| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| AlohaLapsed · completion date passed | Cubatic Shimul Ventures Private Limited | Apartment | 7,251 sqft carpet (as filed) | Mar 2019 |
| Brigade Parkside NorthFiled as completed · no completion certificate on record | Brigade Enterprises Ltd | Apartment | – | Sep 2022 |
| Cardinal OneCompleted · OC 22-03-2024 | Cardinal Energy And Infrastructure Private Limited | Apartment | 1,961 sqft carpet (as filed) | Completed |
| Chinmayi HomesLapsed · completion date passed | Vijaykumar Raju | Apartment | – | Dec 2019 |
| Concorde Spring MeadowsCompleted · OC 20-12-2022 | Concorde Housing Corporation Pvt Ltd | Apartment | 807 sqft carpet (as filed) | Completed |
| Ds Max SmartnestFiled as completed · no completion certificate on record |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 54 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| DS Max Properties Private Limited |
| Apartment |
| – |
| Aug 2019 |
| Ds Max Sonata NestCompleted · OC 20-07-2021 | DS Max Properties Private Limited | Apartment | 644 sqft carpet (as filed) | Completed |
| Renaissance ReservaCompleted · OC 06-04-2024 | Renaissance Holdings and Developers Private Limited | Apartment | – | Completed |
8 of 17 other projects in Jalahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Durga Samrudhi in the interactive atlas
Approval or registration
Land use converted
Special Deputy Commissioner Bangalore · Survey 23/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 23/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./YLK/0007/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/100423/005858
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | State Bank Of India · ₹7.85 Cr disbursed | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 23/3 | |
|---|---|---|
| Land extent, Sy 23/3 | 1 Acre 3 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,100 sq m | |
| Khata | A Khatha · BBMP · 3 Jun 2020 | |
| Title deed | Sy 23/3, Jarakabandekaval village, Yelahanka hobli | |
| Joint development agreement number | 6272 of Book 1, 2021-22 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BBMP) | Sanctioned 3 Jun 2022 · No. BBMP/Ad.Com./YLK/0007/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 22 Apr 1989 · Special Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | 23/3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3 hk flats · avg 104 m² 65.8%2 hk flats · avg 83 m² 34.2%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 hk flats | 27 | 889 |
| 3 hk flats | 52 | 1,115 |
| Sold, Q2 2026-27 | 37 / 99 | |
|---|---|---|
| Unsold, Q2 2026-27 | 62 | |
| Months to sell, derived from filed bookings | 31 months |
| Sri Rama Enclave | about 2.5 km | Locked | |
|---|---|---|---|
| Rubby Castle 1 | about 3 km | Locked | |
| Royal Enclave | about 3.5 km | Locked | |
| Vruksha Greens | about 4 km | Locked | |
| Shriram Solitaire | about 5.5 km | Locked |
| Durga Samrudhi This project | This project is the point the others are measured from | 31 Dec 2026 | 37% (37 of 99) | Not verified yet |
|---|---|---|---|---|
| Sri Rama Enclave | about 2.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Rubby Castle 1 | about 3 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Royal Enclave | about 3.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, Kammagondanahalli near MNTI Polytechnic | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1.5 km, Narasipura | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Gas, built | 0% | |
| Air Conditioning And incerntion, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (87 covered spaces for 79 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Groundwater | Not verified yet | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | Not verified yet | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 3 km, Peenya | |
| Metro, under construction | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 30 Jan 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 65% · planned by 30 Nov 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 98% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 20 Feb 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant's certificate, registration | Dated 23 Feb 2023 | |
| Chartered accountant, Form 4 | Dated 10 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹36.63 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (37) 37.4%Unsold (62) 62.6%
| Sold, Q3 2025-26 | 19 / 99 · 80 available | |
|---|---|---|
| Sold, Q4 2025-26 | 26 / 99 · 73 available | |
| Sold, Q1 2026-27 | 33 / 99 · 66 available | |
| Sold, Q2 2026-27 | 37 / 99 · 62 available | |
| Unsold, Q2 2026-27 | 62 | |
| Sold in Q4 2025-26 | 7 | |
| Sold in Q1 2026-27 | 7 | |
| Sold in Q2 2026-27 | 4 | |
| Flats booked, Form 4 Q4 2025-26 | 17 |
| Escrow bank | STATE BANK OF INDIA · JALAHALLI | |
|---|---|---|
| Designated account, collected | ₹6.38 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.35 Cr in Q2 2026-27 (68% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | State Bank Of India · ₹7.85 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 3 Jun 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · JALAHALLI | |

| Renaissance Srichakra | about 6 km | Locked |
|---|
| Assetz Soho & Sky | about 6 km | Locked |
|---|
| Century Kindle Phase 1 | about 6 km | Locked |
|---|
| Cumins Sanctum | about 6.5 km | Locked |
|---|
| Vista Padmalaya | about 7 km | Locked |
|---|
| Magnolia Delight | about 7 km | Locked |
|---|
| 4square Park Sierra | about 7.5 km | Locked |
|---|
| 31 Mar 2027 |
| 73% (44 of 60) |
| Locked |
| Vruksha Greens | about 4 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
|---|
| Shriram Solitaire | about 5.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
|---|
| Renaissance Srichakra | about 6 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
|---|
| Projects within 4 km, counted | 9 (9 with an approximate location) | |
|---|---|---|
| Flats in them | 1,535 | |
| Booked | 1,253 of 1,535 (82%) | |
| Unsold | 282 | |
| Booked a month, pooled | 11 flats | |
| Months to sell, pooled | 26 months |
| Kempegowda Airport | 30 | 23.5 |
| MG Road (CBD) | 12.5 | 10.5 |
| Manyata Tech Park | 9.5 | 8 |
| ITPL, Whitefield | 26.5 | 22 |
| Ecospace, Bellandur ORR | 28 | 20.5 |
| Electronic City Ph 1 | 32 | 28 |
| Landfill or waste transfer station | about 2.5 km to the south-east | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named HMT on OpenStreetMap |