Building plan (BDA)Sanctioned 16 May 2024No. BDA/TPM/PRL/28/2023-24/255/2024-25
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints0✓ClearClear
Land conversionConverted, 4 of 4 parcelsDates and authorities below
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land21 cases
Cases on the builderNo cases
RERA complaintsNo cases
Builder's other projectsNo cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer fee₹ ••,•••
Maintenance includedNot verified yet
Cancellation
Forfeiture
•• %
•• %
•• %
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Review2 to review · 1 clear
Height above nearest drainNot verified yet
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedBorewellDeclared by the promoter
Metro, operational6.2 kmHuskur Road
Construction & progress
How is it being built, and when will it be ready?
CompletionCompleted
Possession, agreement2 May 2028Agreement for sale, p. 14
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldCompleted
Sold in the latest quarterCompleted
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed189On K-RERA
Available17693% of filed
K-RERA only13
Approvals with a validity dateNone read
Approvals & NOCs
Available
Available
Available
Available
Available
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
Filed 6 Jul 20243 pagesAvailable
5 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Land · ₹12.66 Cr 64.6%Development · ₹6.92 Cr 35.4%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹19.58 Cr
Estimated cost, architect's and engineer's certificates
₹6.01 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold
Completed
Flats sold per quarter
Completed
K-RERA inventory
Completed
Compliance
Escrow
Completed
Escrow and filings
Escrow bank
IDFC FIRST BANK · K G Road Branch
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
0
Track record
Average schedule slip
Not verified yet
DOSL builder track
Not verified yet
Developer's project loan
No borrowing declared
Records searched to
Not verified yet
Building plan (BDA)
Sanctioned 16 May 2024
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
IDFC FIRST BANK · K G Road Branch
Stage
Certified progress
Completed
Basemap: Esri, OpenStreetMap contributors
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Acorn Hive, price locked; Vistar White Pearl, price locked; Engrace 3, price locked; Engrace 4, price locked; Birla Evara, price locked; Assetz Ren & Rei, price locked.
This project
Padlock: that project's price is part of its own report
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
Water at a glance
Groundwater
Anekal taluk average, July 2023: 21.3 m below ground
What it means
Not verified yet
Water below ground
21.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Borewell
Nearest city water main
4.7 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.