Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone Illumina |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 14 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| SRIVARI DWELLINGS |
| Apartment |
| 793–1,071 sqft carpet (as filed) |
| Dec 2028 |
| Amidst NatureExtended to 20-07-2027 | CLIMATE CONNECTIONS | Plot | ~1,500–2,800 sqft (estimate: filed carpet plus 25%) | Jul 2025 |
8 of 151 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sri Sri Tapovan 2, Block 1 in the interactive atlas
Approval or registration
Land use converted
Bangalore DC · Survey 18/1; DC Benglauru · Survey 22/1
K-RERA filing, land schedule
Covers 22/1 only
Approval or registration
Land use converted
Bangalore DC · Survey 18/1; DC Benglauru · Survey 22/1
K-RERA filing, land schedule
Covers 22/3, 22/4, 22/5 only
Approval or registration
Land use converted
DC Bengaluru · Survey 22/3, 22/4, 22/5
K-RERA filing, land schedule
Covers 22/2 only
Approval or registration
Land use converted
DC Bengaluru · Survey 22/2
K-RERA filing, land schedule
Covers 22/3, 22/4, 22/5 only
Transfer of the land
Sale deed
in favour of Max Concorde Developers · Survey 22/3, 22/4, 22/5
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 18/1, 22/1
K-RERA filing, land schedule
Covers 22/1 only
Transfer of the land
Sale deed
Survey 18/1, 22/1
K-RERA filing, land schedule
Covers 22/2 only
Transfer of the land
Sale deed
in favour of Maxconcorde Developers · Survey 22/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan KPA/LAO/11/2017-18
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Panchayth Raj · Survey 18/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · 0 · Survey 22/1, 22/2, 22/3, 22/4 and 1 more
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/170524/006881
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 34,215 sq m | |
| Extent the filed land schedule names for these survey numbers | 27,316 sq m | |
| Plot area against the filed extent | 1.25 times | |
| Village, hobli and taluk on the KGIS map | Uttari, Uttarahalli-2 hobli, Bangalore-South taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 18/1, 22/1, 22/2, 22/3, 22/4, 22/5 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Panchayth Raj · 30 Oct 2023; E Khatha · 0 · 10 Apr 2024 | |
| Sale deed | Dated 9 Dec 2014, 10 Feb 2015, 29 Apr 2015 | |
| Sale deed in favour of | Maxconcorde Developers, Max Concorde Developers | |
| Sy. No. 18/1 | 4 | 1 acre 37 guntas | 1 acre 37 guntas | Differs: 10 guntas apart | 0 | ||
| Sy. No. 22/1 | 2 | 16 guntas | 0 | ||||
| Sy. No. 22/2 | 1 | 1 acre 34 guntas |
| Building plan (BMRDA) | Sanctioned 14 Mar 2023 · No. KPA/LAO/11/2017-18 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 14 Mar 2023 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 18/1 | Converted 14 Sep 2010 · Bangalore DC | |
| Sy 22/1 | Converted 14 Sep 2010 · DC Benglauru | |
| Sy 22/2 | Converted 11 Jun 2012 · DC Bengaluru | |
| Sy 22/3, 22/4, 22/5 | Converted 29 Nov 2011 · DC Bengaluru | |
| Survey numbers | 18/1 · 22/1 · 22/2 · 22/3 · 22/4 · 22/5 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Harivishram | about 1 km | Locked | |
|---|---|---|---|
| Sattva Springs | about 2 km | Locked | |
| Axis Amarissa | about 2 km | Locked | |
| Jhanavi Trishul Alaska | 6.0 km | Locked | |
| Mahindra Eden Phase-2 | about 7.5 km | Locked |
| Sri Sri Tapovan 2, Block 1 This project | This project is the point the others are measured from | 14 Mar 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Harivishram | about 1 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
| Sattva Springs | about 2 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
| Axis Amarissa |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 53% Commercial (business), 40% Residential (main), 7% Transport & communication | |
|---|---|---|
| Nearest high-tension line | A 400 kV line's corridor covers about 21% of the site (about 7,060 m²) | Review |
| Nearest government-flagged flood location | 6.5 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.0 km to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the south-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 14 Mar 2023 | |
| Work began, as filed | 18 Dec 2018 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹10.02 Cr 55.6%Development · ₹8.01 Cr 44.4%
| Estimated cost | ₹18.02 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Canara Bank · JAYANAGAR 3RD BLOCK | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 14 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · JAYANAGAR 3RD BLOCK | |
| 0 |
| Sy. No. 22/3 | 1 | 9 guntas | 0 |
| Sy. No. 22/4 | 1 | 10 guntas | 0 |
| Sy. No. 22/5 | 1 | 2 acres 18 guntas | 0 |
| Good Earth Cadence | 7.7 km | Locked |
|---|
| Srivara Vasudha | about 8 km | Locked |
|---|
| Good Earth Ochre | 8.1 km | Locked |
|---|
| Sattva Forest Ridge | 8.1 km | Locked |
|---|
| Platinum Landmark | about 9 km | Locked |
|---|
| Samaya Sunshine | about 9.5 km | Locked |
|---|
| Garden Square | 10.1 km | Locked |
|---|
| about 2 km |
| 31 Dec 2029 |
| 28% (23 of 81) |
| Locked |
| Jhanavi Trishul Alaska | 6.0 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Mahindra Eden Phase-2 | about 7.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Good Earth Cadence | 7.7 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
|---|
| Projects within 4 km, counted | 8 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 1,515 | |
| Booked | 609 of 1,515 (40%) | |
| Unsold | 906 | |
| Booked a month, pooled | 16 flats | |
| Months to sell, pooled | 58 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 6.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.0 km to the east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 5.8 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 59.1 | 63 | 47.8 |
| MG Road (CBD) | 26.0 | 29 | 20.6 |
| Manyata Tech Park | 34.5 | 40 | 28.3 |
| ITPL, Whitefield | 43.2 | 48 | 31.8 |
| Ecospace, Bellandur ORR | 30.9 | 37 | 23.1 |
| Electronic City Ph 1 | 27.8 | 28 | 19.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.6 km to the south-east |