Airport | 9.8 | 12 | 7.1 |
| MG Road (CBD) | 25.9 | 26 | 23.7 |
| Manyata Tech Park | 21.0 | 22 | 15.8 |
| ITPL, Whitefield | 36.6 | 40 | 24.4 |
| Ecospace, Bellandur ORR | 41.4 | 47 | 29.1 |
| Electronic City Ph 1 | 45.7 | 51 | 38.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.7 km to the north-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 580 m to the west |