Finishing will be good. Ventilation is ample. Cricket pitch is under construction. Lift is smooth. Corridor could have been wider. Roads are not paved yet. No provisional shops nearby, had to walk atleast 600m.
VVinay Kumar6 Apr 2025★★★★★
I am extremely pleased with the exceptional construction quality and professionalism demonstrated by Aditya Developers. From the foundation to the finishing touches, their attention to detail and commitment to quality were evident in every…
CChandhu Vasista18 Jun 2024★★★★★
Very good builders. Quality good. Will handover in time
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sree Adithya Lotus Park in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Building plan (BBMP)
Sanctioned 1 Jan 2024 · No. BBMP/Addl.Dir/JDNORTH/0029/22-23
Power NOC (BESCOM)
Filed with the registration
Fire department
Filed with the registration
SEIAA
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water and sewerage NOC (BWSSB)
issued 23 Nov 2022
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
30 Sep 2026
Registration certificates
PRM/KA/RERA/1251/446/PR/300124/006599
Land use
Conversion order
Land conversion
Converted 4 Mar 2022 · Deputy Commissioner Bangalore Urban District
Survey numbers
Old Sy No.18/2, New Converted · Old Sy No.18/2, New Converted
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet
Form 4 certified totals
Not verified yet
Unit sizes
3BHK A: carpet vs rest
Not verified yet
Unit mix filed
2 BHK Flats · avg 72 m² 66%3 BHK Flats · avg 102 m² 34%
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Drains, lakes and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Electricity · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation
Electricity, built
100%
Indoor Sports facility, built
100%
Gym, built
100%
Water and Sanitation, built
100%
Kitchen handover
Not verified yet
Covered parking per unit
1.11 (157 covered spaces for 141 units)
Sewage plant
Not verified yet
Power backup
Declared by the promoter
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
Not verified yet
Water below ground
27.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Borewell, BWSSB
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Road distance from the site
Nuisances
Distance from the filed pin
As the promoter reported it
Site photos filed with K-RERA, Q2 2026-27
Work left
By component, Q2 2026-27
Quarterly return, Q2 2026-27
Main structure
100% · planned by 15 Dec 2024
Electrical and plumbing finishing
100% · planned by 30 Mar 2026
Internal roads
Not verified yet
Club house
Not verified yet
Completion
100%
Completion, accountant
98.6% of the estimated cost spent
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
30 Sep 2026
RERA completion date
30 Sep 2026
Completion date, agreement
30 Sep 2026
Work began, as filed
1 Jan 2024
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
External walls: 6"; Internal walls: 4"
Concrete / steel grade
Not verified yet
Building heights, fire NOC
14.96 m filed, 2 towers
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot