Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 37 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Roaha Vivara in the interactive atlas
Approval or registration
Land use converted
District Commissioner, Bangalore · Survey 15/10, 15/12
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · NA · Survey 15/10, 15/12
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan 04/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/220626/008737
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 13 Apr 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey-Sketch, 1 page, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 15/10, 15/12 | |
|---|---|---|
| Land extent, Sy 15/10 | 20G | |
| Land extent, Sy 15/12 | 20G | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,173 sq m | |
| Khata | E Khatha · NA · 1 Mar 2026 | |
| Building plan (BDA) | Sanctioned 28 Apr 2026 · No. 04/2026-27 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2030 |
| Land conversion | Converted 4 Dec 2024 · District Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 15/10 · 15/12 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 104 m² 76.6%2BHK · avg 83 m² 23.4%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 15 | 892 |
| 3BHK | 49 | 1,117 |
| Sold, Q2 2026-27 | 2 / 64 | |
|---|---|---|
| Unsold, Q2 2026-27 | 62 | |
| Months to sell, derived from filed bookings | Too few bookings to project (2 flats booked in 3 months) |
| Roaha Vivara This project | This project is the point the others are measured from | 30 Jun 2030 | 3% (2 of 64) | Not verified yet |
|---|---|---|---|---|
| Satori Residence By Genurise | about 1 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (71 covered spaces for 64 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 16 Apr 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 24 Dec 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 5% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Jun 2030 | |
|---|---|---|
| Schedule end | 30 Jun 2030 | |
| RERA completion date | 30 Jun 2030 | |
| Work began, as filed | 1 Jul 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 24.98 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 16 May 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹16.10 Cr 29.3%Development · ₹38.82 Cr 70.7%
| Estimated cost | ₹54.92 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹35.54 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (2) 3.1%Unsold (62) 96.9%
| Sold, Q1 2026-27 | 0 / 64 · 64 available | |
|---|---|---|
| Sold, Q2 2026-27 | 2 / 64 · 62 available | |
| Unsold, Q2 2026-27 | 62 | |
| Sold in Q2 2026-27 | 2 |
| Escrow bank | IDFC FIRST BANK · KORAMANGALA | |
|---|---|---|
| Designated account, collected | ₹17.8 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹17.8 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 13 Apr 2026 | |
| Building plan (BDA) | Sanctioned 28 Apr 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | IDFC FIRST BANK · KORAMANGALA | |
| Mana Jardin Neo | about 1.5 km | Locked |
|---|
| Haven Phase 2 | about 1.5 km | Locked |
|---|
| 63 Degree East - Tower E | about 1.5 km | Locked |
|---|
| Adarsh Rosewood | about 2 km | Locked |
|---|
| Birla Evara | about 2 km | Locked |
|---|
| Orion Heights | about 2.5 km | Locked |
|---|
| Assetz Muse & Maison | about 3.5 km | Locked |
|---|
| Assetz Ren & Rei | about 3.5 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Mana Jardin Neo | about 1.5 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
|---|
| Haven Phase 2 | about 1.5 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
|---|
| Projects within 4 km, counted | 80 (80 with an approximate location) | |
|---|---|---|
| Flats in them | 22,463 | |
| Booked | 12,442 of 22,463 (55%) | |
| Unsold | 10,021 | |
| Booked a month, pooled | 289 flats | |
| Months to sell, pooled | 33 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Bellandur | |
| Kempegowda Airport | 50.5 | 33.5 |
| MG Road (CBD) | 16 | 13.5 |
| Manyata Tech Park | 23.5 | 18 |
| ITPL, Whitefield | 17.5 | 10.5 |
| Ecospace, Bellandur ORR | 6.5 | 3.5 |
| Electronic City Ph 1 | 11.5 | 7 |
| Landfill or waste transfer station | about 2.5 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |