| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 65 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Every finding in the report counts: clear 1, to review ½, red flag 0. Any red flag caps the DOSL Score at 59. A project needs 4 findings to be scored. The same rule for every project, with every section counted, so the DOSL Score is the same for every reader.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Riqueza Siri in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BMRDA) | Sanctioned 7 Feb 2023 · No. HSK-LBPAS-10465/22-23/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Nov 2027 |
| Land conversion | Converted 11 Jul 2016 · D C Conversion | |
|---|---|---|
| Survey numbers | 38-14-227/1 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 8.5 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2.5 km to the west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup | |
|---|---|---|
| Electricity, built | 70% | |
| Outdoor Sports facility, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.04 (133 covered spaces for 128 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 21 Apr 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 25 Feb 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 94% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Nov 2027 | |
|---|---|---|
| Schedule end | 14 Jun 2026 | |
| RERA completion date | 30 Nov 2027 | |
| Work began, as filed | 16 Mar 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 20 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 23 Feb 2023 · site inspected 20 Feb 2023 | |
| Chartered accountant's certificate, registration | Dated 10 Mar 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹9.39 Cr 31.1%Development · ₹20.83 Cr 68.9%
| Estimated cost | ₹30.22 Cr | |
|---|---|---|
| Cost incurred | ₹26.44 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.50 Cr | |
| Land cost revision | Not verified yet | |
Sold (66) 51.6%Unsold (62) 48.4%
| Sold, Q3 2025-26 | 51 / 128 · 77 available | |
|---|---|---|
| Sold, Q4 2025-26 | 57 / 128 · 71 available | |
| Sold, Q1 2026-27 | 59 / 128 · 69 available | |
| Sold, Q2 2026-27 | 66 / 128 · 62 available | |
| Unsold, Q2 2026-27 | 62 | |
| Sold in Q4 2025-26 | 6 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | Karur Vysya Bank Ltd. · Hoskote | |
|---|---|---|
| Designated account, collected | ₹3.01 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.18 Cr in Q2 2026-27 (72% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹1,75,11,309 | |
| Withdrawn from the escrow account to date | ₹15,29,72,696 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 7 Feb 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Karur Vysya Bank Ltd. · Hoskote | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2.5 km to the west, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 9 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 34 | 18 |
| MG Road (CBD) | 27.5 | 24 |
| Manyata Tech Park | 27 | 20 |
| ITPL, Whitefield | 17 | 11.5 |
| Ecospace, Bellandur ORR | 27.5 | 20.5 |
| Electronic City Ph 1 | 42 | 28.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km, named Hoskote on OpenStreetMap |
|---|