Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Survey plots, KGIS cadastral Road, stream, tank or settlement (not a plot) Filed site pinOther projects in Thanisandra, A to Z
8 of 72 other projects in Thanisandra, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aadya Serene in the interactive atlas
Boundaries Schedule in the EC vs KGIS neighbours Survey sketch Survey sketch filed with K-RERA No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map Ownership Joint development agreement RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/190614/002604 Renewed certificate EX/PRM/KA/RERA/1251/446/PR/251010/002604 ₹99 for this report opens Disputes & cases for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Aadya Serene's developer filed before you say yes.
× Aadya Serene
M/s. JUST NATURAL · Thanisandra Main Road, North Bengaluru
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Price per sq ft, super built-up Registered deeds Transactions in this project The area Price trend North Bengaluru, past year Not verified yet
Bengaluru, past year Not verified yet
North since 2022 Not verified yet
This project vs North Bengaluru Not verified yet
Price per sq ft, super built-up Registered sales around Registered sale price per sq ft, by year Transactions around this project Comparable projects Carpet price, projects within 4 km
Filed prices nearby 0% 50% 100% Q3 2025-26: 43% 43% Q3 2025-26 Q4 2025-26: 48% 48% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 55% 55% Q2 2026-27 0% 50% 100% Q3 2025-26: 43% 43% Q3 2025-26 Q4 2025-26: 48% 48% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 55% 55% Q2 2026-27
Work left By component, Q2 2026-27 Tower AADYA SERENE Tower AADYA SERENE: 48% 48% Earth work and other leveling pr… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Sub-structure flooring (Parking… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, San…
Dates Dates 2019 2022 2025 2028 Work began 6 Aug 2018 As of 29 Oct 2026 RERA deadline 24 Mar 2028 Builder's schedule ends 24 Mar 2028 Work began: 6 Aug 2018 As of 29 Oct 2026 RERA deadline: 24 Mar 2028 Builder's schedule ends: 24 Mar 2028
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Structural safety certificate Land · ₹6.43 Cr: 13% Development · ₹42.96 Cr: 87% ₹49.40 Cr estimated cost Land · ₹6.43 Cr 13% Development · ₹42.96 Cr 87%
Sales Sold vs unsold, Q2 2026-27 Unsold (140): 100% 0% 140 flats Unsold (140) 100%
Flats sold per quarter Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Compliance Escrow, Q2 2026-27 Paid in ₹0 Withdrawn ₹0
Paid in ₹0 Withdrawn ₹0
Paid in ₹0 Withdrawn ₹0
Paid in ₹0 Withdrawn ₹0
Developer's project loan Not verified yet
Records searched to 1 Aug 2025
Building plan Not verified yet
Unregistered agreements, over 10% paid Not verified yet
Sale deed in favour of Not verified yet
Escrow bank HDFC · Kukatpally
Stage Progress as reported, by quarter Q3 2025-26 Q3 2025-26: 43% built, as the promoter reported it 43% Q4 2025-26 Q4 2025-26: 48% built, as the promoter reported it 48% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27 Q2 2026-27: 55% built, as the promoter reported it 55%
Q3 2025-26 Q3 2025-26: 43% built, as the promoter reported it 43% Q4 2025-26 Q4 2025-26: 48% built, as the promoter reported it 48% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27
87 100 100 94 85 98 99 82 101 83 97 84 81 103 102 86 95 96 104 98 99 103 106 100 m Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The siteImagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Survey plots, KGIS cadastral Road, stream, tank or settlement (not a plot) Filed site pinThe RTC of each filed survey Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 36 listings 1BHK: median ₹15,000 /mo over 36 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo 2BHK · 82 listings 2BHK: median ₹29,750 /mo over 82 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹29,750 /mo 3BHK · 38 listings 3BHK: median ₹45,000 /mo over 38 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹45,000 /mo
1BHK · 36 listings 1BHK: median ₹15,000 /mo over 36 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo 2BHK · 82 listings 2BHK: median ₹29,750 /mo over 82 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹29,750 /mo 3BHK · 38 listings 3BHK: median ₹45,000 /mo over 38 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 5,058 unsold flats ÷ 169 booked a month across 64 projects 30 months Brr North Excellency Phase I Brr North Excellency Phase I, about 0.5 km: 70 unsold ÷ 13 booked in 9 months 49 months Sumadhura Solea Sumadhura Solea, 540 m: 201 unsold ÷ 32 booked in 6 months 38 months Sumadhura Epitome Sumadhura Epitome, 790 m: 110 unsold ÷ 59 booked in 9 months 17 months High Life Towers High Life Towers, about 1 km: 245 unsold ÷ 18 booked in 9 months 123 months SNN Estates Felicity SNN Estates Felicity, 1.2 km: 238 unsold ÷ 20 booked in 3 months 36 months Casagrand Regal
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
High-tension line, 765 and 400 kV Its corridor, to scale Buried cable Storm drain, smaller Government-flagged flood location The siteAround it Water Groundwater, Bengaluru East taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
0% 50% 100% Q3 2025-26: 43% 43% Q3 2025-26 Q4 2025-26: 48% 48% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 55% 55% Q2 2026-27 0% 50% 100% Q3 2025-26: 43% 43% Q3 2025-26 Q4 2025-26: 48% 48% Q4 2025-26 Q1 2026-27: 50% 50% Q1 2026-27 Q2 2026-27: 55% 55% Q2 2026-27 As the promoter reported it
Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 40% 40% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 10% 10% Internal and External work inc… Internal and External work including landscapes as per santioned drawings: 20% 20% Water Supply, external Water Supply, external: 5% 5% Water Supply, internal Water Supply, internal: 5% 5% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Tower AADYA SERENE Tower AADYA SERENE: 48% 48% Earth work and other leveling pre… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Sub-structure flooring (Parking F… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanit… Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 40% 40% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 10% 10% Internal and External work includ… Internal and External work including landscapes as per santioned drawings: 20%
Tower AADYA SERENE Tower AADYA SERENE: 48% 48% Earth work and other leveling pre… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Sub-structure flooring (Parking F… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanit… Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 40% 40% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 10% 10% Internal and External work includ… Internal and External work including landscapes as per santioned drawings: 20%
Tower AADYA SERENE Tower AADYA SERENE: 48% 48% Earth work and other leveling pre… Earth work and other leveling preparation work: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Sub-structure flooring (Parking F… Sub-structure flooring (Parking Floor, more than one floor below general ground level): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceil… Plastering inside, outside & Ceiling: 80% 80% Basic work of Water supply, Sanit… Basic work of Water supply, Sanitary and Electrification: 50% 50% Railing and Grill fixing Railing and Grill fixing: 40% 40% Electrification, Water supply and… Electrification, Water supply and Sanitary Finishing: 10% 10% Internal and External work includ… Internal and External work including landscapes as per santioned drawings: 20%
Quarterly return, Q2 2026-27 2019 2021 2023 2025 2027 Work began 6 Aug 2018 As of 29 Oct 2026 RERA deadline 24 Mar 2028 Builder's schedule ends 24 Mar 2028 Work began: 6 Aug 2018 As of 29 Oct 2026 RERA deadline: 24 Mar 2028 Builder's schedule ends: 24 Mar 2028
2019 2021 2023 2025 2027 Work began 6 Aug 2018 As of 29 Oct 2026 RERA deadline 24 Mar 2028 Builder's schedule ends 24 Mar 2028 Work began: 6 Aug 2018 As of 29 Oct 2026 RERA deadline: 24 Mar 2028 Builder's schedule ends: 24 Mar 2028
2019 2021 2023 2025 2027 Work began 6 Aug 2018 As of 29 Oct 2026 RERA deadline 24 Mar 2028 Builder's schedule ends 24 Mar 2028 Work began: 6 Aug 2018 As of 29 Oct 2026 RERA deadline: 24 Mar 2028 Builder's schedule ends: 24 Mar 2028
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Designated account, withdrawn
Unregistered agreements, over 10% paid Not verified yet
