Overview
Overview
Overview
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| A.R RuthviLapsed · completion date passed | G.RAVINDRAKUMAR & M.K.ASHOKA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
| A.R Ruthvi Phase 2Filed as completed · no completion certificate on record | T MANJUNATHA | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Feb 2024 |
| Ag Varaha ValleyApplied for completion 23/01/2026 | ABHISHEK . A | Plot | ~1,230–1,500 sqft (estimate: filed carpet plus 25%) | Aug 2025 |
| Arvind LakeviewActive · 90% built | Arvind Builders | Plot | ~1,200–4,000 sqft (estimate: filed carpet plus 25%) | Dec 2027 |
| Arvind Orchids |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified this for this project yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Arvind Builders |
| Plot |
| ~1,200–1,680 sqft (estimate: filed carpet plus 25%) |
| Dec 2023 |
| Ashwasurya LegacyRegistered · no quarterly update yet | M/s. Suryakalpa Ventures | Plot | ~1,200–2,220 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| B.T.G LayoutApplied for completion 11/03/2023 | SHARADAMMA | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Aug 2021 |
8 of 60 other projects in West Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sirimane Serenity Phase -2 in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Transport & communication, at the filed pin | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 13.9 km, Shambhavinagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 540 m to the west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.1 m
Across Nelamangala, the water table sat 27.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.1 m, and it recovered 7.7 m over the year.
| Groundwater | Nelamangala taluk average, July 2023: 27.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | 15.1 km | Review |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 12.5 km, Madavara | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 55.5 | 58 | 38.0 |
| MG Road (CBD) | 34.3 | 37 | 29.1 |
| Manyata Tech Park | 33.0 | 37 | 28.1 |
| ITPL, Whitefield | 48.9 | 54 | 42.1 |
| Ecospace, Bellandur ORR | 47.9 | 55 | 39.3 |
| Electronic City Ph 1 | 59.8 | 49 | 44.7 |
| Sewage treatment plant |
|---|
| None within 3 km |
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | 2.1 km to the east, named Nelamangala on OpenStreetMap |
|---|