Very nice Layout with good parks, walking space, and upcoming community centre along with swimming pool. Nice place invest and build home . It is better than most of the Villa projects.
Overview
Overview
Overview
Photo: Adithya Homes ParadiseVery nice Layout with good parks, walking space, and upcoming community centre along with swimming pool. Nice place invest and build home . It is better than most of the Villa projects.
Very nice project with all facilities and good connectivity to Sarjapur and whitefield areas, cooperative staff and nicely maintained
Proximity to Whitefield IT, Well Maintained with decent amenities like Childrens play area, club house, Swimming pools. Multiple Phases. Multiple Villa projects and Apartment projects in the surroundings. Multiple school options within 6km.…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| 1 Lakhmulti Storey Housing Chikanahalli KamnahaliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| Aashrayaa Eco CityApplied for completion 06/08/2020 | AASHRAYAA PROJECTS | Plot | – | Sep 2019 |
| Adithya Homes Grand Phase 2Completed (regulator flag) | M/s.ADITHYA HOMES | Plot | ~1,520 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Grand Phase 3Completed (regulator flag) | M/S.ADITHYA HOMES | Plot | ~1,400–1,990 sqft (estimate: filed carpet plus 25%) | Completed |
| Adithya Homes Paradise Phase 2Applied for completion 09/01/2024 | ADITHYAHOMES | Plot | – | May 2024 |
| Adithya Homes Paradise Phase-4 |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
131 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| ADITHYA HOMES |
| Plot |
| ~1,200–1,600 sqft (estimate: filed carpet plus 25%) |
| Jun 2026 |
| Adithya Paradise -5Active · 100% built | PARADISE HOMES | Plot | ~1,200–1,750 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
| Anthill SilverfieldsActive · 80% built | Anthill Projects LLP | Plot | ~1,200–2,320 sqft (estimate: filed carpet plus 25%) | Mar 2027 |
8 of 41 other projects in East Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Adithya Homes Paradise Phase-3 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Building plan (BMRDA) | Sanctioned 20 Aug 2022 · No. APA/LAO/34/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2023 |
| Land conversion | Converted 21 Apr 2022 · DC Bangalore City | |
|---|---|---|
| Survey numbers | 79/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 100 m from the filed location | Clear |
| Nearest government-flagged flood location | 4.4 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.3 km to the north-east, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 250 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2023 | |
| Work began, as filed | 20 Aug 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Engineer's certificate, registration | Dated 17 Sep 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹14.7 L 2.7%Development · ₹5.31 Cr 97.3%
| Estimated cost | ₹5.46 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹5.31 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold plots | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | UCO Bank · HSR LAYOUT | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 20 Aug 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | UCO Bank · HSR LAYOUT | |
| Projects within 4 km, counted | 25 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 5,136 | |
| Booked | 2,706 of 5,136 (53%) | |
| Unsold | 2,430 | |
| Booked a month, pooled | 112 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (NERIGE GRAMA PANCHYATH) | |
| Nearest city water main | 5.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.3 km to the north-east, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 7.6 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 45.4 | 46 | 31.5 |
| MG Road (CBD) | 23.9 | 28 | 20.7 |
| Manyata Tech Park | 28.0 | 33 | 22.3 |
| ITPL, Whitefield | 12.1 | 14 | 8.5 |
| Ecospace, Bellandur ORR | 14.7 | 20 | 11.4 |
| Electronic City Ph 1 | 25.9 | 32 | 15.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |