Overview
Overview
Overview
Taken 1 Jul 2026| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 57 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aaptha LandmarkLapsed · completion date passed | AAPTHA VENTURES | Apartment | – | Nov 2021 |
| Adarsh PinecourtLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | 382–1,141 sqft carpet (as filed) | Mar 2026 |
| Adarsh PinecourtWithdrawn | Nusrath Unisa | Apartment | – | Nov 2023 |
| Adarsh TranqvilleLapsed · completion date passed | Varin Infra Projects Private Limited | Apartment | – | Mar 2026 |
| Adarsh Wisteria Phase 1Lapsed · completion date passed | VARIN INFRA PROJECTS PRIVATE LIMITED | Apartment | – | Aug 2023 |
| AlanovilleCompleted (regulator flag) | Goyal Hariyana Realty | Apartment | 2,251 sqft carpet (as filed) | Completed |
| Amigo PalacioActive · 40% built | AMIGO SHELTERS PVT LTD | Apartment | 1,044–1,480 sqft carpet (as filed) | Mar 2028 |
| Amigo RegencyCompleted · OC 24-08-2021 | AMIGO SHELTERS PVT LTD | Apartment | – | Completed |
8 of 160 other projects in Hennur Road, A to Z. Status is taken from each project's own filing.
All 172 projects in Hennur Road → · Kolte-Patil Developers's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Kolte-Patil Lakeside24 in the interactive atlas
Approval or registration
Khata issued
E Khatha · RDPR (KANNUR, BANGALORE EAST TALUK) · Survey 33 (part)
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER BANGALORE DISTRICT · Survey 33 (part)
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA / Na. Ma/ A.Sa. / AA - 2 / Ta.Sa. - 3 / U / 4 /2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/060324/006667
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | AXIS BANK LIMITED · ₹143.75 Cr disbursed | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 33 (PART) | |
|---|---|---|
| Land extent, Sy 33 (PART) | 1 ACRE 34.22 GUNTAS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 6,816 sq m | |
| Khata | E Khatha · RDPR (KANNUR, BANGALORE EAST TALUK) · 15 Apr 2021 | |
| Sale deed | 14 Mar 2014 | |
| Sale deed in favour of | SYLVAN ACRES REALTY PRIVATE LIMITED | |
| Title deed | Executed 14 Mar 2014 · Sy 33 | |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 28 Apr 2023 · No. BDA / Na. Ma/ A.Sa. / AA - 2 / Ta.Sa. - 3 / U / 4 /2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/353/2022 · issued 6 Oct 2022 · building height 83.4 m | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-333810 · issued 13 Oct 2022 · valid until 11 Oct 2027 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 2 Oct 2028 |
| Land conversion | Converted 15 Apr 2023 · DEPUTY COMMISSIONER BANGALORE DISTRICT | |
|---|---|---|
| Survey numbers | 33 (PART) |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 92 m² 33.6%2BHK · avg 71 m² 31.3%2.5BHK · avg 77 m² 31.3%4BHK 3.1%3.5BHK · 105 m² 0.8%
| 2BHK | 41 | 31,495 |
| 2.5BHK | 41 | 33,831 |
| 3BHK | 44 | 43,379 |
| 3.5BHK | 1 | 1,130 |
| 4BHK | 4 | 6,265 |
| Sold, Q2 2026-27 | 119 / 131 | |
|---|---|---|
| Unsold, Q2 2026-27 | 12 | |
| Months to sell, derived from filed bookings | 6 months |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 0.5 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 0.5 km | Locked |
| Kolte-Patil Lakeside24 This project | This project is the point the others are measured from | 2 Oct 2028 | 91% (119 of 131) | Not verified yet |
|---|---|---|---|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 0.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 0.5 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 4.2 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 270 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the north-west, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.73 (95 covered spaces for 131 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 770 m | |
As the promoter reported it
Taken 1 Jul 2026| Main structure | 15% · planned by 2 Jul 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 11 Feb 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 34% | |
| Completion, accountant | 35% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 11 Mar 2028 | |
| RERA completion date | 2 Oct 2028 | |