Q2 2026-27: 55% built, as the promoter reported it 55% Q3 2025-26 Q3 2025-26: 43% built, as the promoter reported it 43% Q4 2025-26 Q4 2025-26: 48% built, as the promoter reported it 48% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27 Q2 2026-27: 55% built, as the promoter reported it 55%
Q3 2025-26 Q3 2025-26: 43% built, as the promoter reported it 43% Q4 2025-26 Q4 2025-26: 48% built, as the promoter reported it 48% Q1 2026-27 Q1 2026-27: 50% built, as the promoter reported it 50% Q2 2026-27 Q2 2026-27: 55% built, as the promoter reported it 55%
A Block of Hebbal Low Laying areas of Chamundi nagar of Hebbal Sun Rise colony of Hebbal Richi's Garden HBR Layout Veerannapalya Veerannapalya drain near Manpho convention center Near Shani mahathma temple beside Hebbal Flyover Vaddera Palya (Railway track) Kariyannapalya outer ring road, near Varun motors Nanda gokula Kariyannapalya Bridge over flowed ORR Manyata tech park, MS Ramaiah north city To element mall From Esteem mall beside Dhobi Ghat to Yogesh nagar bridge Near Rachanahalli lake inlet Kempapura Mariyanna Palya Telecom layout, Ashwathnagar Vaddara palya, Near Hennur Bande SEETHAPPA LAYOUT NEAR RABINDRANATH TAGORE LAYOUT Govindapura, Nesar Nagavara 1 km 3 km 2 km Nagawara · 2.5 km 87 100 100 94 85 98 99 82 101 83 97 84 81 103 102 86 95 96 104 98 99 103 106 100 m 1 km 3 km 2 km Sumadhura Solea: the price is part of that project's own report Sumadhura Epitome: the price is part of that project's own report Lodha Mirabelle: the price is part of that project's own report Assetz Soho & Sky Phase 1b: the price is part of that project's own report Sattva La Vita: the price is part of that project's own report Vkk Grand: the price is part of that project's own report The Pearl Paradise: the price is part of that project's own report Basemap: Esri, OpenStreetMap contributors
Map of 8 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sumadhura Solea, price locked; Sumadhura Epitome, price locked; Lodha Mirabelle, price locked; Assetz Soho & Sky Phase 1b, price locked; Sattva La Vita, price locked; Vkk Grand, price locked; The Pearl Paradise, price locked; Assetz Soho & Sky, price locked.
This project Padlock: that project's price is part of its own report₹45,000 /mo 1BHK · 36 listings 1BHK: median ₹15,000 /mo over 36 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo 2BHK · 82 listings 2BHK: median ₹29,750 /mo over 82 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹29,750 /mo 3BHK · 38 listings 3BHK: median ₹45,000 /mo over 38 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹45,000 /mo
1BHK · 36 listings 1BHK: median ₹15,000 /mo over 36 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹15,000 /mo 2BHK · 82 listings 2BHK: median ₹29,750 /mo over 82 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹29,750 /mo 3BHK · 38 listings 3BHK: median ₹45,000 /mo over 38 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹45,000 /mo
Casagrand Regal, 1.3 km: 27 unsold ÷ 9 booked in 9 months 27 months Within 4 km, pooled 5,058 unsold flats ÷ 169 booked a month across 64 projects 30 months Brr North Excellency Phase I Brr North Excellency Phase I, about 0.5 km: 70 unsold ÷ 13 booked in 9 months 49 months Sumadhura Solea Sumadhura Solea, 540 m: 201 unsold ÷ 32 booked in 6 months 38 months Sumadhura Epitome Sumadhura Epitome, 790 m: 110 unsold ÷ 59 booked in 9 months 17 months High Life Towers High Life Towers, about 1 km: 245 unsold ÷ 18 booked in 9 months 123 months SNN Estates Felicity SNN Estates Felicity, 1.2 km: 238 unsold ÷ 20 booked in 3 months 36 months Casagrand Regal Casagrand Regal, 1.3 km: 27 unsold ÷ 9 booked in 9 months 27 months
Within 4 km, pooled 5,058 unsold flats ÷ 169 booked a month across 64 projects 30 months Brr North Excellency Phase I Brr North Excellency Phase I, about 0.5 km: 70 unsold ÷ 13 booked in 9 months 49 months Sumadhura Solea Sumadhura Solea, 540 m: 201 unsold ÷ 32 booked in 6 months 38 months Sumadhura Epitome Sumadhura Epitome, 790 m: 110 unsold ÷ 59 booked in 9 months 17 months High Life Towers High Life Towers, about 1 km: 245 unsold ÷ 18 booked in 9 months 123 months SNN Estates Felicity SNN Estates Felicity, 1.2 km: 238 unsold ÷ 20 booked in 3 months 36 months Casagrand Regal Casagrand Regal, 1.3 km: 27 unsold ÷ 9 booked in 9 months 27 months
