Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jrc Palladio Phase 2 in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|
| 5/3 | 3 Oct 2015Deputy Commissioner | 11 Nov 2020in favour of BCITS Private Limited | 12 Apr 2023E Khatha · panchayath | 1 acre 20.08 guntas |
|---|
| 7/2 | 3 Oct 2015Deputy Commissioner | 11 Nov 2020 | 13 Apr 2023E Khatha · panchayath | 4 acres 04 guntas |
|---|
| Survey 19 | ||||
|---|---|---|---|---|
| 19/1 | 29 Apr 2016Deputy Commissioner | 18 Aug 2021 | 13 Apr 2023E Khatha · panchayath | 26.08 guntas |
| 19/2 | 29 Jan 2016Deputy Commisioner | 18 Aug 2021 | 13 Apr 2023E Khatha · panchayath | 19 guntas |
| 19/3 | 29 Jan 2016Deputy Commissioner | 18 Aug 2021 | 12 Apr 2023E Khatha · panchayath | 13.08 guntas |
| 20/2 | 28 Sep 2016Deputy Commissioner | 18 Aug 2021 | 13 Apr 2023E Khatha · panchyath | 0-01.04 guntas |
|---|
| Survey 22 | ||||
|---|---|---|---|---|
| 22/1 | 28 Sep 2016Deputy Commissioner | 18 Aug 2021 | 12 Apr 2023E Khatha · panchayath | 0-00.12 guntas |
| 22/2 | 28 Sep 2016deputy commissioner | 18 Aug 2021 | 10 Apr 2023E Khatha · panchayath | 2 acres 18.08 guntas |
| 22/3 | 19 Aug 2016Deputy Commissioner | 5 Sep 2018in favour of JRC Projects | 18 Apr 2023E Khatha · Panchayath | 20 guntas |
| 22/4 | Not converted | 12 Mar 2021in favour of JRC Projects | 18 Apr 2023E Khatha · Panchayath | 6 guntas |
| Survey 21 | ||||
|---|---|---|---|---|
| 21/2 | 28 Sep 2016Deputy Commissioner | 18 Aug 2021 | 12 Apr 2023E Khatha · panchayath | 21.08 guntas |
| 21/3 | 19 Aug 2016Deputy Commissioner | 5 Sep 2018in favour of JRC Projects | 11 Apr 2023E Khatha · panchayath | 0.35 Guntas |
| 21/4 | 19 Aug 2016Deputy Commissioner | 5 Sep 2018 | 12 Apr 2023E Khatha · Panchayath | 1 acre |
| 21/6 | 4 Feb 2023Deputy Commissioner | No sale deed | 18 Apr 2023E Khatha · panchayath | 14 guntas |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹1.56 Cr · Sy 21/2, Sarjapura hobli, Anekal taluk; Sy 22/2, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 15, 22, 23 · See it in Documents
Transfer of the land
Title deed executed
Sy 21/5; 21/1, Sarjapura hobli, Anekal taluk · 0 Acres 17 Guntas; Sy 13, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 25 · See it in Documents
Transfer of the land
Title deed executed
Sy 21/4, Sarjapura hobli
Title deed filed with K-RERA, pp. 2, 24 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹9.43 Cr · Sy 7/2; 7, Billchikkanahalli village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 18, 43 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹9.43 Cr · Sy 7/2; 7, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 18, 43 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan LAO 20/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/090623/005987
K-RERA registration ·
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: Sy No 21_6 Sketch, 2 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5/3, 7/2, 19-1, 19-2, 19/3, 20/2 and 8 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · panchayath · 12 Apr 2023; E Khatha · panchayath · 13 Apr 2023; E Khatha · panchyath · 13 Apr 2023; and 5 more | |
| Sale deed | Dated 5 Sep 2018, 11 Nov 2020, 12 Mar 2021 and 1 more | |
| Sale deed in favour of | BCITS Private Limited, JRC Projects | |
| Title deed | Sy 19/1 | |
| Title deed | Sy 21/2 | |
| Title deed | Sy 7/2; 7 · 04 Acres 04 Guntas | |
| Title deed | Sarjapura hobli, Anekal taluk | |
| Title deeds | And 3 more read from the filing | |
| Building plan (Local Planning Authority) | Sanctioned 6 Mar 2023 · No. LAO 20/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Dec 2023 |
| Land conversion | 13 of 14 parcels converted | |
|---|---|---|
| Sy 5/3, 7/2 | Converted 3 Oct 2015 · Deputy Commissioner | |
| Sy 19-1 | Converted 29 Apr 2016 · Deputy Commissioner | |
| Sy 19-2 | Converted 29 Jan 2016 · Deputy Commisioner | |
| Sy 19/3 | Converted 29 Jan 2016 · Deputy Commissioner | |
| Sy 20/2, 22/1, 21/2, 22/2 | Converted 28 Sep 2016 · Deputy Commissioner | |
| Sy 21/3, 21/4, 22/3 | Converted 19 Aug 2016 · Deputy Commissioner | |
| Other parcels | 2 more groups on the filing | |
| Survey numbers | 5/3 · 7/2 · 19-1 · 19-2 · 19/3 · 20/2 · 22/1 · 21/2 · 22/2 · 21/3 · 21/4 · 21/6 · 22/3 · 22/4 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Mitta Orrin | about 3.5 km | Locked | |
|---|---|---|---|
| Suyug's Saffron | about 3.5 km | Locked | |
| Engrace Vista | about 4 km | Locked | |
| Mahidhara Harmony | about 4 km | Locked | |
| Engrace 4 | about 4 km | Locked |
| Jrc Palladio Phase 2 This project | This project is the point the others are measured from | 30 Dec 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 3.5 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Suyug's Saffron | about 3.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
| Engrace Vista |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 11 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Panchayath) | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Dec 2023 | |
| Work began, as filed | 5 Nov 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 18 Apr 2023 · site inspected 6 Jan 2023 | |
Land · ₹8.19 Cr 26.9%Development · ₹22.28 Cr 73.1%
| Estimated cost | ₹30.46 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹13.71 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | ICICI Bank · Kasavanahalli | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 | |
| Other phases under this promoter name | 4 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 5 months early |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 6 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Kasavanahalli | |
| Engrace 3 | about 4.5 km | Locked |
|---|
| Sowparnika Olivia Nest | about 4.5 km | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 5 km | Locked |
|---|
| Acorn Hive | about 5 km | Locked |
|---|
| Vistar White Pearl | about 5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 5 km | Locked |
|---|
| about 4 km |
| 30 Dec 2028 |
| 46% (181 of 392) |
| Locked |
| Mahidhara Harmony | about 4 km | 10 Sep 2026 | 62% (91 of 146) | Locked |
|---|
| Engrace 4 | about 4 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Engrace 3 | about 4.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Projects within 4 km, counted | 21 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 4,809 | |
| Booked | 1,996 of 4,809 (42%) | |
| Unsold | 2,813 | |
| Booked a month, pooled | 85 flats | |
| Months to sell, pooled | 33 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 9 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 57.5 | 42 |
| MG Road (CBD) | 30.5 | 25 |
| Manyata Tech Park | 38.5 | 29.5 |
| ITPL, Whitefield | 24 | 18 |
| Ecospace, Bellandur ORR | 20.5 | 15 |
| Electronic City Ph 1 | 17.5 | 10.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 3 km to the east |