Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Airport CityLapsed · completion date passed | Srinivasa M | Plot | – | Dec 2021 |
| Arvind GreatlandsApplied for completion 16/12/2024 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 13 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Arvind SmartSpaces |
| Plot |
| 1,200–2,400 sqft |
| – |
| Assetz City Of PalmsActive · 86% built | ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED | Plot | ~1,200–2,020 sqft (estimate: filed carpet plus 25%) | Feb 2029 |
| Atmos SilverwoodsExtended to 31-05-2027 | ATMOS CONSTRUCTIONS PRIVATE LIMITED | Villa | 2,333 sqft carpet (as filed) | May 2027 |
| Canterburry MeadowsApplied for completion 10/05/2024 | ARUNAPANCHAMI ESTATES PRIVATE LIMITED | Plot | ~1,280 sqft (estimate: filed carpet plus 25%) | Mar 2020 |
| Canterbury HillviewApplied for completion 23/01/2023 | SLNS AVYUKTHA HOMES | Plot | – | Jul 2021 |
| Century GreensApplied for completion 12/07/2022 | Century Star | Plot | – | Dec 2021 |
| Century Greens Phase 2Applied for completion 07/04/2022 | CENTURY STAR | Plot | ~1,160–2,400 sqft (estimate: filed carpet plus 25%) | Dec 2021 |
8 of 32 other projects in Doddaballapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ferie Villas at Century Wintersun in the interactive atlas
Approval or registration
Land use converted
Spl. Dy.Commissioner, Bangalore · Survey 73/1, 79/1, 79/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 73/1, 79/1, 79/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Arakere Grama Panchayat · Survey 73/1, 79/1, 79/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan DPA/TP/LAO/31/2022-23/347
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/250723/006095
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 8 Jun 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched part of the survey number | 24,163 sq m | |
| The whole survey number on the KGIS map | 42,715 sq m | |
| Extent the filed land schedule names for these survey numbers | 25,090 sq m | |
| Plot area against the filed extent | 0.96 times | |
| Village, hobli and taluk on the KGIS map | Kadathanamale, Hesarughatta-2 hobli, Yelahanka taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 73/1, 79/1, 79/2 | |
|---|---|---|
| Land extent, Sy 73/1 | 1 Acre 20 Guntas | |
| Land extent, Sy 79/1 | 2 Acre 23 Guntas | |
| Land extent, Sy 79/2 | 2Acre 5Guntas (1Acre 2Guntas + 1Acre 3Gu | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Arakere Grama Panchayat · 16 May 2023 | |
| Sale deed | Dated 20 Apr 2010 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 73/1 | 2 | 1 acre 21 guntas | 1 acre 20 guntas | Yes | 0 | |
| Sy. No. 79/1 | 2 | 2 acres 23 guntas | 0 | |||
| Sy. No. 79/2 | 2 | 2 acres 5 guntas | 0 |
| Building plan (Local Planning Authority) | Sanctioned 3 Jun 2023 · No. DPA/TP/LAO/31/2022-23/347 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2026 |
| Land conversion | Converted 5 Nov 2007 · Spl. Dy.Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 73/1 · 79/1 · 79/2 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Assetz Miru & Miyo | about 8.5 km | Locked | |
|---|---|---|---|
| Riviera Glade | about 10 km | Locked | |
| Sattva City | 11.2 km | Locked | |
| Sattva Vasanta Skye | 11.9 km | Locked | |
| Godrej MSR City | 11.9 km | Locked |
| Ferie Villas at Century Wintersun This project | This project is the point the others are measured from | 30 Jun 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Assetz Miru & Miyo | about 8.5 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
| Riviera Glade | about 10 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
| Sattva City |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 13.8 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.2 km to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the south-east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2026 | |
| Work began, as filed | 1 Jul 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 9 Jun 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹27.60 Cr 69%Development · ₹12.40 Cr 31%
| Estimated cost | ₹40.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹12.40 Cr | |
| Estimated cost, chartered accountant's certificate | ₹40.00 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Cunningham Road, Bangalore | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 21 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 7 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 3 Jun 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Cunningham Road, Bangalore | |
| 11.2 km |
| 28 Feb 2032 |
| 17% (425 of 2,491) |
| Locked |
| Sattva Vasanta Skye | 11.9 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Godrej MSR City | 11.9 km | 31 Mar 2030 | 100% (1,957 of 1,961) | Locked |
|---|
| Projects within 4 km, counted | 7 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 1,416 | |
| Booked | 537 of 1,416 (38%) | |
| Unsold | 879 | |
| Booked a month, pooled | 30 flats | |
| Months to sell, pooled | 30 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Arakere Grama Panchayat, Hesarghatta Hobli, Yelahanka) | |
| Nearest city water main | 11.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.2 km to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 11.2 km, Doddajala | |
| Kempegowda Airport | 27.5 | 30 | 17.3 |
| MG Road (CBD) | 33.2 | 33 | 28.9 |
| Manyata Tech Park | 26.1 | 27 | 22.0 |
| ITPL, Whitefield | 43.1 | 48 | 33.9 |
| Ecospace, Bellandur ORR | 48.7 | 53 | 36.8 |
| Electronic City Ph 1 | 53.0 | 57 | 45.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 250 m to the south-west, named Substation on OpenStreetMap |