| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 49 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| Location & risks | – | 1 | 2 | Review |
|---|
| Construction & progress | – | 1 | 1 | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Icon Calista in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner · Survey 54
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Hennagara Grama Panchayath · Survey 54
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Kachanayakanahalli village, Jigani hobli · 02 Acres 36 Guntas
Title deed filed with K-RERA, pp. 1, 37 · See it in Documents
Approval or registration
Building plan sanctioned
BMRDA · plan APA:LAO/118/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/270723/006100
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 2 pages.
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: SURVEY SKETCH, 1 page.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched.
| Survey numbers | 54 | |
|---|---|---|
| Land extent, Sy 54 | 2 Acres, 36 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Hennagara Grama Panchayath · 5 Sep 2020 | |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 54 | 1 | 2 acres 36 guntas | 2 acres 36 guntas | Yes | Not read yet |
| Building plan (BMRDA) | Sanctioned 15 May 2023 · No. APA:LAO/118/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | Applied for · Applied 8 Jul 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2026 |
| Land conversion | Converted 22 Oct 2012 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 54 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Abhee Serenity Springs | 330 m | Locked | |
|---|---|---|---|
| Shriram Sapphire (Codename Ultimate) | 3.0 km | Locked | |
| Vasuki Vallabha | 3.1 km | Locked | |
| Sowmya Skyla | about 3.5 km | Locked |
| Icon Calista This project | This project is the point the others are measured from | 30 Jun 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Abhee Serenity Springs | 330 m | 30 Jun 2030 | 38% (110 of 288) | Locked |
| Shriram Sapphire (Codename Ultimate) | 3.0 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 120 m from the site | Clear |
| Nearest government-flagged flood location | 8.9 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 490 m to the east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Jun 2026 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2026 | Review |
| Work began, as filed | 3 Jul 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 8 Jun 2023 · site inspected 7 Jun 2023 | |
| Engineer's certificate, registration | Dated 8 Jun 2023 | |
| Chartered accountant's certificate, registration | Dated 19 Jul 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.91 Cr 36.8%Development · ₹3.29 Cr 63.2%
| Estimated cost | ₹5.20 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹2.27 Cr | |
| Estimated cost, Form 4 Q4 2025-26 | ₹6.80 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Canara Bank · HSR Layout | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Net amount withdrawable, Form 4 | ₹1,61,04,217 | |
| Withdrawn from the escrow account to date | ₹5,17,13,348 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 15 May 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · HSR Layout | |

Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Abhee Serenity Springs, price locked; Shriram Sapphire (Codename Ultimate), price locked; Vasuki Vallabha, price locked.
| Ramky One Karnival | 4.4 km | Locked |
|---|
| Signature Heights | about 5 km | Locked |
|---|
| Columbia Aaltius | about 6 km, to a locality centre | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 6 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 6 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 6 km | Locked |
|---|
| SOBHA Townpark | 6.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 6.5 km | Locked |
|---|
| Vasuki Vallabha | 3.1 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
|---|
| Sowmya Skyla | about 3.5 km | 31 Dec 2026 | 19% (13 of 68) | Locked |
|---|
| Ramky One Karnival | 4.4 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
|---|
| Signature Heights | about 5 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹20,000 /mo · 9 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹8,500 /mo · 6 listings | |
| Rent per sq ft, 3 km | ₹18.9 /mo, as listed · 6 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 25 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 12,006 | |
| Booked | 2,906 of 12,006 (24%) | |
| Unsold | 9,100 | |
| Booked a month, pooled | 37 flats | |
| Months to sell, pooled | 244 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 5.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 2.5 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 58.4 | 63 | 44.7 |
| MG Road (CBD) | 24.1 | 31 | 21.8 |
| Manyata Tech Park | 34.7 | 41 | 28.4 |
| ITPL, Whitefield | 29.4 | 33 | 21.7 |
| Ecospace, Bellandur ORR | 22.2 | 28 | 14.3 |
| Electronic City Ph 1 | 6.4 | 9 | 4.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.0 km to the east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the north, named Yerandanahalli Substation on OpenStreetMap |