A beautiful upcoming row house villa project on Kanakapura road, which has a very good connectivity in the proximity of 4Kms with broad roads. Sattva Springs offer luxe amenities for residents within an enclosed setting and Perimeter walls…
Overview
Overview
Overview
Photo: Susovan PayraA beautiful upcoming row house villa project on Kanakapura road, which has a very good connectivity in the proximity of 4Kms with broad roads. Sattva Springs offer luxe amenities for residents within an enclosed setting and Perimeter walls…
Good floor plan with very limited number of houses, more open greenary spaces - well designed.
Beautiful designed project with good spacious floor plans. Best villa project in the Kanakapura Road.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 5 sections
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone Elanza |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
178 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| SRIVARI VENTURES |
| Apartment |
| 804–1,161 sqft carpet (as filed) |
| Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 157 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sattva Springs in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 14 Jun 2024 · No. 76/2023-24/479 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 185 CON 2023 · EC identification no. EC23B038KA159589 · issued 29 Nov 2023 | Clear |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-340788 · issued 23 Nov 2023 · valid until 22 Nov 2028 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 18 Sep 2027 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 179, 182/1 | Converted 29 Dec 2012 · District Commissioner, Bangalore District | |
| Sy 182/2, 182/2 | Converted 7 Feb 2004 · District Commissioner, Bangalore District | |
| Survey numbers | 179 · 182/1 · 182/2 · 182/2 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 10% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.92 (193 covered spaces for 66 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported it

| Main structure | 50% · planned by 6 Aug 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 24 Nov 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 42% | |
| Completion, accountant | 27.3% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Aug 2027 | |
| RERA completion date | 18 Sep 2027 | |
| Completion date, agreement | 18 Sep 2027 | |
| Work began, as filed | 1 Apr 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Block 2 12.65 m, Block 3 12.68 m, Block 4 12.65 m, Block 5 12.65 m, Block 6 12.65 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 185 CON 2023 · EC identification no. EC23B038KA159589 · issued 29 Nov 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Engineer's certificate, registration | Dated 14 Jun 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹95.44 Cr 39.8%Development · ₹144.21 Cr 60.2%
| Estimated cost | ₹239.65 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹127.69 Cr | |
| Cost incurred | ₹65.32 Cr (27.3% of the estimate) | |
| Cost left | ₹174.33 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹66.43 Cr | |
| Land cost revision | Not verified yet | |
Sold (25) 37.9%Unsold (41) 62.1%
| Sold, Q3 2025-26 | 23 / 66 · 43 available | |
|---|---|---|
| Sold, Q4 2025-26 | 25 / 66 · 41 available | |
| Sold, Q1 2026-27 | 26 / 66 · 40 available | |
| Sold, Q2 2026-27 | 25 / 66 · 41 available | |
| Unsold, Q2 2026-27 | 41 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 1 | |
| Sold in Q2 2026-27 | 1 booking cancelled or corrected (26 → 25 sold) | |
| 4 BHK, sold | 25 / 66 |
| Escrow bank | FEDERAL BANK OF INDIA · St. Marks Road Branch, Bangalore | |
|---|---|---|
| Designated account, collected | ₹6.90 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.12 Cr in Q2 2026-27 (74% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 1 | |
| Complaints filed against the promoter | 2 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 14 Jun 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · St. Marks Road Branch, Bangalore | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Silk Institute | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 56 | 47 |
| MG Road (CBD) | 23 | 20 |
| Manyata Tech Park | 31.5 | 27.5 |
| ITPL, Whitefield | 40.5 | 30.5 |
| Ecospace, Bellandur ORR | 28 | 21.5 |
| Electronic City Ph 1 | 25 | 17.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km |
|---|