Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | ||||
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: M/s DRK PROJECTS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| – |
| 1 |
| 2 |
| Review |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Drk Bellagio in the interactive atlas
Transfer of the land
Sale deed
Survey 133/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 131/7
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Conversion Bangalore · Survey 131/7
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bangalore · Survey 133/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO Kithaganur · Survey 131/7, 133/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO Kithaganur · Survey 131/7, 133/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TP/EM/EO-2/TA-3/North/016/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/200225/007518
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 18 Oct 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched part of the survey number | 14,941 sq m | |
| The whole survey number on the KGIS map | 66,449 sq m | |
| Extent the filed land schedule names for these survey numbers | 12,646 sq m | |
| Plot area against the filed extent | 1.18 times | |
| Land area filed with K-RERA | 12,646 sq m | |
| Village, hobli and taluk on the KGIS map | Kitthaganur, Bidarahalli-2 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 131/7, 133/4 | |
|---|---|---|
| Land extent, Sy 131/7 | (01Acre, 00Gunta / 4046.82Sq Mtr)* | |
| Land extent, Sy 133/4 | (02Acre, 05Gunta / 8599.50Sq Mtr)* | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 12,646 sq m | |
| Khata | E Khatha · PDO Kithaganur · 20 Nov 2023 | |
| Sale deed | Dated 13 Aug 2004, 21 Aug 2008 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 131/7 | 3 | 1 acre 9 guntas | 1 acre | Differs: 20 guntas apart | 0 | |
| Sy. No. 133/4 | 1 | 2 acres 5 guntas | 2 acres 5 guntas | Yes | 0 |
| Building plan (BDA) | Sanctioned 24 Oct 2024 · No. BDA/TP/EM/EO-2/TA-3/North/016/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2028 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 131/7 | Converted 9 Nov 2011 · DC Conversion Bangalore | |
| Sy 133/4 | Converted 9 Nov 2011 · DC Office Bangalore | |
| Survey numbers | 131/7 · 133/4 |
Row houses · avg 210 m² 60.5%Villaments · avg 188 m² 39.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Row houses | 46 | 2,261 |
| Villaments | 30 | 2,019 |
| Sold, Q2 2026-27 | 7 / 76 | |
|---|---|---|
| Unsold, Q2 2026-27 | 69 | |
| Months to sell, derived from filed bookings | 124 months |
| Assetz Sun & Sanctum - Phase 2 | about 2 km | Locked | |
|---|---|---|---|
| Legacy Saviero | about 4.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 4.5 km | Locked | |
| Vkk Grand | 4.8 km | Locked | |
| Nava Skanda Bellavita |
| Drk Bellagio This project | This project is the point the others are measured from | 30 Jun 2028 | 9% (7 of 76) | Not verified yet |
|---|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 2 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Legacy Saviero | about 4.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
Map of the ground within about 1.4 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 170 m from the filed location | Clear |
| Nearest government-flagged flood location | 1.9 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 560 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 310 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.09 (159 covered spaces for 76 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 16% · planned by 31 Mar 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 May 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 8% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Jun 2028 | |
| RERA completion date | 30 Jun 2028 | |
| Work began, as filed | 10 Dec 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: WING-VILLA 14.99 m, WING-HOUSES 10 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 13 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹70.70 Cr 42.4%Development · ₹96.23 Cr 57.6%
| Estimated cost | ₹166.93 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q1 2026-27 | ₹126.93 Cr | |
| Cost incurred | ₹58.13 Cr | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (7) 9.2%Unsold (69) 90.8%
| Sold, Q3 2025-26 | 2 / 76 · 74 available | |
|---|---|---|
| Sold, Q4 2025-26 | 5 / 76 · 71 available | |
| Sold, Q1 2026-27 | 7 / 76 · 69 available | |
| Sold, Q2 2026-27 | 7 / 76 · 69 available | |
| Unsold, Q2 2026-27 | 69 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 7 |
| Escrow bank | STATE BANK OF INDIA · Mysore Bank Circle Bengaluru | |
|---|---|---|
| Designated account, collected | ₹3.28 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.79 Cr in Q2 2026-27 (55% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹28,77,92,572 | |
| Net amount withdrawable, Form 4 | ₹25,90,01,614 | |
| Escrow account, Q1 2026-27 | Opened at ₹62.7 L, ₹1.34 Cr withdrawn | |
| Escrow account to date, Q1 2026-27 | ₹4.80 Cr deposited from sales, ₹2.88 Cr withdrawn | |
| Share of collections deposited in escrow | 68.94% | |
| Sale proceeds realised, Q1 2026-27 | ₹3,81,50,553 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 18 Oct 2023 | Review |
| Building plan (BDA) | Sanctioned 24 Oct 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Mysore Bank Circle Bengaluru | |

| about 5 km |
| Locked |
| 2g Tula | 5.1 km | Locked |
|---|
| Chaithanya Sankhya | about 5 km | Locked |
|---|
| The Pearl Paradise | 5.2 km | Locked |
|---|
| Garuda Grand | 5.3 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | 5.4 km | Locked |
|---|
| Sattva Songbird | 5.5 km | Locked |
|---|
| Radiance Floresta | about 6 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 |
|---|
| about 4.5 km |
| 31 Dec 2027 |
| 93% (280 of 300) |
| Locked |
| Vkk Grand | 4.8 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Nava Skanda Bellavita | about 5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| 2g Tula | 5.1 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹48,540 /mo · 17 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹21,000 /mo · 39 listings | |
| Rent, 1BHK, 3 km | ₹10,375 /mo · 12 listings | |
| Rent per sq ft, 3 km | ₹23.0 /mo, as listed · 47 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 25 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 6,006 | |
| Booked | 3,926 of 6,006 (65%) | |
| Unsold | 2,080 | |
| Booked a month, pooled | 92 flats | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 1.4 km of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (PDO Kithaganur) | |
| Nearest city water main | 2.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 560 m to the north-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.9 km, Horamavu | |
| Kempegowda Airport | 29.9 | 33 | 17.6 |
| MG Road (CBD) | 16.7 | 21 | 12.8 |
| Manyata Tech Park | 11.6 | 17 | 8.5 |
| ITPL, Whitefield | 12.3 | 17 | 7.4 |
| Ecospace, Bellandur ORR | 18.6 | 28 | 13.0 |
| Electronic City Ph 1 | 32.6 | 40 | 22.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.1 km to the north-west, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |