Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Affinity BrundaavanaExtended to 01-04-2027 | AFFINITY PROJECTS | Apartment | 775–1,609 sqft carpet (as filed) | Apr 2027 |
| Alpine Pyramid - IrisActive · 42% built | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 729–1,004 sqft carpet (as filed) | Apr 2028 |
| Amigo EstellaCompleted · OC 06-04-2023 | AMIGOESTELLA INDIA LLP |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 58 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Apartment |
| – |
| Completed |
| Arvind SporciaCompleted · OC 23-03-2018 | Arvind SmartSpaces Limited | Apartment | 3,768 sqft carpet (as filed) | Completed |
| Assetz Soho & Sky Phase 1bActive · 85% built | APG IMPERIAL HOMES PRIVATE LIMITED | Apartment | 1,370–1,886 sqft carpet (as filed) | Dec 2027 |
| Baldota SignatureCompleted · OC 29-12-2022 | BALDOTA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| BlissCompleted · OC 15-04-2023 | FINELINE INFRA PRIVATE LIMITED | Apartment | 758 sqft carpet (as filed) | Completed |
| Boulevard ResidencesCompleted · OC 27-01-2023 | SILVERTREE PROJECTS LLP | Apartment | 678–1,039 sqft carpet (as filed) | Completed |
8 of 38 other projects in Rachenahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sumadhura Solea in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BDA) | Sanctioned 2 Feb 2026 · No. No GBA/BNCC/0784/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/145/2025 · issued 23 May 2025 | Clear |
| Environmental clearance | SEIAA 107 CON 2024 · EC identification no. EC24C3801KA5953190N · issued 12 Nov 2024 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 16 Apr 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2029 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 115/2P | Converted 15 Dec 2008 · DC Bangalore | |
| Sy 116/1P | Converted 17 Jan 2009 · DC Bangalore | |
| Sy 116/2P | Converted 17 Nov 2018 · DC Bangalore | |
| Sy 116/2P | Converted 10 Jan 2005 · DC Bangalore | |
| Survey numbers | 115/2P · 116/1P · 116/2P · 116/2P |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.2 km, Telecom layout, Ashwathnagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 20 m, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 540 m to the south-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Air Conditioning, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.35 (315 covered spaces for 233 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 31 May 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 27% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Jun 2029 | |
| RERA completion date | 30 Jun 2029 | |
| Work began, as filed | 1 Feb 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 106.69 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/145/2025 · issued 23 May 2025 | |
| Environmental clearance | SEIAA 107 CON 2024 · EC identification no. EC24C3801KA5953190N · issued 12 Nov 2024 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 4 Feb 2026 · site inspected 22 Jan 2026 | |
| Chartered accountant's certificate, registration | Dated 22 Jan 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹58.91 Cr 20.9%Development · ₹222.36 Cr 79.1%
| Estimated cost | ₹281.27 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹172.07 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (32) 13.7%Unsold (201) 86.3%
| Sold, Q4 2025-26 | 0 / 233 · 233 available | |
|---|---|---|
| Sold, Q1 2026-27 | 21 / 233 · 212 available | |
| Sold, Q2 2026-27 | 32 / 233 · 201 available | |
| Unsold, Q2 2026-27 | 201 | |
| Sold in Q1 2026-27 | 21 | |
| Sold in Q2 2026-27 | 11 | |
| Flats booked, Form 4 Q1 2026-27 | 21 |
| Escrow bank | HDFC · Kasturba Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹8.83 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.20 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 24 | |
|---|---|---|
| Marked completed | 10 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 2 Feb 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Kasturba Road, Bangalore | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 80 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 20 m, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 2.5 km, Nagawara | |
| Kempegowda Airport | 24.6 | 26 | 17.2 |
| MG Road (CBD) | 12.5 | 16 | 10.2 |
| Manyata Tech Park | 3.0 | 5 | 2.3 |
| ITPL, Whitefield | 20.3 | 24 | 14.7 |
| Ecospace, Bellandur ORR | 25.2 | 34 | 16.4 |
| Electronic City Ph 1 | 34.0 | 41 | 25.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the west, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | 1.6 km to the north | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the south |