Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-3 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 71 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Every finding in the report counts: clear 1, to review ½, red flag 0. Any red flag caps the DOSL Score at 59. A project needs 4 findings to be scored. The same rule for every project, with every section counted, so the DOSL Score is the same for every reader.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| M/s.ADITHYA HOMES |
| Plot |
| – |
| Completed |
| Adithya Homes Paradise Phase-4Lapsed · completion date passed | ADITHYA HOMES | Plot | ~1,200–1,600 sqft (estimate: filed carpet plus 25%) | Jun 2026 |
| Adithya Paradise -5Active · 100% built | PARADISE HOMES | Plot | ~1,200–1,750 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
8 of 41 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Ananda Phase 2 in the interactive atlas
Approval or registration
Khata issued
E Khatha · Panchayat · Survey 176
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan IADB/DO & EE-3/Plot No.R-10/Hardware Sector / 2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/280922/005282
K-RERA registration ·
Title checkApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 9 Mar 2021 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: 5) sketch marking phase 2 enclosed ..
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | Plot No. R-10 , Sy.No. 176 (Bl | |
|---|---|---|
| Land extent, Sy Plot No. R-10 , Sy.No. 176 (Bl | 16,314 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 16,314 sq m | |
| Khata | E Khatha · Panchayat · 18 Mar 2022 | |
| Building plan (KIADB) | Sanctioned 24 May 2022 · No. IADB/DO & EE-3/Plot No.R-10/Hardware Sector / 2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/331/2020 · issued 18 Feb 2021 | Clear |
| Environmental clearance | SEIAA 95 CON 2020 · issued 13 Aug 2020 | Clear |
| Airport height NOC | permissible top elevation 1001.62 m above mean sea level | |
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 21 Jun 2027 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | Plot No. R-10 , Sy.No. 176 (Bl |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
2BHK type 01a · avg 50 m² 20.2%2BHK type 01b · avg 50 m² 18.9%Studio · avg 21 m² 16.2%3BHK type 01b · avg 65 m² 8.1%8 other types 36.6%
| 2BHK type 01a | 209 | 1,11,955 |
| 2BHK type 01b | 196 | 1,04,991 |
| 2BHK type 02a | 60 | 31,818 |
| 2BHK type 02b | 56 | 29,698 |
| 2BHK type 03a | 75 | 43,626 |
| 2BHK type 03b | 70 | 40,612 |
| 2BHK type 03c | 15 | 8,719 |
| 2BHK type 03d | 14 | 8,116 |
| 2BHK type 04 | 6 | 3,563 |
| 3BHK type 01a | 84 | 58,954 |
| 3BHK type 01b | 84 | 59,083 |
| Studio | 168 | 38,836 |
| Sold, Q2 2026-27 | 1,028 / 1,037 | |
|---|---|---|
| Unsold, Q2 2026-27 | 9 |
| Sowparnika Indradhanush Phase I | about 7.5 km | Locked | |
|---|---|---|---|
| Sowparnika Shivadhanush | about 7.5 km | Locked | |
| Triaxis Splendour + | about 10 km | Locked | |
| Riqueza Siri | about 11.5 km | Locked |
| Godrej Ananda Phase 2 This project | This project is the point the others are measured from | 21 Jun 2027 | 99% (1,028 of 1,037) | Not verified yet |
|---|---|---|---|---|
| Sowparnika Indradhanush Phase I | about 7.5 km | 31 May 2027 | 99% (567 of 570) | Locked |
| Sowparnika Shivadhanush | about 7.5 km | 30 Nov 2027 | 99% (357 of 360) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 20 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 70% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 90% | |
| Swimming Pool, built | 100% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.64 (1,704 covered spaces for 1,037 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
As the promoter reported it

| Main structure | 100% · planned by 29 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 92% · planned by 29 May 2026 | |
| Internal roads | Not verified yet | |
| Club house | 70% | |
| Completion | 99% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 21 Jun 2027 | |
| RERA completion date | 21 Jun 2027 | |
| Work began, as filed | 22 Jun 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: TOWER 1 86 m, Tower 2 85.65 m, Tower 3 85.65 m, Tower 4 85.65 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 199.76 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/331/2020 · issued 18 Feb 2021 | |
| Environmental clearance | SEIAA 95 CON 2020 · issued 13 Aug 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹341.93 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹254.60 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (1,028) 99.1%Unsold (9) 0.9%
| Sold, Q3 2025-26 | 1,028 / 1,037 · 9 available | |
|---|---|---|
| Sold, Q4 2025-26 | 1,027 / 1,037 · 10 available | |
| Sold, Q1 2026-27 | 1,028 / 1,037 · 9 available | |
| Sold, Q2 2026-27 | 1,028 / 1,037 · 9 available | |
| Unsold, Q2 2026-27 | 9 | |
| Sold in Q4 2025-26 | 1 booking cancelled or corrected (1,028 → 1,027 sold) | |
| Sold in Q1 2026-27 | 1 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · Majestic Branch | |
|---|---|---|
| Designated account, collected | ₹31.4 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹12.17 Cr in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 9 Mar 2021 | Review |
| Building plan (KIADB) | Sanctioned 24 May 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Majestic Branch | |

| Triaxis Splendour + | about 10 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| Riqueza Siri | about 11.5 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 16 km, KIA Terminal | |
| Kempegowda Airport | 31 | 16.5 |
| MG Road (CBD) | 39.5 | 34 |
| Manyata Tech Park | 39 | 28 |
| ITPL, Whitefield | 30 | 22.5 |
| Ecospace, Bellandur ORR | 40.5 | 31.5 |
| Electronic City Ph 1 | 54.5 | 40 |