Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 65 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Century HorizonCompleted (regulator flag) | CENTURY STAR | Mixed development | – | Completed |
| Fortuna AcaciaLapsed · completion date passed | FortunaConstructions India Private Limited | Apartment | 1,985 sqft carpet (as filed) | Mar 2021 |
| Govianu Jodidhar AtlantisLapsed · completion date passed | Mahesh | Apartment | – | Jun 2025 |
| Hoysala Ace-IILapsed · completion date passed | Hoysala Projects Private Limited | Apartment | – | Jan 2020 |
| Kay Arr MaverickCompleted · OC 21-10-2020 | KAY ARR & CO | Apartment | – | Completed |
| Ltcel Raintree Boulevard Cl 2Completed (regulator flag) | L&T Realty Developers Limited | Apartment | 1,296 sqft carpet (as filed) | Completed |
| Ltcel Raintree Boulevard Cl3Completed (regulator flag) | L&T Realty Developers Limited | Apartment | – | Completed |
| Ltcel Raintree Boulevard Cl4Filed as completed · no completion certificate on record | L&T Realty Developers Limited | Apartment | 1,249 sqft carpet (as filed) | Sep 2022 |
8 of 14 other projects in Byatarayanapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open L&T Elara Celestia in the interactive atlas
Approval or registration
Land use converted
DC Bangalore · Survey 5036879205
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Larsen & Toubro Limited · Survey 5036879205
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 5036879205
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0105/24-25
K-RERA filing, approvals
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: 7 ADLR Survey Sketch self attested.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 4 Mar 2025 · No. BBMP/Addl.Dir/JDNORTH/0105/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/523/2024 · issued 29 Jan 2025 · building height 44.3 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | NOC ID BIAL/SOUTH/B/100919/432165 · issued 15 Nov 2019 · permissible top elevation 963.7 m above mean sea level · valid until 14 Nov 2027 | Clear |
| Pollution board (CFE) | consent order CTE-347192 · issued 23 Jan 2025 · valid until 22 Jan 2030 | Clear |
| Water and sewerage NOC (BWSSB) | issued 25 Nov 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Mar 2030 |
| Land conversion | Converted 9 Jun 1969 · DC Bangalore | |
|---|---|---|
| Survey numbers | 5036879205 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 120 m² 73.5%4BHK · avg 185 m² 22.7%2BHK Special Unit 1.3%5BHK - Duplex · avg 328 m² 1.1%3 other types 1.4%
| Sold, Q2 2026-27 | 561 / 634 | |
|---|---|---|
| Unsold, Q2 2026-27 | 73 | |
| Months to sell, derived from filed bookings | 4 months |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Air Conditioning, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.36 (862 covered spaces for 634 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |

| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.3 m on the fire NOC · 43.65 m filed, 3 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/523/2024 · issued 29 Jan 2025 · building height 44.3 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 31 Jan 2025 · site inspected 20 Jan 2025 | |
| Engineer's certificate, registration | Dated 27 Jan 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹251.84 Cr 16%Development · ₹1324.92 Cr 84%
Sold (561) 88.5%Unsold (73) 11.5%
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 4 Mar 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Sahakara Nagar | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/100325/007564
K-RERA registration ·
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5036879205 | |
|---|---|---|
| Land extent, Sy 5036879205 | 2,65,373 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 40,752 sq m | |
| Khata | E Khatha · BBMP · 8 Jan 2025 | |
| Sale deed | Dated 4 Mar 1982 | |
| Sale deed in favour of | Larsen & Toubro Limited | |
| 1BHK Special Unit | 4 | 2,583 |
| 2BHK Special Unit | 8 | 8,342 |
| 3BHK | 466 | 6,02,585 |
| 3BHK Special Unit | 3 | 4,639 |
| 4BHK | 144 | 2,86,643 |
| 4BHK - Duplex | 2 | 5,027 |
| 5BHK - Duplex | 7 | 24,725 |
| Assetz Soho & Sky | about 1 km | Locked | |
|---|---|---|---|
| Cumins Sanctum | about 2 km | Locked | |
| Sri Rama Enclave | about 2.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 2.5 km | Locked | |
| 4square Park Sierra | about 3 km |
| L&T Elara Celestia This project | This project is the point the others are measured from | 31 Mar 2030 | 88% (561 of 634) | Not verified yet |
|---|---|---|---|---|
| Assetz Soho & Sky | about 1 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Cumins Sanctum | about 2 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Sri Rama Enclave |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2.5 km, LBSnagar Yelahanka | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB, Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported it
| Main structure | 1% · planned by 31 Jul 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Mar 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 23% | |
| Completion, accountant | 33.3% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Mar 2030 | |
| RERA completion date | 31 Mar 2030 | |
| Work began, as filed | 15 Feb 2025 | |
| Estimated cost | ₹1576.76 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹1084.00 Cr | |
| Cost incurred | ₹524.77 Cr (33.3% of the estimate) | |
| Cost left | ₹1052.00 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹1539.40 Cr | |
| Land cost revision | Not verified yet | |
| Sold, Q3 2025-26 | 387 / 634 · 247 available | |
|---|---|---|
| Sold, Q4 2025-26 | 454 / 634 · 180 available | |
| Sold, Q1 2026-27 | 495 / 634 · 139 available | |
| Sold, Q2 2026-27 | 561 / 634 · 73 available | |
| Unsold, Q2 2026-27 | 73 | |
| Sold in Q4 2025-26 | 67 | |
| Sold in Q1 2026-27 | 41 | |
| Sold in Q2 2026-27 | 66 |
| Escrow bank | KOTAK MAHINDRA BANK · Sahakara Nagar | |
|---|---|---|
| Designated account, collected | ₹160.02 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹121.58 Cr in Q2 2026-27 (76% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 7 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 21 | |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 5 (4 completed, 1 extended) | |
| Average schedule slip | 2 months early |

| Locked |
| Legacy Salvador | about 3.5 km | Locked |
|---|
| Sumadhura Epitome | about 4 km | Locked |
|---|
| Sumadhura Solea | about 4 km | Locked |
|---|
| Mirabelle Phase 2 | about 4.5 km | Locked |
|---|
| Lodha Mirabelle | about 4.5 km | Locked |
|---|
| Rubby Castle 1 | about 4.5 km | Locked |
|---|
| Sobha City Athena | about 5 km | Locked |
|---|
| about 2.5 km |
| 30 Sep 2026 |
| 61% (39 of 64) |
| Locked |
| Assetz Soho & Sky Phase 1b | about 2.5 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
|---|
| 4square Park Sierra | about 3 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Legacy Salvador | about 3.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| Projects within 4 km, counted | 37 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 9,610 | |
| Booked | 5,707 of 9,610 (59%) | |
| Unsold | 3,903 | |
| Booked a month, pooled | 102 flats | |
| Months to sell, pooled | 38 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 0.5 km, Jakkur Cross | |
| Kempegowda Airport | 24 | 19 |
| MG Road (CBD) | 13.5 | 11 |
| Manyata Tech Park | 8 | 4.5 |
| ITPL, Whitefield | 25 | 18.5 |
| Ecospace, Bellandur ORR | 29 | 19 |
| Electronic City Ph 1 | 33.5 | 27.5 |
| Landfill or waste transfer station | about 1 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the east, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named L&T Substation on OpenStreetMap |