Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 1,667 sqft carpet (as filed) |
| Sep 2019 |
| BloomfieldsActive · 85% built | Shravan Gupta | Plot | ~600–2,400 sqft (estimate: filed carpet plus 25%) | Apr 2029 |
| BlossomCompleted · OC 11-07-2024 | BRUHASPATI BUILDERS LLP | Apartment | 309 sqft carpet (as filed) | Completed |
8 of 101 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Cm 1 Lakh Multi Storey Bengaluru Housing Programme Devegere Sy No 67 in the interactive atlas
Approval or registration
Khata issued
E Khatha · Government of Karnataka · Survey 67
K-RERA filing, land schedule
Approval or registration
Land use converted
Government of Karnataka · Survey 67
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan 1
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/050822/005132
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 67 | |
|---|---|---|
| Land extent, Sy 67 | 1 Acre 20 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,787 sq m | |
| Khata | E Khatha · Government of Karnataka · 24 Sep 2018 | |
| Building plan (BDA) | Sanctioned 26 Feb 2021 · No. 1 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2023 |
| Land conversion | Converted 4 May 2020 · Government of Karnataka | |
|---|---|---|
| Survey numbers | 67 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
1BHK · avg 30 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 140 | 324 |
| Good Earth Cadence | about 4 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | about 4.5 km | Locked | |
| Samaya Sunshine | about 8.5 km | Locked | |
| Axis Amarissa | about 9.5 km | Locked | |
| Harivishram | about 9.5 km | Locked |
| Cm 1 Lakh Multi Storey Bengaluru Housing Programme Devegere Sy No 67 This project | This project is the point the others are measured from | 31 Mar 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | about 4 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | about 4.5 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6.5 km, Kengeri Yellamma temple | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Vrishabhavati, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.00 (0 covered spaces for 140 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Grama Panchayath) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 20 Feb 2023 | |
| RERA completion date | 31 Mar 2023 | Red flag |
| Work began, as filed | 2 Jan 2021 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | All walls: 160 mm | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 12.6 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Concealed wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Power backup for lifts, pumps, common area lighting | |
| Sewage plant | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.1 L 0.4%Development · ₹13.67 Cr 99.6%
| Estimated cost | ₹13.73 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Canara Bank · BANGALORE SPLSD GOVT BUSINESS BRANCH 6349 | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 23 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 23 | Review |
| Complaints filed against the promoter | 4 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 26 Feb 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank · BANGALORE SPLSD GOVT BUSINESS BRANCH 6349 | |
| Sattva Springs | about 10.5 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 10.5 km | Locked |
|---|
| Sumadhura Pramoda | about 11 km | Locked |
|---|
| Samaya Sunshine |
|---|
| about 8.5 km |
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Axis Amarissa | about 9.5 km | 31 Dec 2029 | 28% (23 of 81) | Locked |
|---|
| Harivishram | about 9.5 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
|---|
| Sattva Springs | about 10.5 km | 18 Sep 2027 | 38% (25 of 66) | Locked |
|---|
| Projects within 4 km, counted | 7 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 2,272 | |
| Booked | 1,294 of 2,272 (57%) | |
| Unsold | 978 | |
| Booked a month, pooled | 22 flats | |
| Months to sell, pooled | 44 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Vrishabhavati, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 5 km, Challaghatta | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 57 | 47.5 |
| MG Road (CBD) | 24.5 | 22 |
| Manyata Tech Park | 34.5 | 28.5 |
| ITPL, Whitefield | 41.5 | 35.5 |
| Ecospace, Bellandur ORR | 38 | 27.5 |
| Electronic City Ph 1 | 35 | 26.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km, named Kumbalagodu on OpenStreetMap |
|---|