| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 58 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 2 filed survey numbers matched, 1 found no plot.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 682–853 sqft carpet (as filed) |
| Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Casagrand Promenade in the interactive atlas
Approval or registration
Land use converted
DC Office · Survey 1, 56
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office · Survey 1, 56
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 1, 56
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 1, 56
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 56
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · na · Survey 1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0068/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/070525/007719
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 18 Apr 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 2 filed survey numbers matched, 1 found no plot.
| Survey numbers | 1, 56 | |
|---|---|---|
| Land extent, Sy 1 | 1 Acre | |
| Land extent, Sy 56 | 3 acres 02 guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 15,712 sq m | |
| Khata | E Khatha · na · 19 Mar 2025; E Khatha · BBMP · 19 Mar 2025 | |
| Sale deed | Dated 30 Jun 2021 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 56 | 3 | 7 acres 11 guntas | 3 acres 2 guntas | Differs: 4 acres 12 guntas apart | Not read yet |
| Building plan (BBMP) | Sanctioned 5 May 2025 · No. BBMP/Addl.Dir/JDNORTH/0068/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/003/2025 · issued 20 Jan 2025 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 8 Jan 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 5 Aug 2029 |
| Land conversion | Converted 2 Aug 2018 · DC Office | |
|---|---|---|
| Survey numbers | 1 · 56 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3bhk · avg 116 m² 81.2%2bhk · avg 81 m² 10.8%4bhk · avg 162 m² 7.2%1bhk 0.9%
| 1bhk | 2 | 1,270 |
| 2bhk | 24 | 20,871 |
| 3bhk | 181 | 2,25,246 |
| 4bhk | 16 | 27,911 |
| Sold, Q2 2026-27 | 147 / 223 | |
|---|---|---|
| Unsold, Q2 2026-27 | 76 | |
| Months to sell, derived from filed bookings | 17 months |
| Shriram Solitaire | about 1.5 km | Locked | |
|---|---|---|---|
| Rubby Castle 1 | about 1.5 km | Locked | |
| Century Kindle Phase 1 | 2.2 km | Locked | |
| Sri Rama Enclave | about 3 km | Locked |
| Casagrand Promenade This project | This project is the point the others are measured from | 5 Aug 2029 | 66% (147 of 223) | Not verified yet |
|---|---|---|---|---|
| Shriram Solitaire | about 1.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 | about 1.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Century Kindle Phase 1 |
Map of the ground within about 1.1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 2.1 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 80 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 40 m to the north, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.02 (227 covered spaces for 223 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 15 Apr 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 25 Feb 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 10% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 5 Aug 2029 | |
| RERA completion date | 5 Aug 2029 | |
| Work began, as filed | 3 Aug 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 26.8 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 46 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/003/2025 · issued 20 Jan 2025 | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 5 May 2025 | |
| Engineer's certificate, registration | Dated 5 May 2025 | |
| Chartered accountant's certificate, registration | Dated 5 May 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹24.56 Cr 13.4%Development · ₹158.30 Cr 86.6%
| Estimated cost | ₹182.87 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹151.85 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (147) 65.9%Unsold (76) 34.1%
| Sold, Q3 2025-26 | 107 / 223 · 116 available | |
|---|---|---|
| Sold, Q4 2025-26 | 135 / 223 · 88 available | |
| Sold, Q1 2026-27 | 151 / 223 · 72 available | |
| Sold, Q2 2026-27 | 147 / 223 · 76 available | |
| Unsold, Q2 2026-27 | 76 | |
| Sold in Q4 2025-26 | 28 | |
| Sold in Q1 2026-27 | 16 | |
| Sold in Q2 2026-27 | 4 bookings cancelled or corrected (151 → 147 sold) |
| Escrow bank | STATE BANK OF INDIA · Shrungar M.G. Road | |
|---|---|---|
| Designated account, collected | ₹95.19 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹8,56,47,627 | |
| Net amount withdrawable, Form 4 | ₹17,27,69,044 | |
| Withdrawn from the escrow account to date | ₹31,03,07,268 | |
| Sale proceeds realised, Q1 2026-27 | ₹14,18,09,319 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 20 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 8 | |
| Complaints filed against the promoter | 167 | |
| Other phases under this promoter name | 18 | |
| With a filed extension or completion | 3 (2 completed, 1 extended) | |
| Average schedule slip | 9 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 18 Apr 2025 | |
| Building plan (BBMP) | Sanctioned 5 May 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Shrungar M.G. Road | |

Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Century Kindle Phase 1, price locked.
| 4square Park Sierra | 5.0 km | Locked |
|---|
| Legacy Salvador | about 5 km | Locked |
|---|
| Assetz Soho & Sky | 5.5 km | Locked |
|---|
| Vruksha Greens | 5.8 km | Locked |
|---|
| Godrej Aveline | 6.0 km | Locked |
|---|
| Cumins Sanctum | about 6 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | 6.8 km | Locked |
|---|
| Assetz Miru & Miyo | about 7 km | Locked |
|---|
| 2.2 km |
| 14 Mar 2031 |
| 73% (336 of 458) |
| Locked |
| Sri Rama Enclave | about 3 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| 4square Park Sierra | 5.0 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Legacy Salvador | about 5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹35,500 /mo · 8 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹23,000 /mo · 19 listings | |
| Rent, 1BHK, 3 km | ₹6,000 /mo · 9 listings | |
| Rent per sq ft, 3 km | ₹19.6 /mo, as listed · 20 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 27 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 4,252 | |
| Booked | 2,410 of 4,252 (57%) | |
| Unsold | 1,842 | |
| Booked a month, pooled | 72 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 1.1 km of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 60 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 80 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.6 km, Jakkur Cross | |
| Kempegowda Airport | 25.6 | 28 | 20.1 |
| MG Road (CBD) | 17.8 | 22 | 13.8 |
| Manyata Tech Park | 14.9 | 19 | 8.6 |
| ITPL, Whitefield | 31.9 | 39 | 22.8 |
| Ecospace, Bellandur ORR | 33.2 | 42 | 22.9 |
| Electronic City Ph 1 | 37.5 | 46 | 31.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.1 km to the south, named Vidyaranyapura Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | 2.7 km to the north-west, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the north-west, named Doddabettahalli 66kV Substation on OpenStreetMap |