Building plan (BMRDA)Sanctioned 15 Dec 2021No. LAO 16/ 21-22
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints0✓ClearClear
Land conversionConverted, 6 of 6 parcelsDates and authorities below
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the landNo cases
Cases on the builder50 cases
RERA complaintsNo cases
Builder's other projects3 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer fee₹ ••,•••
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Review2 to review
Height above nearest drainNot verified yet
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedLocal authority (Muthanallur Panchayat)Declared by the promoter
Metro, operational5.9 kmBommasandra
Construction & progress
How is it being built, and when will it be ready?
CompletionCompleted
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Completed
Quarterly return
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldCompleted
Sold in the latest quarterCompleted
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed172On K-RERA
Available172100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
Available
Available
Available
1 pageAvailable
1 pageAvailable
Available
1 pageAvailable
Available
Available
Available
Available
Available
Available
Available
Available
Available
Available
Available
Filed 14 Mar 20221 pageAvailable
Filed 8 Apr 20221 pageAvailable
Filed 13 May 20221 pageAvailable
Filed 13 May 20223 pagesAvailable
Filed 13 May 20221 pageAvailable
6 pagesAvailable
1 pageAvailable
8 pagesAvailable
Available
1 pageAvailable
Available
Source: K-RERA project page and the documents filed there, as read by us. 19 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 5 of 6 filed survey numbers matched, 1 found no plot. The village name is shared by several villages; the one nearest the filed coordinate was used.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ellegenza Phase I Extension in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Building plan (BMRDA)
Sanctioned 15 Dec 2021 · No. LAO 16/ 21-22
Power NOC (BESCOM)
Filed with the registration
Fire department
Filed with the registration
SEIAA
Filed with the registration
AAI
Filed with the registration
KSPCB
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
31 Mar 2027
Registration certificates
PRM/KA/RERA/1251/308/PR/230522/004904
Land use
Conversion order
Land conversion
6 of 6 parcels converted
Sy 6/3
Converted 5 Aug 2021 · DC, Bangalore
Sy 12/1
Converted 4 Jun 2016 · DC, Bangalore
Sy 12/2, 12/3
Converted 5 Apr 2016 · DC Bangalore
Sy 13/2, 13/3
Converted 5 Aug 2021 · DC Bangalore
Survey numbers
6/3 · 12/1 · 12/2 · 12/3 · 13/2 · 13/3
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
Water at a glance
Groundwater
Anekal taluk average, July 2023: 21.3 m below ground
What it means
Not verified yet
Water below ground
21.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority (Muthanallur Panchayat)
Nearest city water main
5.8 km
!Review
Distances
Within 3 km
Connectivity
Road distance from the site
Nuisances
Distance from the site
None within 3 km
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km
Sewage treatment plant
None within 3 km
Quarry
None within 3 km
Crematorium
None within 3 km
Prison
None within 3 km
Electrical substation
None within 3 km
Completed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
Not verified yet
RERA completion date
31 Mar 2027
Work began, as filed
15 Dec 2021
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vistar White Pearl, price locked; Acorn Hive, price locked; Engrace 3, price locked; Engrace 4, price locked.
This project
Padlock: that project's price is part of its own report