Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Abhigna's Misty WoodsCompleted · OC 23-03-2023 | ABHIGNA CONSTRUCTIONS | Apartment | – | Completed |
| Adarsh CitrineCompleted (regulator flag) | M/s Adarsh Developers | Apartment | 1,292 sqft carpet (as filed) | Completed |
| Adarsh Lake Reserva Phase 1Active · 0% built | M/s Adarsh Developers | Apartment | 893–1,292 sqft carpet (as filed) | Dec 2027 |
| Adarsh StratussLapsed · completion date passed | Adarsh Developers | Apartment | 2,380–2,515 sqft | 2027 |
| Arya Hamsa GrandeCompleted (regulator flag) | ARYA GRUHA PRIVATE LIMITED | Apartment | 1,111 sqft carpet (as filed) | Completed |
| Bhoomika HeritageCompleted · OC 15-11-2023 | B M R PROJECTS | Apartment | 850–1,049 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 55 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Bhoomika MayflowerActive · 74% built | B M R BUILDERS AND DEVELOPERS | Apartment | 813–1,006 sqft carpet (as filed) | Dec 2030 |
| Brigade Gardenia | Brigade Group | Apartment | 810–1,655 sqft | – |
8 of 37 other projects in JP Nagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Serene Homes in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner Office Bengaluru · Survey 163/201/76, 202/77, 83/4/79
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Office Bengaluru · Survey 163/201/76, 202/77, 83/4/79
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Office Bengaluru · Survey 163/201/76, 202/77, 83/4/79
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Office Bengaluru · Survey 203/82/78
K-RERA filing, land schedule
Transfer of the land
Title deed executed
No. BGR-1-11170-2021-22 · Book 1 · Consideration ₹82.0 L · Sy 83/4; 84/2; 76, Kembathahalli village, Uttarahalli hobli, Bangalore South taluk · 4000 sq.ft.
Title deed filed with K-RERA, pp. 1, 8, 9, 15 · See it in Documents
Transfer of the land
Sale deed
Survey 163/201/76
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. JPN-1-03782-2022-23 · Book 1 · executed 15 Jul 2022 · Consideration ₹80.0 L
Title deed filed with K-RERA, pp. 1, 6, 9 · See it in Documents
Transfer of the land
Title deed registered
No. JPN-1-03782-2022-23 · Book 1 · executed 15 Jul 2022 · Consideration ₹80.0 L
Title deed filed with K-RERA, pp. 1, 6, 9 · See it in Documents
Transfer of the land
Title deed registered
No. JPN-1-03787-2022-23 · Book 1 · executed 15 Jul 2022 · Consideration ₹80.0 L
Title deed filed with K-RERA, pp. 1, 6, 7 · See it in Documents
Transfer of the land
Title deed registered
No. JPN-1-03787-2022-23 · Book 1 · executed 15 Jul 2022 · Consideration ₹80.0 L
Title deed filed with K-RERA, pp. 1, 6, 7 · See it in Documents
Transfer of the land
Sale deed
Survey 202/77, 203/82/78
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 202/77, 203/82/78
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. BMH-1-08665-2022-23 · Book 1
Title deed filed with K-RERA, p. 6 · See it in Documents
Transfer of the land
Sale deed
Survey 83/4/79
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 163/201/76, 202/77, 203/82/78, 83/4/79
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 163/201/76, 202/77, 203/82/78, 83/4/79
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 163/201/76, 202/77, 203/82/78, 83/4/79
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 163/201/76, 202/77, 203/82/78, 83/4/79
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./BMH/0877/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/050725/007892
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 26 May 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 163/201/76, 202/77, 203/82/78, 83/4/79 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,359 sq m | |
| Khata | E Khatha · BBMP · 17 Jun 2023 | |
| Sale deed | Dated 31 Mar 2022, 15 Jul 2022, 5 Dec 2022 | |
| Building plan (BBMP) | Sanctioned 24 Feb 2024 · No. BBMP/Ad.Com./BMH/0877/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Nov 2028 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 163/201/76, 202/77, 83/4/79 | Converted 31 Aug 2000 · Deputy Commissioner Office Bengaluru | |
