| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 37 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mgr Brindavan in the interactive atlas
Approval or registration
Khata issued
E Khatha · Gramapanchayat Mandur · Survey 100/1
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner Bengaluru · Survey 100/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan CC/311/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/130526/008649
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 27 Apr 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | AU SMALL FINANCE BANK · ₹10.00 Cr disbursed | |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: ADLR Sketch MGR, 2 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 3,322 sq m | |
| The whole survey number on the KGIS map | 14,747 sq m | |
| Extent the filed land schedule names for these survey numbers | 2,125 sq m | |
| Plot area against the filed extent | 1.56 times | |
| Land area filed with K-RERA | 1,735 sq m | |
| Village, hobli and taluk on the KGIS map | Manduru, Bidarahalli-2 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 100/1 | |
|---|---|---|
| Land extent, Sy 100/1 | 0 acre 21 guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,735 sq m | |
| Khata | E Khatha · Gramapanchayat Mandur · 23 Oct 2024 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 100/1 | 2 | 35 guntas | 21 guntas | Differs: 14 guntas apart | 0 |
| Building plan (Hoskote Planning Authority) | Sanctioned 13 Oct 2025 · No. CC/311/25-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 5 Dec 2024 · Deputy Commissioner Bengaluru | |
|---|---|---|
| Survey numbers | 100/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 85 m² 66.7%2BHK 33.3%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 12 | 8,762 |
| 3BHK | 24 | 21,980 |
| Sold, Q2 2026-27 | 7 / 36 | |
|---|---|---|
| Unsold, Q2 2026-27 | 29 | |
| Months to sell, derived from filed bookings | 12 months |
| Definer Upper Deck | about 0.5 km | Locked | |
|---|---|---|---|
| Neighbourhood Tree Park | about 0.5 km | Locked | |
| Chaithanya Sankhya | about 1.5 km | Locked | |
| Sattva Songbird | about 3.5 km | Locked | |
| Godrej Woodscapes | about 3.5 km |
| Mgr Brindavan This project | This project is the point the others are measured from | 31 Dec 2028 | 19% (7 of 36) | Not verified yet |
|---|---|---|---|---|
| Definer Upper Deck | about 0.5 km | 31 Dec 2025 | 71% (78 of 110) | Locked |
| Neighbourhood Tree Park | about 0.5 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7 km, TRIVENI NAGAR NEAR KR PURAM | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 10% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (36 covered spaces for 36 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Gramapanchayat Manduru), Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | 60% · planned by 31 Mar 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Oct 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 65% | |
| Completion, accountant | 37.3% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 16 Mar 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.9 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 31 Mar 2026 · site inspected 28 Mar 2026 | |
| Engineer's certificate, registration | Dated 26 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 22 Apr 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹39.9 L 2.1%Development · ₹18.35 Cr 97.9%
| Estimated cost | ₹18.75 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹13.00 Cr | |
| Cost incurred | ₹7.00 Cr (37.3% of the estimate) | |
| Cost left | ₹11.75 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹0 | |
| Land cost revision | Not verified yet | |
Sold (7) 19.4%Unsold (29) 80.6%
| Sold, Q1 2026-27 | 0 / 36 · 36 available | |
|---|---|---|
| Sold, Q2 2026-27 | 7 / 36 · 29 available | |
| Unsold, Q2 2026-27 | 29 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | AU Small Finance Bank · RAJAPALYA HOODI | |
|---|---|---|
| Designated account, collected | ₹3.62 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.58 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | AU SMALL FINANCE BANK · ₹10.00 Cr disbursed | |
|---|---|---|
| Records searched to | 27 Apr 2026 | |
| Building plan | Sanctioned 13 Oct 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | AU Small Finance Bank · RAJAPALYA HOODI | |
| Locked |
| One Residences At Sobha One World Ph4 W7 And 8 | about 4.5 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 4.5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 4.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 6 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 6 km | Locked |
|---|
| Riqueza Siri | about 6.5 km | Locked |
|---|
| Triaxis Splendour + | about 7 km | Locked |
|---|
| Chaithanya Sankhya |
|---|
| about 1.5 km |
| 30 Nov 2028 |
| 66% (29 of 44) |
| Locked |
| Sattva Songbird | about 3.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
|---|
| Godrej Woodscapes | about 3.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 4.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| Projects within 4 km, counted | 24 (24 with an approximate location) | |
|---|---|---|
| Flats in them | 8,858 | |
| Booked | 6,177 of 8,858 (70%) | |
| Unsold | 2,681 | |
| Booked a month, pooled | 99 flats | |
| Months to sell, pooled | 27 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2 km to the west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 9.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 22.5 | 13.5 |
| MG Road (CBD) | 24.5 | 19 |
| Manyata Tech Park | 19 | 14 |
| ITPL, Whitefield | 15.5 | 10.5 |
| Ecospace, Bellandur ORR | 24.5 | 18.5 |
| Electronic City Ph 1 | 39.5 | 27.5 |
| Landfill or waste transfer station | about 1 km, named Mandur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Manduru on OpenStreetMap |