Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Bhavisha MeadowsLapsed · completion date passed | BHAVISHA PROPERTIES | Apartment | – | Mar 2023 |
| CelestaCompleted · OC 04-03-2023 | GLOBAL EDIFICE BUILDERS | Apartment | 370–724 sqft carpet (as filed) | Completed |
| Dhiraan Urban ForestCompleted · OC 18-04-2024 | DHIRAAN INFRASTRUCTURE PVT LTD | Apartment | 460–970 sqft carpet (as filed) | Completed |
| Fortuners Infra ElixirRegistered · no quarterly update yet | FORTUNERS INFRA | Apartment | 418–864 sqft carpet (as filed) | Sep 2026 |
| Green Apple HikesCompleted · OC 27-01-2021 | GLOBAL EDIFICE DEVELOPERS AND BUILDERS | Apartment | 872 sqft carpet (as filed) | Completed |
| Green VistaCompleted (regulator flag) | BEST PROPERTIES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
95 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| High Classic DelightCompleted (regulator flag) | M/s HIGH CLASSIC BUILDERS AND DEVELOPERS | Plot | ~1,130–1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| Jr Meadows Phase 3Completed (regulator flag) | JR Housing Developers Pvt Ltd | Plot | – | Completed |
8 of 18 other projects in Chandapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahendra Aarya in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/269/2020 · issued 17 Dec 2020 · building height 44.85 m | Clear |
| Environmental clearance | SEIAA 103 CON 2020 · issued 4 Sep 2020 | Clear |
| Airport height NOC | permissible top elevation 999 m above mean sea level | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 3 | |
| RERA completion date | 31 Dec 2025 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Runs to floor 14 · filing: 14 floors | |
| Late-payment interest | Not verified yet | |
| Transfer fee | ₹300 per sq ft | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Defect liability | 5 years | |
3 bhk 44.1%2 bhk 40%2.5 bhk 15.9%
| 2 bhk | 265 units · 7,578 sq ft carpet | |
|---|---|---|
| 2.5 bhk | 105 units | |
| 3 bhk | 292 units |
| Sold, Q3 2025-26 | 555 / 662 | |
|---|---|---|
| Unsold, Q3 2025-26 | 107 |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | A 66 kV line passes 70 m from the filed location: close enough that its corridor may cross the site | Review |
| Nearest government-flagged flood location | 9.9 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 390 m to the north, Lakshmisagara Kere | |
| Height above nearest drain | Not verified yet | |
| Club House, built | 100% | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Gas, built | 100% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |

| Main structure | 100% · planned by 15 Nov 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 15 Dec 2022 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Dec 2024 | |
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 15 Mar 2021 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.85 m on the fire NOC | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Aluminium windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles (600x600 mm) | |
| Toilet tiles | Anti-skid ceramic tiles (floor); Glazed tiles (walls) | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | 2BHK: 3 kVA; 3BHK: 5 kVA | |
| Power backup | 100% power backup for common areas; Power backup in flats: 1 kVA | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/269/2020 · issued 17 Dec 2020 · building height 44.85 m | |
| Environmental clearance | SEIAA 103 CON 2020 · issued 4 Sep 2020 | |
| Architect, quarterly | Form 5 · Mar 2026 | |
| Estimated cost | ₹2574.02 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (555) 83.8%Unsold (107) 16.2%
| Sold, Q3 2025-26 | 555 / 662 · 107 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 107 |
| Escrow bank | Karnataka Bank Ltd. · Basaveswar Nagar, Bangalore | |
|---|---|---|
| Designated account, collected | ₹25.57 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹26.11 Cr in Q3 2025-26 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 3 | |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Karnataka Bank Ltd. · Basaveswar Nagar, Bangalore |
|---|

Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Abhee Serenity Springs, price locked; Shriram Sapphire (Codename Ultimate), price locked; SOBHA Townpark, price locked.
| Signature Heights | about 1.5 km | Locked | |
|---|---|---|---|
| Abhee Serenity Springs | 2.9 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 3 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 3 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 3 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | 3.4 km | Locked | |
| SOBHA Townpark | 3.6 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 3.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 3.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 3.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 3.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 3.5 km | Locked |
| Mahendra Aarya This project | This project is the point the others are measured from | 31 Dec 2025 | 84% (555 of 662) | Not verified yet |
|---|---|---|---|---|
| Signature Heights | about 1.5 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
| Abhee Serenity Springs | 2.9 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 3 km | 30 Jun 2031 | 47% (230 of 492) | Locked |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 3 km | 31 Dec 2030 | 73% (348 of 480) | Locked |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 3 km | 31 Dec 2032 | 84% (540 of 640) | Locked |
| Shriram Sapphire (Codename Ultimate) | 3.4 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
| Rent, 2BHK, 3 km | ₹20,000 /mo · 7 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹7,500 /mo · 6 listings | |
| Rent per sq ft, 3 km | ₹18.3 /mo, as listed · 8 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 32 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 15,571 | |
| Booked | 5,997 of 15,571 (39%) | |
| Unsold | 9,574 | |
| Booked a month, pooled | 65 flats | |
| Months to sell, pooled | 148 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Self development | |
| Nearest city water main | 6.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 3.5 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 59.4 | 63 | 44.1 |
| MG Road (CBD) | 25.2 | 32 | 22.9 |
| Manyata Tech Park | 35.8 | 42 | 28.9 |
| ITPL, Whitefield | 28.9 | 32 | 20.6 |
| Ecospace, Bellandur ORR | 23.2 | 28 | 14.3 |
| Electronic City Ph 1 | 7.4 | 9 | 5.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 770 m to the south-west, named Chandapura on OpenStreetMap |