Great design , spacious interiors, 6 ft distance between two villas. Just 10 mins drive from SH35/ varthur road. Along with those it’s perfectly priced. All these make this property a sensible buy.
Overview
Overview
Overview
Photo: Trendcon AureliusGreat design , spacious interiors, 6 ft distance between two villas. Just 10 mins drive from SH35/ varthur road. Along with those it’s perfectly priced. All these make this property a sensible buy.
Trendcon Aurelius is a promising premium villa project in Varthur with spacious triplex villas, good amenities and a well-planned layout featuring ample open spaces. The location offers decent connectivity to Whitefield and major IT hubs,…
I had a great experience with Trendcon Aurelius. The team was professional, transparent, and supportive throughout the entire process. The project is well planned, the construction quality is impressive, and the location is excellent. All…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
181 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Trendcon Aurelius in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 4 May 2023 · No. BDA/TPM/PRL-44/22-23/227/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-345201 · issued 25 Sep 2024 · valid until 24 Sep 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | Granted · Approved 4 Dec 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Oct 2026 |
| Land conversion | Converted 28 Dec 2022 · DC | |
|---|---|---|
| Survey numbers | Old Sy No. 2, New Sy No. 2/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Varthur police station | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
As the promoter reported itPossession date in the agreement

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Dec 2026 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Oct 2026 | |
| Work began, as filed | 1 Oct 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 14 Oct 2023 | |
| Chartered accountant's certificate, registration | Dated 19 Oct 2023 | |
Land · ₹22.34 Cr 23.9%Development · ₹71.30 Cr 76.1%
| Estimated cost | ₹93.64 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹46.98 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹75.91 Cr | |
| Cost incurred | ₹41.44 Cr | |
| Cost left | ₹34.47 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold plots | ₹12.96 Cr | |
| Land cost revision | Not verified yet | |
| Flats booked, Form 4 Q3 2025-26 | 42 |
|---|
| Escrow bank | Axis Bank · KADUGODI BNGR KT Branch | |
|---|---|---|
| Designated account, collected | ₹4.06 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹4.06 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹41,43,84,732 | |
| Net amount withdrawable, Form 4 | ₹8,94,09,007 | |
| Escrow account, Q3 2025-26 | Opened at ₹83.2 L | |
| Escrow account to date, Q4 2025-26 | ₹24.99 Cr deposited from sales, ₹21.46 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹32,49,75,725 | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 4 May 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · KADUGODI BNGR KT Branch | |

| Projects within 4 km, counted | 52 (52 with an approximate location) | |
|---|---|---|
| Flats in them | 20,330 | |
| Booked | 12,172 of 20,330 (60%) | |
| Unsold | 8,158 | |
| Booked a month, pooled | 351 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 6.5 km, Channasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 43 | 30.5 |
| MG Road (CBD) | 21.5 | 18.5 |
| Manyata Tech Park | 25.5 | 20.5 |
| ITPL, Whitefield | 10 | 7 |
| Ecospace, Bellandur ORR | 12.5 | 9 |
| Electronic City Ph 1 | 23.5 | 14 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 2 km |
|---|