| Sy 203/82/78 | Converted 31 Aug 2008 · Deputy Commissioner Office Bengaluru | |
| Survey numbers | 163/201/76 · 202/77 · 203/82/78 · 83/4/79 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 67 m² 50%3BHK · avg 88 m² 50%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 16 | 725 |
| 3BHK | 16 | 944 |
| Sold, Q2 2026-27 | 18 / 32 | |
|---|---|---|
| Unsold, Q2 2026-27 | 14 | |
| Months to sell, derived from filed bookings | 10 months |
| Platinum Landmark | about 0.5 km | Locked | |
|---|---|---|---|
| Sattva Forest Ridge | about 1.5 km | Locked | |
| Aqua Vista | about 2 km | Locked | |
| Iris Courtyard | about 2.5 km | Locked | |
| Mahindra Eden Phase-2 | about 3.5 km | Locked |
| Serene Homes This project | This project is the point the others are measured from | 30 Nov 2028 | 56% (18 of 32) | Not verified yet |
|---|---|---|---|---|
| Platinum Landmark | about 0.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Sattva Forest Ridge | about 1.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
| Aqua Vista |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, BDA LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Electricity, built | 60% | |
| Outdoor Sports facility, built | 50% | |
| Swimming Pool, built | 60% | |
| Parks, built | 50% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (32 covered spaces for 32 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 10 Aug 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 60% · planned by 15 May 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 90% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Nov 2028 | |
|---|---|---|
| Schedule end | 30 Nov 2028 | |
| RERA completion date | 30 Nov 2028 | |
| Completion date, agreement | 30 Nov 2028 | |
| Work began, as filed | 24 Feb 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 15 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.84 Cr 41.9%Development · ₹9.48 Cr 58.1%
| Estimated cost | ₹16.32 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (18) 56.3%Unsold (14) 43.8%
| Sold, Q3 2025-26 | 5 / 32 · 27 available | |
|---|---|---|
| Sold, Q4 2025-26 | 13 / 32 · 19 available | |
| Sold, Q1 2026-27 | 15 / 32 · 17 available | |
| Sold, Q2 2026-27 | 18 / 32 · 14 available | |
| Unsold, Q2 2026-27 | 14 | |
| Sold in Q4 2025-26 | 8 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 3 | |
| Flats booked, Form 4 Q1 2026-27 | 15 |
| Escrow bank | Industrial Development Bank of India · Jayanagar Bengaluru | |
|---|---|---|
| Designated account, collected | ₹2.64 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.92 Cr in Q2 2026-27 (73% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 26 May 2025 | |
| Building plan (BBMP) | Sanctioned 24 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · Jayanagar Bengaluru | |

| Srivara Vasudha | about 3.5 km | Locked |
|---|
| Lodha Azur | about 4 km | Locked |
|---|
| Azur Tower D | about 4 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 4.5 km | Locked |
|---|
| Garden Square | about 5.5 km | Locked |
|---|
| Azur Phase 2 | about 5.5 km | Locked |
|---|
| Song Of Wind | about 5.5 km | Locked |
|---|
| about 2 km |
| 31 Dec 2024 |
| 96% (173 of 181) |
| Locked |
| Iris Courtyard | about 2.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Mahindra Eden Phase-2 | about 3.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Srivara Vasudha | about 3.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Projects within 4 km, counted | 36 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 7,663 | |
| Booked | 4,337 of 7,663 (57%) | |
| Unsold | 3,326 | |
| Booked a month, pooled | 133 flats | |
| Months to sell, pooled | 25 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2.5 km, Kalena Agrahara | |
| Kempegowda Airport | 50 | 40.5 |
| MG Road (CBD) | 17 | 13.5 |
| Manyata Tech Park | 25.5 | 21.5 |
| ITPL, Whitefield | 32 | 22.5 |
| Ecospace, Bellandur ORR | 19.5 | 14 |
| Electronic City Ph 1 | 16.5 | 11.5 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the north-east | |
| Quarry | about 0.5 km, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Khodays Glass Factory Substation on OpenStreetMap |