Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 32 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Modern Spaces Felicity Engrace 2 in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 40/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru · Survey 39
K-RERA filing, land schedule
Transfer of the land
Title deed executed
No. ABL-1-04113-2021-22 · Book 1 · Consideration ₹2.51 Cr · Sy 39, Kada Agrahara village, Anekal taluk
Title deed filed with K-RERA, pp. 1, 10, 14, 20 · See it in Documents
Transfer of the land
Sale deed
Survey 40/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 39
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gramapanchyathi Kada Agrahara · Survey 39, 40/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gramapanchyathi Kada Agrahara · Survey 39, 40/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan APA/CC/613/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/220722/005097
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 18 May 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 39, 40/2 | |
|---|---|---|
| Land extent, Sy 39 | 2 Acres 17.08 Guntas | |
| Land extent, Sy 40/2 | 2 Acre 30.08 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 23,066 sq m | |
| Khata | E Khatha · Gramapanchyathi Kada Agrahara · 31 Jan 2022 | |
| Sale deed | Dated 18 Sep 2021, 20 Sep 2021 | |
Valid as of this reportValidity ended
| Building plan (BMRDA) | Sanctioned 3 Mar 2022 · No. APA/CC/613/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 132 CON 2021 · EC identification no. EC22B038KA163506 · issued 20 Jan 2022 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order W-347311 · issued 29 Jan 2025 · valid until 30 Jun 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2026 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 39 | Converted 12 Jul 2018 · DC Bengaluru | |
| Sy 40/2 | Converted 22 Oct 2008 · DC Bengaluru | |
| Survey numbers | 39 · 40/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 87 m² 50.6%3BHK · avg 112 m² 49.4%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 172 | 932 |
| 3BHK | 168 | 1,204 |
| Sold, Q3 2025-26 | 333 / 340 | |
|---|---|---|
| Unsold, Q3 2025-26 | 7 |
| Engrace Vista | about 0.5 km | Locked | |
|---|---|---|---|
| Engrace 4 | about 0.5 km | Locked | |
| Engrace 3 | about 0.5 km | Locked | |
| Suyug's Saffron | about 1.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 1.5 km | Locked |
| Modern Spaces Felicity Engrace 2 This project | This project is the point the others are measured from | 30 Jun 2026 | 98% (333 of 340) | Not verified yet |
|---|---|---|---|---|
| Engrace Vista | about 0.5 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
| Engrace 4 | about 0.5 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
| Engrace 3 | about 0.5 km | 1 Jun 2026 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.08 (366 covered spaces for 340 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Yamare Grama Panchayathi) | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |

| Main structure | 100% · planned by 30 May 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 30 Mar 2026 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Jun 2026 | |
|---|---|---|
| Schedule end | 30 May 2026 | |
| RERA completion date | 30 Jun 2026 | |
| Work began, as filed | 1 Jul 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed, 5 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 132 CON 2021 · EC identification no. EC22B038KA163506 · issued 20 Jan 2022 | |
| Architect, quarterly | Form 5 · Mar 2026 | |
| Architect's certificate, registration | Dated 14 Jun 2022 · site inspected 24 May 2022 | |
| Engineer's certificate, registration | Dated 14 Jun 2022 | |
| Chartered accountant's certificate, registration | Dated 29 Jun 2022 | |
Land · ₹20.81 Cr 13.2%Development · ₹136.50 Cr 86.8%
| Estimated cost | ₹157.31 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹132.50 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (333) 97.9%Unsold (7) 2.1%
| Sold, Q3 2025-26 | 333 / 340 · 7 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 7 |
| Escrow bank | FEDERAL BANK OF INDIA · Billapura | |
|---|---|---|
| Designated account, collected | ₹1.22 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹0 in Q3 2025-26 (0% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 18 May 2022 | Review |
| Building plan (BMRDA) | Sanctioned 3 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | FEDERAL BANK OF INDIA · Billapura | |

| Nambiar District 25 Phase 2 | about 2 km | Locked |
|---|
| Acorn Hive | about 3 km | Locked |
|---|
| Vistar White Pearl | about 3.5 km | Locked |
|---|
| Mahidhara Harmony | about 4.5 km | Locked |
|---|
| Sowparnika Olivia Nest | about 4.5 km | Locked |
|---|
| Coevolve Florenza | about 5 km | Locked |
|---|
| Leafy Avenue | about 5.5 km | Locked |
|---|
| 100% (76 of 76) |
| Locked |
| Suyug's Saffron | about 1.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 1.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
|---|
| Nambiar District 25 Phase 2 | about 2 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
|---|
| Projects within 4 km, counted | 56 (56 with an approximate location) | |
|---|---|---|
| Flats in them | 18,172 | |
| Booked | 10,192 of 18,172 (56%) | |
| Unsold | 7,980 | |
| Booked a month, pooled | 306 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 9 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 51 | 37.5 |
| MG Road (CBD) | 28 | 21.5 |
| Manyata Tech Park | 32 | 25.5 |
| ITPL, Whitefield | 17.5 | 14 |
| Ecospace, Bellandur ORR | 16.5 | 11 |
| Electronic City Ph 1 | 13.5 | 9.5 |