A standalone building with G + 3 floors and 11 houses, next to Balaji water supply. It is surrounded by Music academy on one side and Brigade Millenium (Magnolia) at the back. One has to come inthe Kothnur to South city road and take first…
Overview
Overview
Overview
Photo: Brigade Millennium AnnexeA standalone building with G + 3 floors and 11 houses, next to Balaji water supply. It is surrounded by Music academy on one side and Brigade Millenium (Magnolia) at the back. One has to come inthe Kothnur to South city road and take first…
A small and stand alone G plus 3 apartment behind Indian Music Experience by the Brigade group. Good to see such projects from a large real estate group.
Brigade Millennium is a great apartment complex with the convenience of everything you need within walking distance- shops, restaurants, and essentials are all nearby. However, the exterior areas, especially the rarely used gates could use…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Abhigna's Misty WoodsCompleted · OC 23-03-2023 | ABHIGNA CONSTRUCTIONS | Apartment | – | Completed |
| Adarsh CitrineCompleted (regulator flag) | M/s Adarsh Developers | Apartment | 1,292 sqft carpet (as filed) | Completed |
| Adarsh Lake Reserva Phase 1Active · 0% built | M/s Adarsh Developers | Apartment | 893–1,292 sqft carpet (as filed) | Dec 2027 |
| Adarsh StratussLapsed · completion date passed | Adarsh Developers | Apartment | 2,380–2,515 sqft | 2027 |
| Arya Hamsa GrandeCompleted (regulator flag) | ARYA GRUHA PRIVATE LIMITED | Apartment | 1,111 sqft carpet (as filed) | Completed |
| Bhoomika HeritageCompleted · OC 15-11-2023 | B M R PROJECTS | Apartment | 850–1,049 sqft carpet (as filed) | Completed |
| Bhoomika MayflowerActive · 74% built | B M R BUILDERS AND DEVELOPERS | Apartment | 813–1,006 sqft carpet (as filed) | Dec 2030 |
| Brigade Gardenia | Brigade Group | Apartment | 810–1,655 sqft | – |
8 of 37 other projects in JP Nagar, A to Z. Status is taken from each project's own filing.
All 40 projects in JP Nagar → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Millennium in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Iris Courtyard | about 2 km | Locked | |
|---|---|---|---|
| Lodha Azur | 2.6 km | Locked | |
| Pacific Legacy | 2.8 km | Locked | |
| Aqua Vista | about 3 km | Locked |
| Brigade Millennium This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Iris Courtyard | about 2 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Lodha Azur | 2.6 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
| Pacific Legacy |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.1 km, PUTTENHALLI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 200 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 220 m to the east, Tuttenahalli Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | 170 m | |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 |
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Azur, price locked; Pacific Legacy, price locked; Azur Tower D, price locked.
| Azur Tower D | 3.4 km | Locked |
|---|
| Platinum Landmark | about 4 km | Locked |
|---|
| Song Of Wind | about 4 km | Locked |
|---|
| Adarsh Premia | 4.0 km | Locked |
|---|
| Sattva Forest Ridge | 4.2 km | Locked |
|---|
| Srivara Vasudha | about 4.5 km | Locked |
|---|
| Garden Square | 4.6 km | Locked |
|---|
| Azur Phase 2 | about 5 km | Locked |
|---|
| 2.8 km |
| 31 Dec 2025 |
| 20% (8 of 40) |
| Locked |
| Aqua Vista | about 3 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
|---|
| Azur Tower D | 3.4 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Platinum Landmark | about 4 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 65 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,400 /mo · 141 listings | |
| Rent, 1BHK, 3 km | ₹13,000 /mo · 67 listings | |
| Rent per sq ft, 3 km | ₹28.2 /mo, as listed · 130 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 30 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 4,923 | |
| Booked | 2,792 of 4,923 (57%) | |
| Unsold | 2,131 | |
| Booked a month, pooled | 101 flats | |
| Months to sell, pooled | 21 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 200 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.6 km, Yelachenahalli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 45.6 | 49 | 36.7 |
| MG Road (CBD) | 12.5 | 16 | 9.6 |
| Manyata Tech Park | 21.0 | 27 | 17.5 |
| ITPL, Whitefield | 28.1 | 34 | 19.6 |
| Ecospace, Bellandur ORR | 15.6 | 21 | 11.1 |
| Electronic City Ph 1 | 19.7 | 20 | 11.7 |
| Landfill or waste transfer station | 2.2 km to the east | |
|---|---|---|
| Sewage treatment plant | 1.0 km to the north-west, named Sarakki 5MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 430 m to the south-west |