| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 5 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
Part of the full report. Unlock all 3 sections
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 61 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Locked |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahindra Eden Phase-2 in the interactive atlas
Approval or registration
Land use converted
DC, Bangalore · Survey 49, 50/2
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. SHR-1-05583-2020-21 · Book 1 · executed 25 Feb 2021 · Consideration ₹70.19 Cr
Title deed filed with K-RERA, pp. 1, 10, 17 · See it in Documents
Transfer of the land
Sale deed
in favour of Mahindra Lifespace Developers Limited · Survey 49, 50/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 49, 50/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/CC/9799/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/060822/005141
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 6 Jul 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Aditya Birla Finance Limited · ₹17.58 Cr disbursed | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 49, 50/2 | |
|---|---|---|
| Land extent, Sy 49 | 27,893 sq m | |
| Land extent, Sy 50/2 | 3,430 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 28,942 sq m | |
| Khata | A Khatha · BBMP · 27 Jan 2022 | |
| Sale deed | Dated 25 Feb 2021 | |
| Sale deed in favour of | Mahindra Lifespace Developers Limited | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 9 Mar 2022 · No. BBMP/CC/9799/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/241/2019 · issued 17 Jul 2020 | Clear |
| Environmental clearance | SEIAA 78 CON 2019 · issued 5 Sep 2020 | Clear |
| Airport height NOC | NOC ID BANG/SOUTH/B/050619/393111 · issued 4 Jun 2019 · valid until 3 Jun 2027 | Clear |
| Pollution board (CFE) | consent order W-350636 · issued 19 Sep 2025 · valid until 30 Jun 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jul 2027 |
| Land conversion | Converted 29 Nov 2012 · DC, Bangalore | |
|---|---|---|
| Survey numbers | 49 · 50/2 |
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Raghuvanahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Gym · Nebula Lounge · Swinging Cocoons · Contemplation Zone · Sand Pit · Reflexology Path · Al fresco Gym · Pet Park · Multipurpose Hall · Indoor Gym with Aerobics zone | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 30% | |
| Nebula Lounge, built | 0% | |
| Swinging Cocoons, built | 100% | |
| Contemplation Zone, built | 60% | |
| Sand Pit, built | 50% | |
| Reflexology Path, built | 60% | |
| Al fresco Gym, built | 50% | |
| Pet Park, built | 0% | |
| Multipurpose Hall, built | 60% | |
| Indoor Gym with Aerobics zone, built | 50% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.03 (257 covered spaces for 250 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 30 Apr 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 75% · planned by 30 Jun 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | 100% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Jul 2027 | |
| RERA completion date | 30 Jul 2027 | |
| Work began, as filed | 1 Aug 2022 | |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Wing-C 82 m, Wing-D 88 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Power backup in flats: 0.75 kW | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/241/2019 · issued 17 Jul 2020 | |
| Environmental clearance | SEIAA 78 CON 2019 · issued 5 Sep 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 1 Jul 2022 · site inspected 20 Jun 2022 | |
| Engineer's certificate, registration | Dated 29 Jun 2022 | |
Land · ₹69.80 Cr 29.3%Development · ₹168.09 Cr 70.7%
| Estimated cost | ₹237.89 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹155.90 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹222.42 Cr | |
| Cost incurred | ₹222.42 Cr (100% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹23.77 Cr | |
| Land cost revision | Not verified yet | |
Sold (250) 100%
| Sold, Q3 2025-26 | 250 / 250 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 250 / 250 · 0 available | |
| Sold, Q1 2026-27 | 250 / 250 · 0 available | |
| Unsold, Q1 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 |
| Escrow bank | Axis Bank · Kanakapura Road, Raghuvanahalli, Bangalore – 560062 | |
|---|---|---|
| Designated account, collected | ₹10.64 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹41.33 Cr in Q1 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 4 |
| Developer's project loan | Aditya Birla Finance Limited · ₹17.58 Cr disbursed | |
|---|---|---|
| Records searched to | 6 Jul 2022 | Review |
| Building plan (BBMP) | Sanctioned 9 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Kanakapura Road, Raghuvanahalli, Bangalore – 560062 | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Talaghattapura | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 49.5 | 40.5 |
| MG Road (CBD) | 16.5 | 13.5 |
| Manyata Tech Park | 25 | 21.5 |
| ITPL, Whitefield | 33.5 | 24.5 |
| Ecospace, Bellandur ORR | 21.5 | 16 |
| Electronic City Ph 1 | 22.5 | 15 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2.5 km to the south-east, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |