Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 25 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nirmaanika Advaita in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru Urban District · Survey 44/6, 46/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ARO, WHITEFIELD · Survey 44/6, 46/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan MDP/0549/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/031022/005294
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | Survey No.44/6, Survey No. 46/3 (Old NO.46/2) | |
|---|---|---|
| Land extent, Sy Survey No.44/6 | 0-22 Guntas | |
| Land extent, Sy Survey No. 46/3 (Old NO.46/2) | 1 ACRE - 12 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,260 sq m | |
| Khata | A Khatha · ARO, WHITEFIELD · 30 Dec 2021 | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 9 May 2022 · No. MDP/0549/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order AW-348610 · issued 5 May 2025 · valid until 30 Sep 2034 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 27 Jul 2020 · Deputy Commissioner, Bengaluru Urban District | |
|---|---|---|
| Survey numbers | Survey No.44/6 · Survey No. 46/3 (Old NO.46/2) |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Flats of 2 BHK · avg 67 m² 79.3%Flats of 3 BHK · avg 82 m² 17.2%Flats of 1 BHK 3.4%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| Flats of 1 BHK | 4 | 1,507 |
| Flats of 2 BHK | 92 | 66,424 |
| Flats of 3 BHK | 20 | 17,556 |
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | Locked |
| Nirmaanika Advaita This project | This project is the point the others are measured from | 31 Dec 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Balagere | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (116 covered spaces for 116 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 1 Sep 2025 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 13 Apr 2025 | |
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 9 May 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.8 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 12 Jul 2022 · site inspected 19 May 2022 | |
| Engineer's certificate, registration | Dated 23 May 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹7.00 Cr 23.3%Development · ₹23.00 Cr 76.7%
| Estimated cost | ₹30.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹23.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (65) 56%Unsold (51) 44%
| Flats sold, at completion | 65 | |
|---|---|---|
| Flats unsold, at completion | 51 | |
| Flats in the phase | 116 |
| Escrow bank | STATE BANK OF INDIA · BANASWADI | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 9 May 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · BANASWADI | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 0.5 km | Locked |
|---|
| SOBHA Ayana | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 0.5 km | Locked |
|---|
| Adarsh Park Heights Phase-2 | about 1 km | Locked |
|---|
| SOBHA Neopolis | about 1.5 km | Locked |
|---|
| Poetry Of Earth | about 1.5 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | 31 Dec 2027 | 100% (142 of 142) | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 0.5 km | 30 Mar 2026 | 100% (237 of 237) | Locked |
|---|
| SOBHA Ayana | about 0.5 km | 31 Dec 2031 | 62% (426 of 683) | Locked |
|---|
| Projects within 4 km, counted | 84 (84 with an approximate location) | |
|---|---|---|
| Flats in them | 30,112 | |
| Booked | 18,198 of 30,112 (60%) | |
| Unsold | 11,914 | |
| Booked a month, pooled | 510 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Kodibeesanahalli | |
| Kempegowda Airport | 43 | 29.5 |
| MG Road (CBD) | 17.5 | 14.5 |
| Manyata Tech Park | 22 | 17 |
| ITPL, Whitefield | 9.5 | 5.5 |
| Ecospace, Bellandur ORR | 7 | 5.5 |
| Electronic City Ph 1 | 20.5 | 12 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |