| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
96 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,477–3,131 sqft |
| Dec 2026 |
| LapazExtended to 20-03-2027 | SANTOSH GLEN LEWIS | Apartment | 527–947 sqft carpet (as filed) | Mar 2027 |
8 of 21 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Solace - A Sindhuri Infra Project in the interactive atlas
Transfer of the land
Sale deed
Survey 86/63-47
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./EST/0041/24-25
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · BBMP · Survey 86/63-47
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/210625/007863
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 May 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: OLD EC and affidavits, 4 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 86-63-47 | |
|---|---|---|
| Land extent, Sy 86-63-47 | 631.7 (unit not stated) | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 631 sq m | |
| Khata | A Khatha · BBMP · 23 May 2025 | |
| Sale deed | Dated 22 Dec 2023 | |
| Building plan (BBMP) | Sanctioned 23 May 2024 · No. BBMP/Ad.Com./EST/0041/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2027 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 86-63-47 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Apartment of 12 Flats having Three Bedrooms… 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartment of 12 Flats having Three Bedrooms | 12 | 1,233 |
| Magnolia Delight | about 4 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Legacy Saviero | about 4.5 km | Locked | |
| Century Regalia (Project 2) | about 5 km | Locked | |
| Vkk Grand | about 5.5 km | Locked |
| Solace - A Sindhuri Infra Project This project | This project is the point the others are measured from | 31 Dec 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 4 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Cox town | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.17 (14 covered spaces for 12 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Groundwater | Not verified yet | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | Not verified yet | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (BWSSB) | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2 km, Tannery Road | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 2 Sep 2025 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 May 2026 | |
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 23 May 2024 |
| Structure | RCC structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | External walls: 6"; Internal walls: 4" | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Living and dining: marble; Master bedroom: wooden flooring; Bedrooms: vitrified tiles (798x1598 mm) | |
| Toilet tiles | Vitrified tiles (walls) | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 7.35 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 26 May 2025 · site inspected 18 May 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.70 Cr 36.4%Development · ₹8.20 Cr 63.6%
| Estimated cost | ₹12.90 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹8.20 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (12) 100%
| Flats sold, at completion | 0 | |
|---|---|---|
| Flats unsold, at completion | 12 | |
| Flats in the phase | 12 |
| Escrow bank | Axis Bank · Jai Bharath Nagar Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 May 2025 | |
| Building plan (BBMP) | Sanctioned 23 May 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Jai Bharath Nagar Branch | |
| Lodha Mirabelle | about 5.5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 6.5 km | Locked |
|---|
| Vista Svara | about 6.5 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 7 km | Locked |
|---|
| Sumadhura Solea | about 7 km | Locked |
|---|
| Renaissance Srichakra | about 7 km | Locked |
|---|
| about 4.5 km |
| 30 Jun 2027 |
| 45% (43 of 96) |
| Locked |
| Century Regalia (Project 2) | about 5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Vkk Grand | about 5.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Lodha Mirabelle | about 5.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 490 | |
| Booked | 185 of 490 (38%) | |
| Unsold | 305 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 57 months |
| Kempegowda Airport | 31.5 | 23.5 |
| MG Road (CBD) | 6.5 | 4 |
| Manyata Tech Park | 7.5 | 5 |
| ITPL, Whitefield | 15.5 | 12 |
| Ecospace, Bellandur ORR | 17 | 10 |
| Electronic City Ph 1 | 26 | 18.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1 km, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Raheja Mansion Substation on OpenStreetMap |