Within 4 km, pooled 5,058 unsold flats ÷ 169 booked a month across 64 projects 30 months Brr North Excellency Phase I Brr North Excellency Phase I, about 0.5 km: 70 unsold ÷ 13 booked in 9 months 49 months Sumadhura Solea Sumadhura Solea, 540 m: 201 unsold ÷ 32 booked in 6 months 38 months Sumadhura Epitome Sumadhura Epitome, 790 m: 110 unsold ÷ 59 booked in 9 months 17 months High Life Towers High Life Towers, about 1 km: 245 unsold ÷ 18 booked in 9 months 123 months SNN Estates Felicity SNN Estates Felicity, 1.2 km: 238 unsold ÷ 20 booked in 3 months 36 months Casagrand Regal Casagrand Regal, 1.3 km: 27 unsold ÷ 9 booked in 9 months 27 months
Telecom layout, Ashwathnagar 500 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Lake or tank Storm drain, smaller Government-flagged flood location The site20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 24.4 km by road 24.4 km MG Road (CBD) MG Road (CBD): 13.2 km by road 13.2 km Manyata Tech Park Manyata Tech Park: 5.0 km by road 5.0 km ITPL, Whitefield ITPL, Whitefield: 21.1 km by road 21.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 25.9 km by road 25.9 km Electronic City Ph 1 Electronic City Ph 1: 34.7 km by road 34.7 km
Kempegowda Airport
Nuisances Distance from the site Electrical substation Electrical substation: 1.2 km 1.2 km Quarry Quarry: 2.0 km 2.0 km Sewage treatment plant Sewage treatment plant: 2.3 km, Sewage Treatment Plant 2.3 km
Electrical substation Electrical substation: 1.2 km 1.2 km Quarry Quarry: 2.0 km 2.0 km Sewage treatment plant Sewage treatment plant: 2.3 km, Sewage Treatment Plant 2.3 km
Electrical substation Electrical substation: 1.2 km 1.2 km
20% Water Supply, external Water Supply, external: 5% 5% Water Supply, internal Water Supply, internal: 5% 5% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started 20% Water Supply, external Water Supply, external: 5% 5% Water Supply, internal Water Supply, internal: 5% 5% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started 20% Water Supply, external Water Supply, external: 5% 5% Water Supply, internal Water Supply, internal: 5% 5% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Assetz Soho & Sky: the price is part of that project's own report Telecom layout, Ashwathnagar 500 m Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The siteKempegowda Airport: 24.4 km by road 24.4 km MG Road (CBD) MG Road (CBD): 13.2 km by road 13.2 km Manyata Tech Park Manyata Tech Park: 5.0 km by road 5.0 km ITPL, Whitefield ITPL, Whitefield: 21.1 km by road 21.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 25.9 km by road 25.9 km Electronic City Ph 1 Electronic City Ph 1: 34.7 km by road 34.7 km Kempegowda Airport Kempegowda Airport: 24.4 km by road 24.4 km MG Road (CBD) MG Road (CBD): 13.2 km by road 13.2 km Manyata Tech Park Manyata Tech Park: 5.0 km by road 5.0 km ITPL, Whitefield ITPL, Whitefield: 21.1 km by road 21.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 25.9 km by road 25.9 km Electronic City Ph 1 Electronic City Ph 1: 34.7 km by road 34.7 km
Kempegowda Airport Kempegowda Airport: 24.4 km by road 24.4 km MG Road (CBD) MG Road (CBD): 13.2 km by road 13.2 km Manyata Tech Park Manyata Tech Park: 5.0 km by road 5.0 km ITPL, Whitefield ITPL, Whitefield: 21.1 km by road 21.1 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 25.9 km by road 25.9 km Electronic City Ph 1 Electronic City Ph 1: 34.7 km by road 34.7 km
Six city anchors · OSRM, no traffic Quarry Quarry: 2.0 km 2.0 km Sewage treatment plant Sewage treatment plant: 2.3 km, Sewage Treatment Plant 2.3 km Electrical substation Electrical substation: 1.2 km 1.2 km Quarry Quarry: 2.0 km 2.0 km Sewage treatment plant Sewage treatment plant: 2.3 km, Sewage Treatment Plant 2.3 km
A Block of Hebbal Low Laying areas of Chamundi nagar of Hebbal Sun Rise colony of Hebbal Richi's Garden HBR Layout Veerannapalya Veerannapalya drain near Manpho convention center Near Shani mahathma temple beside Hebbal Flyover Vaddera Palya (Railway track) Kariyannapalya outer ring road, near Varun motors Nanda gokula Kariyannapalya Bridge over flowed ORR Manyata tech park, MS Ramaiah north city To element mall From Esteem mall beside Dhobi Ghat to Yogesh nagar bridge Near Rachanahalli lake inlet Kempapura Mariyanna Palya Telecom layout, Ashwathnagar Vaddara palya, Near Hennur Bande SEETHAPPA LAYOUT NEAR RABINDRANATH TAGORE LAYOUT Govindapura, Nesar Nagavara 1 km 3 km 2 km Nagawara · 2.5 km