Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 10 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open White Lakes in the interactive atlas
Transfer of the land
Sale deed
in favour of M S Vijayakumar & his minor Daughters · Survey 17/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M S Vijayakumar & his minor daughters · Survey 14/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC · Survey 17/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC · Survey 14/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan LAO/28/2022-23
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · 0 · Survey 14/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Rural development & panchayath raj Depar · Survey 17/1
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/050723/006042
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 7 May 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 17/1, 14/2 | |
|---|---|---|
| Land extent, Sy 17/1 | 4.01Acres | |
| Land extent, Sy 14/2 | 0.5.8.0 | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Rural development & panchayath raj Depar · 21 Apr 2023; E Khatha · 0 · 21 Apr 2023 | |
| Sale deed | Dated 8 Dec 2000, 18 Dec 2000 | |
| Sale deed in favour of | M S Vijayakumar & his minor Daughters, M S Vijayakumar & his minor daughters | |
| Building plan (BMRDA) | Sanctioned 28 Oct 2022 · No. LAO/28/2022-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | Granted · Approved 2 Jan 2026 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 May 2025 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 17/1 | Converted 3 Jan 2022 · DC | |
| Sy 14/2 | Converted 18 Aug 2022 · DC | |
| Survey numbers | 17/1 · 14/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Definer Upper Deck | about 2.5 km | Locked | |
|---|---|---|---|
| Chaithanya Sankhya | about 3 km | Locked | |
| Neighbourhood Tree Park | about 3.5 km | Locked | |
| Sattva Songbird | about 5.5 km | Locked | |
| Godrej Woodscapes | about 6 km |
| White Lakes This project | This project is the point the others are measured from | 30 May 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Definer Upper Deck | about 2.5 km | 31 Dec 2025 | 71% (78 of 110) | Locked |
| Chaithanya Sankhya | about 3 km | 30 Nov 2028 | 66% (29 of 44) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7 km, Richi's Garden | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (MANDUR PANCHAYATH) | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | 31 May 2024 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 May 2025 | |
| Work began, as filed | 1 Nov 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 8 May 2023 · site inspected 30 Apr 2023 | |
| Engineer's certificate, registration | Dated 5 May 2023 | |
| Chartered accountant's certificate, registration | Dated 5 May 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹8.80 Cr 73.1%Development · ₹3.24 Cr 26.9%
| Estimated cost | ₹12.04 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹2.47 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · Basavanagudi | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 7 May 2023 | Review |
| Building plan (BMRDA) | Sanctioned 28 Oct 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Basavanagudi | |
| Locked |
| Adarsh Pinecourt | about 6 km | Locked |
|---|
| Radiance Floresta | about 6 km | Locked |
|---|
| The Pearl Paradise | about 6.5 km | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 7 km | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 7 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 7 km | Locked |
|---|
| Nava Skanda Bellavita | about 7 km | Locked |
|---|
| Neighbourhood Tree Park |
|---|
| about 3.5 km |
| 31 Dec 2028 |
| 27% (25 of 93) |
| Locked |
| Sattva Songbird | about 5.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
|---|
| Godrej Woodscapes | about 6 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
|---|
| Adarsh Pinecourt | about 6 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| Projects within 4 km, counted | 12 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 2,096 | |
| Booked | 1,466 of 2,096 (70%) | |
| Unsold | 630 | |
| Booked a month, pooled | 12 flats | |
| Months to sell, pooled | 54 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 10.5 km, Horamavu | |
| Kempegowda Airport | 21 | 12 |
| MG Road (CBD) | 25.5 | 18 |
| Manyata Tech Park | 17.5 | 12 |
| ITPL, Whitefield | 19 | 12 |
| Ecospace, Bellandur ORR | 25 | 19 |
| Electronic City Ph 1 | 40.5 | 28.5 |
| Landfill or waste transfer station | about 0.5 km, named Mandur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km, named Manduru on OpenStreetMap |