Overview
Overview
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Kr Grand View HeightsCompleted · OC 02-03-2022 | K R Constructions | Mixed development | – | Completed |
| La VidaLapsed · completion date passed | UNISHIRE BUILDERS PRIVATE LIMITED | Apartment | – | Apr 2022 |
| Legacy SavieroExtended to 30-06-2027 | Chitrakut Estates Private Limited | Apartment | 994–1,256 sqft carpet (as filed) | Jun 2027 |
| Mashri PrajavaniLapsed · completion date passed | Mashri Buildtech LLP | Apartment | – | Mar 2022 |
| Nava Subha SamruddhiCompleted · OC 29-08-2023 | M/S NAVA JYOTHI SHELTERS PRIVATE LIMITED | Apartment | – | Completed |
| Nava Vaibhava ‘b’ And ‘c’ BlockCompleted · OC 10-12-2021 | NAVAJYOTHI CONSTRUCTIONS | Apartment | 844–1,072 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Nava Vaibhava A BlockCompleted · OC 26-11-2020 | M/S NAVAJYOTHI CONSTRUCTIONS REPRESENTED BY K MURALI BABU | Apartment | – | Completed |
| Needs 3 Project 168Active · 60% built | M/s. DS AND JAKS DEVELOPERS | Apartment | 788–1,048 sqft carpet (as filed) | Dec 2026 |
8 of 11 other projects in Central Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Sb Royal Enclave is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Legacy Saviero | about 0.5 km, to a locality centre | Locked | |
|---|---|---|---|
| Vkk Grand | about 2.5 km, to a locality centre | Locked | |
| SOBHA Victoria Park Phase 1 | about 3.5 km, to a locality centre | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km, to a locality centre | Locked |
| Sb Royal Enclave This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 0.5 km, to a locality centre | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | about 2.5 km, to a locality centre | 30 Jun 2027 | 49% (59 of 120) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, Horamavu | |
| Height above nearest drain | Not verified yet | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1.5 km from the locality centre, named Banaswadi Substation on OpenStreetMap |
| Nava Skanda Bellavita | about 4.5 km, to a locality centre | Locked |
|---|
| Brr North Excellency Phase I | about 5 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 5 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 5 km, to a locality centre | Locked |
|---|
| The Pearl Paradise | about 5 km, to a locality centre | Locked |
|---|
| Sumadhura Solea | about 6 km, to a locality centre | Locked |
|---|
| Sumadhura Epitome | about 6 km, to a locality centre | Locked |
|---|
| Sattva La Vita | about 6 km, to a locality centre | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 3.5 km, to a locality centre | 31 Dec 2027 | 93% (280 of 300) | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km, to a locality centre | 31 Jul 2026 | 100% (70 of 70) | Locked |
|---|
| Nava Skanda Bellavita | about 4.5 km, to a locality centre | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Brr North Excellency Phase I | about 5 km, to a locality centre | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|