Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: VISHNU DHARANI PROPERTIES INDIA PRIVATE LIMITED
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 72 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Every finding in the report counts: clear 1, to review ½, red flag 0. Any red flag caps the DOSL Score at 59. A project needs 4 findings to be scored. The same rule for every project, with every section counted, so the DOSL Score is the same for every reader.
| – |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brunda Vihari in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner · Survey 39/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 39/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JD NORTH/0075/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/010125/007339
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 1 page, not in English.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 39/1 | |
|---|---|---|
| Land extent, Sy 39/1 | 1 ACRE 3 GUNTAS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,351 sq m | |
| Khata | A Khatha · BBMP · 15 Dec 2023 | |
| Building plan (BBMP) | Sanctioned 15 Oct 2024 · No. BBMP/Addl.Dir/JD NORTH/0075/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/430/2023 · issued 30 Apr 2024 | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-338991 · issued 14 Aug 2023 | |
| Water and sewerage NOC (BWSSB) | issued 6 Sep 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 15 Oct 2027 |
| Land conversion | Converted 6 Mar 2023 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 39/1 |
2 · avg 71 m² 43.3%2.5 · avg 80 m² 28.9%3BHK · avg 94 m² 27.8%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 | 42 | 760 |
| 2.5 | 28 | 861 |
| 3BHK | 27 | 1,012 |
| Sold, Q2 2026-27 | 32 / 97 | |
|---|---|---|
| Unsold, Q2 2026-27 | 65 | |
| Months to sell, derived from filed bookings | 53 months |
| Godrej Splendour | 740 m | Locked | |
|---|---|---|---|
| Godrej Splendour Phase II | about 1 km | Locked | |
| Nirmaanika Aria | about 2 km | Locked | |
| Garuda Grand | 2.1 km | Locked |
| Brunda Vihari This project | This project is the point the others are measured from | 15 Oct 2027 | 33% (32 of 97) | Not verified yet |
|---|---|---|---|---|
| Godrej Splendour | 740 m | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
| Godrej Splendour Phase II | about 1 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Transport & communication, at the filed pin | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.3 km, SAI BABA ASHRAM KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 90 m to the east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 50% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (97 covered spaces for 97 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 820 m | |
As the promoter reported it

| Main structure | 100% · planned by 15 Oct 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 50% · planned by 15 May 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 73% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 May 2027 | |
| RERA completion date | 15 Oct 2027 | |
| Work began, as filed | 15 Oct 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: BRUNDA VIHARI BLOCK B 20.99 m, BRUNDA VIHARI BLOCK A 21 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 20 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/430/2023 · issued 30 Apr 2024 | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Jul 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 28 Oct 2024 | |
| Engineer's certificate, registration | Dated 28 Nov 2024 | |
| Chartered accountant's certificate, registration | Dated 23 Dec 2024 | |
| Chartered accountant, Form 4 | Dated 15 Jul 2026 | |
Land · ₹14.79 Cr 27.1%Development · ₹39.77 Cr 72.9%
| Estimated cost | ₹54.56 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹39.77 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.65 Cr | |
| Land cost revision | Not verified yet | |
Sold (32) 33%Unsold (65) 67%
| Sold, Q3 2025-26 | 21 / 97 · 76 available | |
|---|---|---|
| Sold, Q4 2025-26 | 25 / 97 · 72 available | |
| Sold, Q1 2026-27 | 25 / 97 · 72 available | |
| Sold, Q2 2026-27 | 32 / 97 · 65 available | |
| Unsold, Q2 2026-27 | 65 | |
| Sold in Q4 2025-26 | 4 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 7 | |
| Flats booked, Form 4 Q4 2025-26 | 25 |
| Escrow bank | AU Small Finance Bank · HSR LAYOUT | |
|---|---|---|
| Designated account, collected | ₹5.16 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.18 Cr in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹30,29,99,478 | |
| Net amount withdrawable, Form 4 | ₹13,42,21,232 | |
| Escrow account, Q3 2025-26 | Opened at ₹10.5 L, ₹2.46 Cr withdrawn | |
| Escrow account to date, Q1 2026-27 | ₹0 deposited from sales, ₹16.90 Cr other deposits, ₹0 withdrawn, ₹16.88 Cr other withdrawals | |
| Escrow account to date, Q4 2025-26 | Balance ₹54.6 L | |
| Withdrawn from the escrow account to date | ₹16,87,78,246 | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | ||
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 15 Oct 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | AU Small Finance Bank · HSR LAYOUT | |

Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Godrej Splendour, price locked; Garuda Grand, price locked; Assetz Bloom & Dell - Phase 2, price locked; 2g Tula, price locked; Reflections 66, price locked.
| Axis Ekatva | about 2.5 km | Locked |
|---|
| Vaswani Starlight | about 2.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | 2.6 km | Locked |
|---|
| Coevolve Misty Shores | about 3 km | Locked |
|---|
| 2g Tula | 2.8 km | Locked |
|---|
| Assetz 66 & Shibui | about 3.5 km | Locked |
|---|
| Vintage Valley | about 3.5 km | Locked |
|---|
| Reflections 66 | 3.6 km | Locked |
|---|
| about 2 km |
| 31 Dec 2027 |
| 32% (22 of 68) |
| Locked |
| Garuda Grand | 2.1 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
|---|
| Axis Ekatva | about 2.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Vaswani Starlight | about 2.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹58,000 /mo · 78 listings | |
| Rent, 2BHK, 3 km | ₹34,750 /mo · 116 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 46 listings | |
| Rent per sq ft, 3 km | ₹33.3 /mo, as listed · 133 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 72 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 22,494 | |
| Booked | 13,525 of 22,494 (60%) | |
| Unsold | 8,969 | |
| Booked a month, pooled | 145 flats | |
| Months to sell, pooled | 58 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 90 m to the east, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.6 km, Pattandur Agrahara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 35.0 | 37 | 22.2 |
| MG Road (CBD) | 18.9 | 23 | 15.6 |
| Manyata Tech Park | 18.4 | 25 | 14.1 |
| ITPL, Whitefield | 6.7 | 10 | 1.9 |
| Ecospace, Bellandur ORR | 17.3 | 23 | 10.8 |
| Electronic City Ph 1 | 31.0 | 38 | 19.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.3 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 890 m to the south-east |