Overview
Samhita Serene MTB-Phase II
Part ofSamhita Serene MTB2 phases, 484 flats
Overview
Part ofSamhita Serene MTB2 phases, 484 flats
Overview
Part ofSamhita Serene MTB2 phases, 484 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 62 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Samhita Serene MTB-Phase II in the interactive atlas
Transfer of the land
Sale deed
Survey 132/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. MDP-1-06352-2017-18 · Book 1 · executed 27 Sep 2017 · Consideration ₹1.6 L · Sy 132/1, Bengaluru East taluk
Title deed filed with K-RERA, pp. 1, 5, 9, 10 · See it in Documents
Transfer of the land
Title deed registered
No. MDP-1-06352-2017-18 · Book 1 · executed 27 Sep 2017 · Consideration ₹1.6 L · Sy 132/1, Bengaluru East taluk
Title deed filed with K-RERA, pp. 1, 5, 9, 10 · See it in Documents
Transfer of the land
Title deed registered
No. MDP-1-06352-2017-18 · Book 1 · executed 27 Sep 2017 · Consideration ₹1.6 L · Sy 132/1, Bengaluru East taluk
Title deed filed with K-RERA, pp. 1, 5, 9, 10 · See it in Documents
Transfer of the land
Sale deed
Survey 132/1, 132/3, 132/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 132/1, 132/3, 132/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 132/1, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · KITHIGANUR GRAM PANCHAYATH · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · KITHIGANUR GRAM PANCHAYATH · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · KITHIGANUR GRAM PANCHAYATH · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · KITHIGANUR GRAM PANCHAYATH · Survey 132/1, 132/2, 132/3, 132/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan NM/AS/AA/2/TS/3/w/10/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/231123/006425
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 26,354 sq m | |
| The whole survey number on the KGIS map | 31,754 sq m | |
| Extent the filed land schedule names for these survey numbers | 26,709 sq m | |
| Plot area against the filed extent | 0.99 times | |
| Land area filed with K-RERA | 16,216 sq m | |
| Village, hobli and taluk on the KGIS map | Kitthaganur, Bidarahalli-2 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 132/1, 132/2, 132/3, 132/4 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 16,216 sq m | |
| Khata | E Khatha · KITHIGANUR GRAM PANCHAYATH · 5 Mar 2020 | |
| Sale deed | Dated 14 Aug 2006, 28 Sep 2017 | |
| Sy. No. 132/1 | 1 | 3 acres 8 guntas | 0 | |||
| Sy. No. 132/2 | 1 | 1 acre 13 guntas | 0 | |||
| Sy. No. 132/3 | 2 | 1 acre 18 guntas | 0 | |||
| Sy. No. 132/4 | 1 | 15 guntas | 0 |
| Building plan (BDA) | Sanctioned 19 Jul 2023 · No. NM/AS/AA/2/TS/3/w/10/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 154 CON 2019 · issued 6 Feb 2020 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 8 Aug 2011 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 132/1 · 132/2 · 132/3 · 132/4 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 75 m² 67.1%3BHK · avg 95 m² 28.8%1BHK 4.1%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 12 | 5,748 |
| 2BHK | 196 | 1,58,961 |
| 3BHK | 84 | 85,702 |
| Sold, Q2 2026-27 | 158 / 292 | |
|---|---|---|
| Unsold, Q2 2026-27 | 134 |
| Assetz Sun & Sanctum - Phase 2 | about 2 km | Locked | |
|---|---|---|---|
| Legacy Saviero | about 4.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 4.5 km | Locked | |
| Vkk Grand | about 4.5 km | Locked | |
| 2g Tula | about 5 km |
| Samhita Serene MTB-Phase II This project | This project is the point the others are measured from | 31 Dec 2026 | 54% (158 of 292) | Not verified yet |
|---|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 2 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Legacy Saviero | about 4.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.03 (301 covered spaces for 292 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 50% · planned by 31 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 20% · planned by 31 Aug 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 96% | |
| Completion, accountant | 77.5% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Sep 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 150 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 154 CON 2019 · issued 6 Feb 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 30 Apr 2023 | |
| Engineer's certificate, registration | Dated 29 May 2023 | |
| Chartered accountant's certificate, registration | Dated 7 Jun 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹17.30 Cr 15.1%Development · ₹97.00 Cr 84.9%
| Estimated cost | ₹114.30 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹85.80 Cr | |
| Estimated cost, Form 4 Q4 2025-26 | ₹97.00 Cr | |
| Cost incurred | ₹75.13 Cr (77.5% of the estimate) | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (158) 54.1%Unsold (134) 45.9%
| Sold, Q3 2025-26 | 158 / 292 · 134 available | |
|---|---|---|
| Sold, Q4 2025-26 | 158 / 292 · 134 available | |
| Sold, Q1 2026-27 | 158 / 292 · 134 available | |
| Sold, Q2 2026-27 | 158 / 292 · 134 available | |
| Unsold, Q2 2026-27 | 134 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | FEDERAL BANK OF INDIA · Indiranagar Bengaluru | |
|---|---|---|
| Designated account, collected | ₹2.62 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.37 Cr in Q2 2026-27 (91% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹30,10,19,732 | |
| Escrow account, Q2 2026-27 | ₹2.37 Cr withdrawn | |
| Escrow account, Q3 2025-26 | ₹6.09 Cr deposited from sales | |
| Escrow account to date, Q4 2025-26 | ₹60.43 Cr deposited from sales, ₹56.79 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹62,48,88,679 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 19 Jul 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · Indiranagar Bengaluru | |

| Nava Skanda Bellavita | about 5 km | Locked |
|---|
| Garuda Grand | about 5 km | Locked |
|---|
| Chaithanya Sankhya | about 5 km | Locked |
|---|
| The Pearl Paradise | about 5.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 5.5 km | Locked |
|---|
| Sattva Songbird | about 5.5 km | Locked |
|---|
| Radiance Floresta | about 6 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 |
|---|
| about 4.5 km |
| 31 Dec 2027 |
| 93% (280 of 300) |
| Locked |
| Vkk Grand | about 4.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| 2g Tula | about 5 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
|---|
| Nava Skanda Bellavita | about 5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Projects within 4 km, counted | 25 (25 with an approximate location) | |
|---|---|---|
| Flats in them | 6,081 | |
| Booked | 4,060 of 6,081 (67%) | |
| Unsold | 2,021 | |
| Booked a month, pooled | 96 flats | |
| Months to sell, pooled | 21 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5 km, Horamavu | |
| Kempegowda Airport | 30 | 17.5 |
| MG Road (CBD) | 17 | 12.5 |
| Manyata Tech Park | 12 | 8.5 |
| ITPL, Whitefield | 12 | 7.5 |
| Ecospace, Bellandur ORR | 18 | 13 |
| Electronic City Ph 1 | 32 | 22.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the north-west, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |