Overview
Klassik Landmark Phase III
Part ofKlassik Landmark2 phases, 440 flats
Overview
Part ofKlassik Landmark2 phases, 440 flats
Overview
Part ofKlassik Landmark2 phases, 440 flats
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 20 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Klassik Landmark Phase III in the interactive atlas
Approval or registration
Land use converted
Special DC (Revenue) Bangalore District · Survey 34/9, 34/10, 34/11, 34/12, 34
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Klassik Enterprises Private Limited · Survey 34/9, 34/10, 34/11, 34/12, 34
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ARO · Survey 34/9, 34/10, 34/11, 34/12, 34
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/ADDL.DIR/JDNORTH/0075/19-20
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/210222/004720
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 33, 35 (Junnasandra); Survey 23 (Kasavanahalli); tank |
| East | EC schedule not read yet | Survey 39 (Halanayakanahalli); Survey 31 (Junnasandra) |
| South | EC schedule not read yet | Survey 40, 41, 72, 75 (Halanayakanahalli); Survey 72 (K.G.Choodasandra) |
| West | EC schedule not read yet | Survey 24, 25, 26, 27 (Kasavanahalli); stream |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 1,89,588 sq m | |
| Land area filed with K-RERA | 9,472 sq m | |
| Filed area as a share of the KGIS plots' area | 5% | |
| Village, hobli and taluk on the KGIS map | Junnasandra, Varturu-2 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 34/9, 34/10, 34/11, 34/12 & 34 | |
|---|---|---|
| Land extent, Sy 34/9, 34/10, 34/11, 34/12 & 34 | 2 Acres 14 Guntas for 3rd Phase | |
| Area on the KGIS map | 1,89,588 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 9,472 sq m | |
| Khata | A Khatha · ARO · 5 Apr 2013 | |
| Sale deed | Dated 4 Mar 2013 | |
| Sale deed in favour of | Klassik Enterprises Private Limited | |
| Title deed | Sy 34/9 | |
| Title deed | Consideration ₹1.26 Cr | |
| Title deed | Sy 34/12 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 34/9 | 1 | 2 acres 19 guntas | Not read yet | ||||
| Sy. No. 34/10 | 5 | 4 acres 21 guntas | Not read yet | ||||
| Sy. No. 34/11 | 2 | 2 acres | Not read yet |
| Joint development agreement number | 276 of Book 1, 2013-14 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BBMP) | Sanctioned 21 May 2020 · No. BBMP/ADDL.DIR/JDNORTH/0075/19-20 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | GBC(1)520/2012 | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2023 |
| Land conversion | Converted 9 Jun 2005 · Special DC (Revenue) Bangalore District | |
|---|---|---|
| Survey numbers | 34/9, 34/10, 34/11, 34/12 & 34 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK 4BHK · avg 91 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK 4BHK | 236 | 983 |
| Klassik Landmark Phase III This project | This project is the point the others are measured from | 31 Dec 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Haven Phase 2 | about 2 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
| Satori Residence By Genurise | 2.0 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 1.6 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 190 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 480 m to the north, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.67 (394 covered spaces for 236 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 320 m | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 4 Nov 2023 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Nov 2023 | |
| RERA completion date | 31 Dec 2023 | |
| Work began, as filed | 27 Oct 2020 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.9 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 100 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | GBC(1)520/2012 | |
| Environmental clearance | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹10.00 Cr 7.6%Development · ₹121.45 Cr 92.4%
| Estimated cost | ₹131.45 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (148) 91.4%Unsold (14) 8.6%
| Flats sold, at completion | 148 | |
|---|---|---|
| Flats unsold, at completion | 14 | |
| Flats in the phase | 162 |
| Escrow bank | Union Bank of India · HSR LAYOUT | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 21 May 2020 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Union Bank of India · HSR LAYOUT | |
Map of 10 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Satori Residence By Genurise, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Adarsh Rosewood, price locked; 63 Degree East - Tower E, price locked; Birla Evara, price locked; Mana Jardin Neo, price locked; Assetz Ren & Rei, price locked.
| Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 2.7 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 2.7 km | Locked |
|---|
| Abhee Riviera Royale | about 2.5 km | Locked |
|---|
| Adarsh Rosewood | 2.8 km | Locked |
|---|
| 63 Degree East - Tower E | 3.1 km | Locked |
|---|
| Birla Evara | 3.2 km | Locked |
|---|
| Mana Jardin Neo | 3.2 km | Locked |
|---|
| Assetz Muse & Maison | about 3.5 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 |
|---|
| 2.3 km |
| 30 Dec 2030 |
| 69% (302 of 440) |
| Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 2.7 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 2.7 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 2.7 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹96,000 /mo · 21 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹68,000 /mo · 228 listings | |
| Rent, 2BHK, 3 km | ₹41,000 /mo · 302 listings | |
| Rent, 1BHK, 3 km | ₹21,000 /mo · 104 listings | |
| Rent per sq ft, 3 km | ₹37.8 /mo, as listed · 328 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 79 (32 with an approximate location) | |
|---|---|---|
| Flats in them | 21,141 | |
| Booked | 12,120 of 21,141 (57%) | |
| Unsold | 9,021 | |
| Booked a month, pooled | 259 flats | |
| Months to sell, pooled | 34 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 190 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 3.2 km, Ibbalur | |
| Kempegowda Airport | 48.0 | 53 | 33.7 |
| MG Road (CBD) | 15.7 | 22 | 12.1 |
| Manyata Tech Park | 24.4 | 32 | 17.7 |
| ITPL, Whitefield | 20.1 | 24 | 11.8 |
| Ecospace, Bellandur ORR | 7.5 | 12 | 3.2 |
| Electronic City Ph 1 | 10.3 | 12 | 6.4 |
| Landfill or waste transfer station | 1.7 km to the south | |
|---|---|---|
| Sewage treatment plant | 1.6 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | 1.8 km to the south-west, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 1.7 km to the north-west |