Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 63 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Valuation |
|---|
| – |
| – |
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Mana Dale is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BDA) | Sanctioned 10 Oct 2023 · No. BDA /EM/E01/TA-2/EAST/32/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | SEIAA 83 CON 2022 · EC identification no. EC22B038KA119944 · issued 28 Jul 2022 | Clear |
| Airport height NOC | NOC ID HOSU/SOUTH/B/060922/676582 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2032 |
| Land conversion | Converted 27 Jul 2016 · DC - BANGALORE | |
|---|---|---|
| Survey numbers | 60/1 |
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
3BHK- tower -1 · avg 96 m² 38.2%3BHK- tower -2 · avg 96 m² 37.3%4BHK- tower -2 · avg 126 m² 12.7%4BHK- tower -1 · avg 126 m² 11.8%
| 3BHK- tower -1 | 87 | 1,035 |
| 3BHK- tower -2 | 85 | 1,034 |
| 4BHK- tower -1 | 27 | 1,357 |
| 4BHK- tower -2 | 29 | 1,357 |
| Sold, Q2 2026-27 | 216 / 228 | |
|---|---|---|
| Unsold, Q2 2026-27 | 12 | |
| Months to sell, derived from filed bookings | 4 months |
| Mana Jardin Neo | about 0.5 km, to a locality centre | Locked | |
|---|---|---|---|
| 63 Degree East - Tower E | about 1 km, to a locality centre | Locked | |
| Orion Heights | about 1 km, to a locality centre | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km, to a locality centre | Locked |
| Mana Dale This project | This project is the point the others are measured from | 31 Dec 2032 | 95% (216 of 228) | Not verified yet |
|---|---|---|---|---|
| Mana Jardin Neo | about 0.5 km, to a locality centre | 30 Dec 2032 | 27% (22 of 82) | Locked |
| 63 Degree East - Tower E | about 1 km, to a locality centre | 31 Dec 2026 | 100% (399 of 399) | Locked |
| Nearest storm drain | about 2 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km from the locality centre, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 8% | |
| Electricity, built | 35% | |
| Outdoor Sports facility, built | 5% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 21% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 3.48 (793 covered spaces for 228 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Kodathi Panchayath) | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | None within 3 km of the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 0.5 km from the locality centre |
As the promoter reported itPossession date in the agreement

| Main structure | 55% · planned by 16 Apr 2029 | |
|---|---|---|
| Electrical and plumbing finishing | 14% · planned by 11 Nov 2032 | |
| Internal roads | Not verified yet | |
| Club house | 8% | |
| Completion | 70% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2032 | |
|---|---|---|
| Schedule end | 31 Dec 2032 | |
| RERA completion date | 31 Dec 2032 | |
| Work began, as filed | 1 Dec 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 87.15 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 42 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jun 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | SEIAA 83 CON 2022 · EC identification no. EC22B038KA119944 · issued 28 Jul 2022 | |
| Architect, quarterly | Form 5 · Feb 2026, Jun 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 19 Oct 2023 · site inspected 18 Oct 2023 | |
| Engineer's certificate, registration | Dated 19 Oct 2023 | |
| Chartered accountant's certificate, registration | Dated 19 Oct 2023 | |
Land · ₹24.00 Cr 8.4%Development · ₹263.00 Cr 91.6%
| Estimated cost | ₹287.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹225.00 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹268.60 Cr | |
| Cost incurred | ₹157.80 Cr | |
| Cost left | ₹110.80 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹124.54 Cr | |
| Land cost revision | Not verified yet | |
Sold (216) 94.7%Unsold (12) 5.3%
| Sold, Q3 2025-26 | 187 / 228 · 41 available | |
|---|---|---|
| Sold, Q4 2025-26 | 199 / 228 · 29 available | |
| Sold, Q1 2026-27 | 210 / 228 · 18 available | |
| Sold, Q2 2026-27 | 216 / 228 · 12 available | |
| Unsold, Q2 2026-27 | 12 | |
| Sold in Q4 2025-26 | 12 | |
| Sold in Q1 2026-27 | 11 | |
| Sold in Q2 2026-27 | 6 | |
| Flats booked, Form 4 Q1 2026-27 | 210 |
| Escrow bank | STATE BANK OF INDIA · IND.FIN.BR. BANGLORE | |
|---|---|---|
| Designated account, collected | ₹36.04 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹27.02 Cr in Q2 2026-27 (75% of that quarter's deposits) | |
| Escrow account, Q1 2026-27 | Opened at ₹1.07 Cr, ₹25.44 Cr withdrawn | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q1 2026-27 | ₹39,17,14,270 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 8 |
| Developer's project loan | Kotak Mahindra Invenstment Ltd · ₹75.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 10 Oct 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · IND.FIN.BR. BANGLORE | |

| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km, to a locality centre | Locked |
|---|
| Birla Evara | about 1.5 km, to a locality centre | Locked |
|---|
| Haven Phase 2 | about 2.5 km, to a locality centre | Locked |
|---|
| Satori Residence By Genurise | about 2.5 km, to a locality centre | Locked |
|---|
| Assetz Muse & Maison | about 3 km, to a locality centre | Locked |
|---|
| Assetz Ren & Rei | about 3 km, to a locality centre | Locked |
|---|
| Adarsh Rosewood | about 3.5 km, to a locality centre | Locked |
|---|
| Orion Heights | about 1 km, to a locality centre | 31 Dec 2025 | 65% (106 of 163) | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km, to a locality centre | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km, to a locality centre | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km, to a locality centre | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|