Located on IVC road, at the moment it is far from the main road and city but this definitely looks like a good investment for the future The area is huge like any Prestige society
RRakesh Machatty17 Oct 2025★★★★★
I am impressed with the plotted development of Prestige Greenbrook on IVC Road. The area has seen significant growth and transformation in last 3 to 4 years, With excellent upcoming infrastructure. The plots are well-appointed, and the…
Ssumanth p14 Oct 2025★★★★★
I booked a unit in Prestige Green Brooks, but the entire experience has been extremely disappointing. The location is very far from the city, with no developments within a 10 km radius—it requires crossing villages and remote areas to…
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Greenbrook in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 220 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
Water at a glance
Groundwater
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
Not verified yet
Water below ground
19.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Borewell
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Road distance from the site
Nuisances
Distance from the filed pin
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km
As the promoter reported it
Site photos filed with K-RERA, Q2 2026-27
Work left
By component
Not verified yet
Quarterly return, Q2 2026-27
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
30%
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
Not verified yet
RERA completion date
31 Mar 2027
Completion date, agreement
31 Mar 2027
Work began, as filed
1 Oct 2025
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed)
✓Clear
Design consultants (Form 6)
Not verified yet
Fire safety
Not verified yet
Environmental clearance
Not verified yet
Chartered accountant's certificate, registration
Dated 13 Aug 2025
Chartered accountant, Form 4
Dated 13 Oct 2026
Structural safety certificate
Not verified yet
Land · ₹342.22 Cr 79.1%Development · ₹90.39 Cr 20.9%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹432.62 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold plots
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold
Not verified yet
Flats sold per quarter
Not verified yet
K-RERA inventory
Flats booked, Form 4 Q1 2026-27
264
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · Kasturba Road Bangalore
Designated account, collected
₹73.36 Cr in Q2 2026-27
Designated account, withdrawn
₹73.36 Cr in Q2 2026-27 (100% of that quarter's deposits)
Amount deposited in the quarter, Form 4
₹73,26,21,252
Share of collections deposited in escrow
70%
Sale proceeds realised, Q2 2026-27
₹1,04,66,01,789
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
0
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
52
Marked completed
29
Past promised date, not completed
8
Complaints filed against the promoter
77
Other phases under this promoter name
33
With a filed extension or completion
20 (18 completed, 2 extended)
Average schedule slip
2 months
Developer's project loan
No borrowing declared
Records searched to
Not verified yet
Building plan (BIAPPA)
Sanctioned 24 Apr 2025
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
HDFC · Kasturba Road Bangalore
Stage
Progress as reported, by quarter
Site photos, Q2 2026-27
K-RERA inventory
Projects within 4 km, counted
9 (9 with an approximate location)
Flats in them
4,543
Booked
3,758 of 4,543 (83%)
Unsold
785
Booked a month, pooled
127 flats
Months to sell, pooled
6 months
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Approximate location: the filed pin, good to the neighbourhood, not the plot