Possession, agreement31 Dec 2025Agreement for sale, p. 11
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
Sold19 / 33At the completion filing, 18 Aug 2025
Sold in the latest quarterCompleted
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed118On K-RERA
Available10387% of filed
K-RERA only15
Approvals with a validity dateNone read
Approvals & NOCs
Available
Available
2 pagesAvailable
2 pagesAvailable
2 pagesAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
2 pagesAvailable
Filed 30 Sep 20222 pagesAvailable
3 pagesAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. The village name is shared by several villages; the one nearest the filed coordinate was used.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Encore In The Shire in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Land · ₹2.50 Cr 12.9%Development · ₹16.95 Cr 87.1%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹19.45 Cr
Estimated cost, architect's and engineer's certificates
₹13.87 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold, at completion
Sold (19) 57.6%Unsold (14) 42.4%
Flats sold per quarter
Completed
K-RERA inventory
Flats sold, at completion
19
Flats unsold, at completion
14
Flats in the phase
33
Compliance
Escrow
Completed
Escrow and filings
Escrow bank
Axis Bank · JP Nagar Branch
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
0
Track record
Average schedule slip
Not verified yet
DOSL builder track
Not verified yet
Developer's project loan
No borrowing declared
Records searched to
Not verified yet
Building plan
Sanctioned 27 Sep 2019
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
Axis Bank · JP Nagar Branch
Stage
Certified progress
Completed
Basemap: Esri, OpenStreetMap contributors
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sowparnika Euphoria in the East, price locked; Sowparnika Rhythm of Rain, price locked; Sowparnika Ashiyana Phase II, price locked.
This project
Padlock: that project's price is part of its own report
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
Water at a glance
Groundwater
Hosakote taluk average, July 2023: 22.6 m below ground
What it means
Not verified yet
Water below ground
22.6 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority (Samethena Halli Gramapanchyath)
Nearest city water main
2.1 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.