I run a small catering business and cover this part of yelahanka sometimes. noticed this site a few weeks back. workers are regular, activity is consistent. the lane next to it has good homes. nice pocket of the city honestly.
Overview
Overview
Overview
Photo: HM ETERNOI run a small catering business and cover this part of yelahanka sometimes. noticed this site a few weeks back. workers are regular, activity is consistent. the lane next to it has good homes. nice pocket of the city honestly.
work near the L&T Tech Park stretch on Bellary Road. Came across this construction site off Jakkur Main while taking a shortcut the road connects very easily. The area around Kogilu Cross and Shivanahalli is nicely placed between the tech…
Sparsh Hospital is literally a 2 minute walk from this construction site on Jakkur Main Road I go there regularly for my kids' checkups. When I see new apartments coming up this close to a hospital of that quality, it genuinely matters. For…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
8 of 126 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Hm Eterno in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Legacy Salvador | about 1.5 km | Locked | |
|---|---|---|---|
| 4square Park Sierra | about 1.5 km | Locked | |
| Godrej Aveline | about 1.5 km | Locked | |
| Tnm Lakeview | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km |
| Hm Eterno This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Legacy Salvador | about 1.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
| 4square Park Sierra | about 1.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | Locked |
|---|
| Assetz Zen & Sato | about 3 km | Locked |
|---|
| Sobha City Athena | about 3.5 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 3.5 km | Locked |
|---|
| Cumins Sanctum | about 4 km | Locked |
|---|
| Assetz Soho & Sky | about 4 km | Locked |
|---|
| Godrej Aveline |
|---|
| about 1.5 km |
| 31 Mar 2031 |
| 91% (769 of 849) |
| Locked |
| Tnm Lakeview | about 2.5 km | 31 Oct 2026 | 100% (36 of 36) | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
|---|
| Projects within 4 km, counted | 63 (63 with an approximate location) | |
|---|---|---|
| Flats in them | 20,151 | |
| Booked | 12,396 of 20,151 (62%) | |
| Unsold | 7,755 | |
| Booked a month, pooled | 462 flats | |
| Months to sell, pooled | 16 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1.5 km, Yelahanka | |
| Kempegowda Airport | 21.5 | 14.5 |
| MG Road (CBD) | 17.5 | 14 |
| Manyata Tech Park | 9.5 | 6 |
| ITPL, Whitefield | 25.5 | 18.5 |
| Ecospace, Bellandur ORR | 30.5 | 20.5 |
| Electronic City Ph 1 | 37.5 | 30 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the west |