| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ankuraa Meridian in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 78
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 85, 86/P1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 85, 86/P1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Ankuraa Developers · Survey 78
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Ankuraa Developers · Survey 85, 86/P1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Ankuraa Developers · Survey 85, 86/P1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 85, 86/P1, 78
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 85, 86/P1, 78
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 85, 86/P1, 78
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0100/ 22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/151223/006488
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 6 Dec 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: conversion sketch 85 86, 2 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 85, 86/P1, 78 | |
|---|---|---|
| Land extent, Sy 85 | 2 Acres 6 Guntas | |
| Land extent, Sy 86/P1 | 1 Acre 24 Guntas | |
| Land extent, Sy 78 | 0.07.08 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 16,035 sq m | |
| Khata | A Khatha · BBMP · 12 Oct 2022 | |
| Sale deed | Dated 12 Mar 2022, 14 Mar 2022 | |
| Sale deed in favour of | Ankuraa Developers | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 30 Sep 2023 · No. BBMP/Addl.Dir/JDNORTH/0100/ 22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/169/2023 · issued 11 Jul 2023 | Clear |
| Environmental clearance | SEIAA 70 CON 2023 · EC identification no. EC23B038KA165815 · issued 1 Jun 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-337996 · issued 6 Jun 2023 · valid until 5 Jun 2028 | Clear |
| Water and sewerage NOC (BWSSB) | issued 1 Jun 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2027 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 85, 86/P1 | Converted 15 Jun 2009 · DC Bengaluru | |
| Sy 78 | Converted 21 May 2009 · DC Bengaluru | |
| Survey numbers | 85 · 86/P1 · 78 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2.5BHK · avg 89 m² 40%3BHK · avg 104 m² 32%2BHK · avg 76 m² 24%1BHK 4%
| 1BHK | 12 | 6,157 |
| 2BHK | 72 | 59,126 |
| 2.5BHK | 120 | 1,14,765 |
| 3BHK | 96 | 1,07,865 |
| Sold, Q2 2026-27 | 287 / 338 | |
|---|---|---|
| Unsold, Q2 2026-27 | 51 | |
| Months to sell, derived from filed bookings | 12 months |
| Godrej Splendour Phase II | about 0.5 km | Locked | |
|---|---|---|---|
| Godrej Splendour | about 0.5 km | Locked | |
| Nirmaanika Aria | about 1 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 1.5 km | Locked | |
| Garuda Grand |
| Ankuraa Meridian This project | This project is the point the others are measured from | 30 Jun 2027 | 85% (287 of 338) | Not verified yet |
|---|---|---|---|---|
| Godrej Splendour Phase II | about 0.5 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
| Godrej Splendour | about 0.5 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, SAI BABA ASHRAM KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 50% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Air Conditioning And incerntion, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.26 (378 covered spaces for 300 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported it

| Main structure | 100% · planned by 30 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 60% · planned by 30 Jun 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 93% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Jul 2026 | |
| RERA completion date | 30 Jun 2027 | |
| Completion date, agreement | 30 Jun 2027 | |
| Work began, as filed | 1 Oct 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/169/2023 · issued 11 Jul 2023 | |
| Environmental clearance | SEIAA 70 CON 2023 · EC identification no. EC23B038KA165815 · issued 1 Jun 2023 | |
| Architect, quarterly | Form 5 · Mar 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹46.51 Cr 16.4%Development · ₹237.36 Cr 83.6%
| Estimated cost | ₹283.87 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹10.90 Cr | |
| Land cost revision | Not verified yet | |
Sold (287) 84.9%Unsold (51) 15.1%
| Sold, Q3 2025-26 | 249 / 338 · 89 available | |
|---|---|---|
| Sold, Q4 2025-26 | 271 / 338 · 67 available | |
| Sold, Q1 2026-27 | 271 / 338 · 67 available | |
| Sold, Q2 2026-27 | 287 / 338 · 51 available | |
| Unsold, Q2 2026-27 | 51 | |
| Sold in Q4 2025-26 | 22 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 16 |
| Escrow bank | HDFC · Bangalore IT Park | |
|---|---|---|
| Designated account, collected | ₹16.28 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹11.39 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹63,76,88,838 | |
| Escrow account, Q4 2025-26 | ₹17.23 Cr withdrawn | |
| Escrow account to date, Q4 2025-26 | ₹243.43 Cr deposited from sales, ₹240.54 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹1,27,53,77,675 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Dec 2023 | Review |
| Building plan (BBMP) | Sanctioned 30 Sep 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Bangalore IT Park | |

| about 3 km |
| Locked |
| Vintage Valley | about 3.5 km | Locked |
|---|
| Axis Ekatva | about 3.5 km | Locked |
|---|
| Vaswani Starlight | about 3.5 km | Locked |
|---|
| 2g Tula | about 4 km | Locked |
|---|
| Coevolve Misty Shores | about 4 km | Locked |
|---|
| Assetz 66 & Shibui | about 4 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 4 km | Locked |
|---|
| Nirmaanika Aria |
|---|
| about 1 km |
| 31 Dec 2027 |
| 32% (22 of 68) |
| Locked |
| Assetz Bloom & Dell - Phase 2 | about 1.5 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
|---|
| Garuda Grand | about 3 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
|---|
| Vintage Valley | about 3.5 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Projects within 4 km, counted | 57 (57 with an approximate location) | |
|---|---|---|
| Flats in them | 19,059 | |
| Booked | 11,158 of 19,059 (59%) | |
| Unsold | 7,901 | |
| Booked a month, pooled | 122 flats | |
| Months to sell, pooled | 61 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 33 | 21.5 |
| MG Road (CBD) | 19.5 | 16.5 |
| Manyata Tech Park | 19 | 14.5 |
| ITPL, Whitefield | 5.5 | 3 |
| Ecospace, Bellandur ORR | 16 | 12 |
| Electronic City Ph 1 | 30 | 20.5 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1.5 km |
|---|