₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Serene Gardens is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Not verified yet
Fire NOC
Not verified yet
Environmental clearance
Not verified yet
Airport height NOC
Not verified yet
Pollution board (CFE)
Filed with the registration
Water and sewerage NOC (BWSSB)
issued 12 Jul 2022
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
14 Apr 2022
Registration certificates
PRM/KA/RERA/1251/446/PR/181122/002161
Land use
Conversion order
Not verified yet
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
about 0.5 km from the locality centre, secondary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, an unnamed water body
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
about 0.5 km from the locality centre, secondary drain
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
about 1 km from the locality centre
Quarry
about 0.5 km from the locality centre
Crematorium
about 1.5 km from the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 0.5 km from the locality centre
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 13 Jul 2020
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
15 Mar 2021
RERA completion date
14 Apr 2022
Work began, as filed
14 Jul 2018
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.