Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jai Kings Land in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner · Survey 55/2, 56/4
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 55/2, 56/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0014/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/170425/007675
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 7 Nov 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 39,064 sq m | |
| Land area filed with K-RERA | 17,401 sq m | |
| Village, hobli and taluk on the KGIS map | Sadaramangala, K R Pura-3 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 55/2 and 56/4 | |
|---|---|---|
| Land extent, Sy 55/2 and 56/4 | 4 ACRE 4.12 GUNTS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 17,401 sq m | |
| Khata | A Khatha · BBMP · 20 Jun 2024 | |
| Building plan (BBMP) | Sanctioned 10 Dec 2024 · No. BBMP/Addl.Dir/JDNORTH/0014/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/150/2024 · issued 24 Jun 2024 · building height 44.95 m | Clear |
| Environmental clearance | SEIAA 30 CON 2024 · EC identification no. EC24C3801KA5695774N · issued 8 Aug 2024 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 9 Dec 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 15 Dec 2028 |
| Land conversion | Converted 10 Oct 2023 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 55/2 and 56/4 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK and 3BHK · avg 92 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK and 3BHK | 378 | 989 |
| Garuda Grand | 770 m | Locked | |
|---|---|---|---|
| 2g Tula | 1.4 km | Locked | |
| Godrej Splendour | 2.0 km | Locked | |
| Vaswani Starlight | about 2 km | Locked |
| Jai Kings Land This project | This project is the point the others are measured from | 15 Dec 2028 | Not filed | Not verified yet |
|---|---|---|---|---|
| Garuda Grand | 770 m | 31 Mar 2028 | 41% (56 of 136) | Locked |
| 2g Tula | 1.4 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Godrej Splendour | 2.0 km | 20 Mar 2027 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Transport & communication, at the filed pin | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.5 km, Hoodi | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 90 m to the north-east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | Inside the mapped outline of Sadaramangala Lake | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (378 covered spaces for 378 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 15 Dec 2028 | |
| Work began, as filed | 19 Dec 2024 | |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m on the fire NOC · 44.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC or Wooden windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 39 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/150/2024 · issued 24 Jun 2024 · building height 44.95 m | |
| Environmental clearance | SEIAA 30 CON 2024 · EC identification no. EC24C3801KA5695774N · issued 8 Aug 2024 | |
| Architect's certificate, registration | Dated 14 Dec 2024 · site inspected 11 Dec 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹77.32 Cr 29.1%Development · ₹188.10 Cr 70.9%
| Estimated cost | ₹265.42 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹188.10 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · HDFC | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 7 Nov 2024 | |
| Building plan (BBMP) | Sanctioned 10 Dec 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · HDFC | |
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Garuda Grand, price locked; 2g Tula, price locked; Godrej Splendour, price locked; Assetz Bloom & Dell - Phase 2, price locked; Reflections 66, price locked.
| Godrej Splendour Phase II | about 2.5 km | Locked |
|---|
| Coevolve Misty Shores | about 2.5 km | Locked |
|---|
| Axis Ekatva | about 2.5 km | Locked |
|---|
| Nirmaanika Aria | about 3.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | 3.4 km | Locked |
|---|
| Assetz 66 & Shibui | about 3.5 km | Locked |
|---|
| Reflections 66 | 3.6 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked |
|---|
| 98% (1,135 of 1,161) |
| Locked |
| Vaswani Starlight | about 2 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Godrej Splendour Phase II | about 2.5 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
|---|
| Coevolve Misty Shores | about 2.5 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 9 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹64,800 /mo · 103 listings | |
| Rent, 2BHK, 3 km | ₹36,250 /mo · 134 listings | |
| Rent, 1BHK, 3 km | ₹16,500 /mo · 44 listings | |
| Rent per sq ft, 3 km | ₹34.9 /mo, as listed · 162 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 66 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 20,366 | |
| Booked | 13,325 of 20,366 (65%) | |
| Unsold | 7,041 | |
| Booked a month, pooled | 150 flats | |
| Months to sell, pooled | 44 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 1.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 90 m to the north-east, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.4 km, Pattandur Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 36.7 | 38 | 22.4 |
| MG Road (CBD) | 18.7 | 22 | 14.2 |
| Manyata Tech Park | 18.2 | 25 | 13.0 |
| ITPL, Whitefield | 7.9 | 12 | 1.6 |
| Ecospace, Bellandur ORR | 18.5 | 24 | 9.7 |
| Electronic City Ph 1 | 32.3 | 40 | 18.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.0 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 250 m to the south-west, named Hoody Traction on OpenStreetMap |