Assetz Soho & Sky
Part ofAssetz Soho & Sky2 phases, 354 flats
Overview
Part ofAssetz Soho & Sky2 phases, 354 flats
Overview
Part ofAssetz Soho & Sky2 phases, 354 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 72 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 2 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
| Ds Max SasmaraCompleted · OC 29-11-2023 | DS Max Properties Private Limited | Apartment | 645–797 sqft carpet (as filed) | Completed |
8 of 46 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Soho & Sky in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 11 Feb 2022 · No. BBMP/CC/8451/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/273/2019 · issued 15 Dec 2020 · building height 44.9 m | Clear |
| Environmental clearance | SEIAA 48 CON 2018 · issued 16 May 2018 | Clear |
| Airport height NOC | NOC ID JAKK/SOUTH/B/100717/250765 · issued 20 Oct 2017 · permissible top elevation 963.7 m above mean sea level · validity ended 19 Oct 2025 | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 12 Nov 2021 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2026 |
| Land conversion | 10 of 10 parcels converted | |
|---|---|---|
| Sy 14-1, 15/5, 16/2 | Converted 19 Aug 2002 · Special Deputy Commissioner | |
| Sy 14/2, 15/1, 15/2, 15/3, 15/4, 61/… | Converted 17 Aug 2002 · Special Deputy Commissioner | |
| Survey numbers | 14-1 · 14/2 · 15/1 · 15/2 · 15/3 · 15/4 · 15/5 · 16/2 · 61/1 · 61/3 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 1000 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.8 km, Near Rachanahalli lake inlet | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 200 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 460 m to the south, Amruthhalli | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 60% | |
| Electricity, built | 30% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 15% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 20% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 3.10 (353 covered spaces for 114 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 100% · planned by 31 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 50% · planned by 31 Jul 2026 | |
| Internal roads | Not verified yet | |
| Club house | 60% | |
| Completion | 95% | |
| Completion, accountant | 93.2% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Sep 2026 | |
| RERA completion date | 30 Sep 2026 | Review |
| Work began, as filed | 1 Apr 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.9 m on the fire NOC · filed: WING A 7.7 m, WING B 7.7 m, WING C 7.7 m, WING D 44.9 m, WING E 44.9 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/273/2019 · issued 15 Dec 2020 · building height 44.9 m | |
| Environmental clearance | SEIAA 48 CON 2018 · issued 16 May 2018 | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹30.47 Cr 19.9%Development · ₹122.84 Cr 80.1%
| Estimated cost | ₹153.31 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q1 2026-27 | ₹192.94 Cr | |
| Cost incurred | ₹179.87 Cr (93.2% of the estimate) | |
| Cost left | ₹13.07 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (114) 100%
| Sold, Q3 2025-26 | 110 / 114 · 4 available | |
|---|---|---|
| Sold, Q4 2025-26 | 111 / 114 · 3 available | |
| Sold, Q1 2026-27 | 114 / 114 · 0 available | |
| Sold, Q2 2026-27 | 114 / 114 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 1 | |
| Sold in Q1 2026-27 | 3 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · Richmond Road | |
|---|---|---|
| Designated account, collected | ₹8.45 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.72 Cr in Q2 2026-27 (68% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹32,46,44,901 | |
| Withdrawn from the escrow account to date | ₹1,47,40,43,145 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 25 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 3 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 11 Feb 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Richmond Road | |

Map of storm drains, lakes and government-flagged flood locations within about 1000 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 610 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 200 m to the east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 960 m, Jakkur Cross | |
| Kempegowda Airport | 24.9 | 27 | 18.5 |
| MG Road (CBD) | 13.2 | 17 | 10.2 |
| Manyata Tech Park | 5.4 | 9 | 3.2 |
| ITPL, Whitefield | 22.4 | 29 | 17.3 |
| Ecospace, Bellandur ORR | 28.8 | 38 | 18.0 |
| Electronic City Ph 1 | 33.1 | 42 | 26.7 |
| Landfill or waste transfer station | 670 m to the north-west | |
|---|---|---|
| Sewage treatment plant | 1.0 km to the east, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | 2.6 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 710 m to the east |