| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 2 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 63 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Every finding in the report counts: clear 1, to review ½, red flag 0. Any red flag caps the DOSL Score at 59. A project needs 4 findings to be scored. The same rule for every project, with every section counted, so the DOSL Score is the same for every reader.
| Location & risks | – | – | 2 | Clear |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Garuda Grand in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BBMP) | Sanctioned 31 Oct 2022 · No. BBMP/Ad.Com./MDP/0527/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | EC identification no. EC23B038KA140450 · issued 1 Jun 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 22 May 2023 | |
| Clearances pending | 1, in the latest update | Review |
| RERA extensions | Granted · Approved 26 Mar 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2028 |
| Land conversion | Converted 17 Aug 2016 · Deputy Commissioner, Bangalore District | |
|---|---|---|
| Survey numbers | sy no 99/3,100 and 103/1 |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 100 m from the filed location | Clear |
| Nearest government-flagged flood location | 980 m, Hoodi | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 30 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the south-east, Sadaramangala Lake | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 50% | |
| Electricity, built | 25% | |
| Swimming Pool, built | 0% | |
| Parks, built | 50% | |
| Water and Sanitation, built | 60% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.18 (160 covered spaces for 136 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 17 Jul 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 60% · planned by 31 Dec 2024 | |
| Internal roads | Not verified yet | |
| Club house | 50% | |
| Completion | 87% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Mar 2025 | |
| RERA completion date | 31 Mar 2028 | Review |
| Work began, as filed | 25 Apr 2023 | |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | External walls: 6"; Internal walls: 4" | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.5 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Glazed tiles (walls) | |
| Wiring | Concealed copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 2 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | EC identification no. EC23B038KA140450 · issued 1 Jun 2023 | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 8 Aug 2023 · site inspected 8 Aug 2023 | |
| Engineer's certificate, registration | Dated 8 Mar 2023 | |
| Chartered accountant's certificate, registration | Dated 17 Feb 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹30.13 Cr 38.6%Development · ₹48.02 Cr 61.4%
| Estimated cost | ₹78.15 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹78.15 Cr, same as the filing | |
| Cost incurred | ₹66.90 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | ₹34.57 Cr | |
| Receivable, sold flats | ₹6.41 Cr | |
| Land cost revision | Not verified yet | |
Sold (56) 41.2%Unsold (80) 58.8%
| Sold, Q3 2025-26 | 52 / 136 · 84 available | |
|---|---|---|
| Sold, Q4 2025-26 | 52 / 136 · 84 available | |
| Sold, Q1 2026-27 | 52 / 136 · 84 available | |
| Sold, Q2 2026-27 | 56 / 136 · 80 available | |
| Unsold, Q2 2026-27 | 80 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 4 |
| Escrow bank | Axis Bank · KR PURAM | |
|---|---|---|
| Designated account, collected | ₹1.20 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹35,10,07,535 | |
| Net amount withdrawable, Form 4 | ₹16,18,57,405 | |
| Withdrawn from the escrow account to date | ₹20,58,46,417 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 31 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · KR PURAM | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 690 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 30 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.7 km, Hoodi Junction | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35.9 | 36 | 22.2 |
| MG Road (CBD) | 16.5 | 18 | 13.5 |
| Manyata Tech Park | 16.0 | 21 | 12.3 |
| ITPL, Whitefield | 5.4 | 7 | 2.1 |
| Ecospace, Bellandur ORR | 11.7 | 19 | 9.5 |
| Electronic City Ph 1 | 26.1 | 36 | 18.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the north-west, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 530 m to the south-east, named Hoody Traction on OpenStreetMap |