Building plan (BBMP)Sanctioned 23 Aug 2023No. BBMP/CC/2296/23-24
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints0✓ClearClear
Land conversionConverted 10 Jun 2022DC Bengaluru
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the landNo cases
Cases on the builder1 case
RERA complaintsNo cases
Builder's other projects4 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Forfeiture, agreementThe booking amountAgreement for sale, p. 33
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Forfeiture is stated as "The booking amount", not a share of the price. See the table.
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Review1 to review
Height above nearest drainNot verified yet
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedBWSSBDeclared by the promoter
Metro, operationalabout 2 kmKadugodi
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion85%As of Q2 2026-27, promoter's return
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review · 1 clear
Receivable, sold flats₹74.31 CrAs of Q1 2026-27
Cost left₹74.35 CrAs of Q1 2026-27
Sold196 / 250As of Q2 2026-27
Sold in Q2 2026-271!ReviewReview
Funding
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed155On K-RERA
Available11373% of filed
K-RERA only42
Approvals with a validity dateNone read
Approvals & NOCs
What we read
Water and sewerage NOC (BWSSB)Issued 27 Mar 2023Filed as KWSSB/Water, p. 1
Fire NOCIssued 27 Dec 2022Filed as Fire Force Department, p. 1
Environmental clearanceIssued 25 Jan 2023Filed as MOEF NOC with fee paid receipt, p. 1
K-RERA only
Available
Available
3 pagesAvailable
5 pages1 factAvailable
K-RERA only
K-RERA only
45 pages2 factsAvailable
3 pagesAvailable
6 pagesAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
1 pageAvailable
16 pages3 factsAvailable
Filed 9 Sep 20232 pagesAvailable
Filed 9 Sep 20231 pageAvailable
Filed 9 Sep 20231 pageAvailable
Filed 9 Sep 20233 pagesAvailable
Filed 9 Sep 20232 pagesAvailable
Filed 9 Sep 20232 pagesAvailable
Filed 9 Sep 202341 pagesAvailable
Filed 9 Sep 20231 pageAvailable
Filed 9 Sep 20235 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 69 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Orchid Platinum in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Building plan (BBMP)
Sanctioned 23 Aug 2023 · No. BBMP/CC/2296/23-24
Power NOC (BESCOM)
Filed with the registration
Fire NOC
KSFES/NOC/498/2022 · issued 27 Dec 2022
✓Clear
Environmental clearance
SEIAA 150 CON 2022 · EC identification no. EC23B000KA130777 · issued 25 Jan 2023
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
Filed with the registration
Water and sewerage NOC (BWSSB)
issued 27 Mar 2023
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
31 Dec 2028
Registration certificates
PRM/KA/RERA/1251/446/PR/140923/006267
Land use
Conversion order
Land conversion
Converted 10 Jun 2022 · DC Bengaluru
Survey numbers
6/1A · 6/1B
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Forfeiture, agreement
The booking amount
Forfeiture, allotment letter
Not verified yet
Payments
Payment plan
Not verified yet
Agreement for sale
Due on signing
Not verified yet
Due within 15 days
Not verified yet
Each construction stage
Not verified yet
Floors in payment plan
Runs to floor 13 · filing: 13 floors
Late-payment interest
Not verified yet
Fees
Agreement for sale
Transfer fee
Not verified yet
Holding charge
Not verified yet
Maintenance included
Not verified yet
Defect liability
5 years
Not verified yet
Form 4 certified totals
Not verified yet
Unit sizes
3BHK A: carpet vs rest
Not verified yet
Unit mix filed
3BHK · avg 110 m² 92.8%4BHK · avg 141 m² 5.2%2BHK 2%
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Drains, lakes and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation
Club House, built
0%
!Review
Electricity, built
0%
Outdoor Sports facility, built
0%
Swimming Pool, built
0%
Power Backup, built
0%
Kitchen handover
Not verified yet
Covered parking per unit
1.11 (277 covered spaces for 250 units)
Sewage plant
Not verified yet
Power backup
Declared by the promoter
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot