Building plan (Local Planning Authority)Sanctioned 12 Jul 2024No. APA/CC/57/2024-25 and APA/CC/279/2024-25
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints1×Red flagRed flag
Land conversionConverted, 19 of 19 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land5 cases
Cases on the builder224 cases
RERA complaints1 case
Builder's other projects89 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Forfeiture, agreementNot verified yet
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Not verified yet
Payments
Payment plan
Not verified yet
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Location & risks
What is the location like?
Review2 to review
Height above nearest drainNot verified yet
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedOtherDeclared by the promoter
Metro, operational2.1 kmBommasandra
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion46%As of Q2 2026-27, promoter's return
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
Sold727 / 1,016As of Q2 2026-27
Sold in Q2 2026-275!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed333On K-RERA
Available333100% of filed
K-RERA only0
Approvals with a validity date1Valid today
Approvals & NOCs
What we read
Fire NOCIssued 26 Feb 2024Filed as Fire Force Department, p. 41
Airport height NOCValid until 12 Aug 2029Filed as Airport Authority of India, p. 1
Environmental clearanceIssued 4 Sep 2020Filed as SEIAA, p. 3
Available
Available
Available
Available
Available
Available
Available
2 factsAvailable
1 factAvailable
Available
2 factsAvailable
Available
Available
Available
Available
Available
Available
Available
Filed 29 Aug 2024Available
Source: K-RERA project page and the documents filed there, as read by us. 85 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Land · ₹398.42 Cr 34.2%Development · ₹767.04 Cr 65.8%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹1165.46 Cr
Estimated cost, engineer's certificate
₹767.04 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold, Q2 2026-27
Sold (727) 71.6%Unsold (289) 28.4%
Flats sold per quarter
K-RERA inventory
Sold, Q3 2025-26
698 / 1,016 · 318 available
Sold, Q4 2025-26
714 / 1,016 · 302 available
Sold, Q1 2026-27
722 / 1,016 · 294 available
Sold, Q2 2026-27
727 / 1,016 · 289 available
Unsold, Q2 2026-27
289
Sold in Q4 2025-26
16
Sold in Q1 2026-27
8
Sold in Q2 2026-27
5
Flats booked, Form 4 Q1 2026-27
714
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
KOTAK MAHINDRA BANK · MG Road, Branch
Designated account, collected
₹128.37 Cr in Q2 2026-27
Designated account, withdrawn
₹61.43 Cr in Q2 2026-27 (48% of that quarter's deposits)
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
1
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
36
Marked completed
13
Past promised date, not completed
8
Revoked or withdrawn
1
Complaints filed against the promoter
44
Other phases under this promoter name
31
With a filed extension or completion
13 (11 completed, 2 extended)
Average schedule slip
19 months
Developer's project loan
No borrowing declared
Records searched to
Not verified yet
Building plan
Sanctioned 12 Jul 2024
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
KOTAK MAHINDRA BANK · MG Road, Branch
Stage
Progress as reported, by quarter
Site photos, Q2 2026-27
Basemap: Esri, OpenStreetMap contributors
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Abhee Serenity Springs, price locked; Shriram Sapphire (Codename Ultimate), price locked; Vasuki Vallabha, price locked.
This project
Padlock: that project's price is part of its own report
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
Water at a glance
Groundwater
Anekal taluk average, July 2023: 21.3 m below ground
What it means
Not verified yet
Water below ground
21.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Other
Nearest city water main
4.9 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.