| Work began, as filed | 3 Oct 2023 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 83.4 m on the fire NOC · 83.4 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 80 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/353/2022 · issued 6 Oct 2022 · building height 83.4 m | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 22 Jun 2023 | |
| Chartered accountant's certificate, registration | Dated 25 Aug 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹11.66 Cr 12.9%Development · ₹78.57 Cr 87.1%
| Estimated cost | ₹90.23 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q3 2025-26 | ₹90.27 Cr | |
| Cost incurred | ₹31.61 Cr (35% of the estimate) | |
| Cost left | ₹58.66 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹71.75 Cr | |
| Land cost revision | Not verified yet | |
Sold (119) 90.8%Unsold (12) 9.2%
| Sold, Q3 2025-26 | 101 / 131 · 30 available | |
|---|---|---|
| Sold, Q4 2025-26 | 118 / 131 · 13 available | |
| Sold, Q1 2026-27 | 120 / 131 · 11 available | |
| Sold, Q2 2026-27 | 119 / 131 · 12 available | |
| Unsold, Q2 2026-27 | 12 | |
| Sold in Q4 2025-26 | 17 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 1 booking cancelled or corrected (120 → 119 sold) | |
| Flats booked, Form 4 Q1 2026-27 | 120 |
| Escrow bank | Axis Bank · M G Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹7.82 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.08 Cr in Q2 2026-27 (39% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹25,27,57,602 | |
| Net amount withdrawable, Form 4 | ₹7,03,42,085 | |
| Escrow account, Q1 2026-27 | Opened at ₹18.30 Cr, ₹82.5 L withdrawn | |
| Escrow account to date, Q3 2025-26 | ₹29.81 Cr deposited from sales, ₹15.61 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹18,24,15,517 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q1 2026-27 | ₹13,25,35,346 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 2 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | AXIS BANK LIMITED · ₹143.75 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 28 Apr 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · M G Road, Bangalore | |
Taken 1 Jul 2026Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva La Vita, price locked; Adarsh Pinecourt, price locked; The Pearl Paradise, price locked; Sumadhura Epitome, price locked; Sumadhura Solea, price locked.
| Sattva La Vita | 2.3 km | Locked |
|---|
| Sobha City Athena | about 2.5 km | Locked |
|---|
| Adarsh Pinecourt | 2.6 km | Locked |
|---|
| Radiance Floresta | about 2.5 km | Locked |
|---|
| Assetz Zen & Sato | about 3 km | Locked |
|---|
| The Pearl Paradise | 3.5 km | Locked |
|---|
| Tnm Lakeview | about 3.5 km | Locked |
|---|
| Sumadhura Epitome | 3.9 km | Locked |
|---|
| Nava Skanda Bellavita | about 4 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 0.5 km | 31 Dec 2027 | 100% (364 of 364) | Locked |
|---|
| Sattva La Vita | 2.3 km | 12 Jul 2026 | 32% (20 of 63) | Locked |
|---|
| Sobha City Athena | about 2.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
|---|
| Adarsh Pinecourt | 2.6 km | 6 Mar 2026 | 71% (142 of 201) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹46,000 /mo · 18 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹29,500 /mo · 38 listings | |
| Rent, 1BHK, 3 km | ₹11,150 /mo · 8 listings | |
| Rent per sq ft, 3 km | ₹31.2 /mo, as listed · 41 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 59 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 17,228 | |
| Booked | 10,337 of 17,228 (60%) | |
| Unsold | 6,891 | |
| Booked a month, pooled | 393 flats | |
| Months to sell, pooled | 18 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 270 m to the south-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.4 km, Bagalur Cross | |
| Kempegowda Airport | 21.1 | 22 | 13.3 |
| MG Road (CBD) | 17.4 | 21 | 14.2 |
| Manyata Tech Park | 9.2 | 12 | 6.3 |
| ITPL, Whitefield | 25.3 | 29 | 16.0 |
| Ecospace, Bellandur ORR | 30.1 | 39 | 19.4 |
| Electronic City Ph 1 | 38.9 | 45 | 28.9 |
| Landfill or waste transfer station | 660 m to the north-east | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 600 m to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.3 km to the south |